会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 11. 发明公开
    • 해저 드릴링 시스템
    • SUBSEA钻孔系统
    • KR1020160036266A
    • 2016-04-04
    • KR1020140128240
    • 2014-09-25
    • 대우조선해양 주식회사
    • 배재류추교식김성수김정민서재원김웅지추길환홍진철김지윤박희환
    • E21B19/14E21B19/02E21B7/12E21B21/00E21B41/08
    • E21B19/143E21B7/122E21B19/02E21B21/001E21B41/08
    • 본발명은해저드릴링시스템에관한것으로서, 더욱구체적으로는시추에사용되는파이프의적재공간에대한활용도를높이도록하고, 유정에최대한인접하여시추작업을수행할수 있도록함으로써시추구조물의정밀한위치고정에대한제한을해소할수 있으며, 랙킹아암의로딩및 언로딩의동작거리를최소화할수 있고, 파이프의핸들링시간을단축시킬수 있으며, 시추작업의신속성및 신뢰성을증대시킬수 있고, 해양환경규제를만족시킴으로써해양오염을방지할수 있는해저드릴링시스템에관한것이다. 본발명에따른해저드릴링시스템은해저의 BOP(Blow-Out Preventer)에설치되고, 내측에기밀을유지하는설치공간이마련되는본체; 상기설치공간내에설치되고, 시추에필요한파이프가다수로적재되는파이프매거진; 상기파이프매거진으로부터파이프를언로딩시키도록상기설치공간내에설치되는랙킹아암; 및상기랙킹아암으로부터파이프를전달받아연결시켜서상기 BOP를통해서시추작업을수행하는드릴링드라이브;를포함한다.
    • 本发明涉及一种海底钻井系统,更具体地说,涉及一种可以增加钻井中使用的管道的装载空间利用率的海底钻井系统,并且可以通过最大程度地执行钻井作业来解决钻井结构的精确定位的限制 靠近油井,可以最大限度地减少装卸臂的装卸作业距离,缩短管道的搬运时间,可以提高钻井作业的速度和可靠性,可以通过满足海洋污染防止海洋污染 环境监管。 根据本发明的海床钻井系统包括:主体,其安装在海床上的防喷器(BOP)上,并且具有内部保持气密性的安装空间; 一个安装在安装空间内的管箱,装有钻井所需的多个管道; 安装在安装空间的卸载臂将管道从管道仓卸载; 以及钻孔驱动器,其通过从支架臂输送管道并连接管道,通过BOP进行钻孔作业。
    • 14. 发明公开
    • 지하수 개발용 시추기의 시추로드 장착장치
    • 钻机钻头安装装置
    • KR1020150001234A
    • 2015-01-06
    • KR1020130074107
    • 2013-06-27
    • 최병진
    • 최병진
    • E21B19/00E21B19/14E21B19/18
    • E21B7/021E21B7/022E21B19/10
    • 본 발명은 지하수 개발용 시추기의 시추로드 장착장치에 관한 것으로, 시추기의 수평프레임 선단에 수직상으로 설치된 수직프레임 상단에 회전가능하게 연결되어 있는 승강안내프레임과, 상기 승강안내프레임을 수직상으로 기립시키거나 수평상으로 눕혀놓을 수 있도록 하는 기복작동용 유압실린더와, 상기 승강안내프레임을 따라 상,하로 승강작동을 하는 시추헤드와, 상기 시추헤드의 저부에 장착되어 시추로드를 연결 및 분리할 수 있도록 함과 동시에 연결 조립된 시추로드를 회전작동시켜 시추작업을 가능하게 하는 회전축과, 상기 시추헤드의 일측에 위치하도록 승강안내프레임의 상,하부에 연결되는 상,하부 로드보충통과, 상기 상,하부 로드보충통 각각에 회전가능하게 장착된 로드회전판에 일정각도록 형성되어 있는 로드수납홈 각각에 인출 및 수납이 가능하게 보관되는 복수의 시추로드를 포함하고 있는 지하수 개발용 시추기의 시추로드 장착장치에 있어서,
      상기 승강안내프레임의 상,하측 각각에 고정 부착된 회전용 브라켓의 힌지축에 회전가능하게 장착되어 있는 상,하부 회전작동암과;
      상기 상,하부 회전작동암 각각의 자유단에 핀축으로 회전가능하게 장착되어 있으며, 상기 상,하부 회전작동암 각각의 자유단에 형성되어 있는 고정파지부 측으로 시추로드가 삽입되는 것을 허용함과 동시에 상기 고정파지부에 삽입된 시추로드를 붙잡아주거나 놓아주는 작동을 수행하도록 형성되어 있는 가동파지부와;
      상기 상,하부 회전작동암 각각에는 실린더몸체의 일단이 힌지축에 회전가능하게 연결되고, 피스톤로드의 선단은 상,하부 회전작동암의 자유단 일측을 관통하는 핀축을 회전중심으로 하여 회전하면서 시추로드를 붙잡아주거나 놓아주는 가동파지부의 끝단을 관통하는 핀에 연결되어 있는 로드파지용 유압실린더와;
      상기한 회전용 브라켓과는 일정간격으로 이격된 위치에 형성되어 있는 고정용 브라켓을 관통하는 지지축에 실린더몸체의 일단이 회전가능하게 연결되어 있으며, 피스톤로드의 선단은 상기 상,하부 회전작동암 각각의 일측을 관통하는 고정핀축에 회전가능하게 연결되어 있는 로드이동용 유압실린더;를 더 포함하여 구성된 것을 특징으로 하는 발명이다.
    • 本发明涉及一种用于地下水开发的钻井机的钻杆安装装置,更具体地说,涉及一种钻杆安装装置,该钻杆安装装置一个接一个地从上下杆补充容器中依次拔出多个钻杆,并将钻杆 连接到组装的钻头的旋转轴。 钻杆安装装置包括:提升引导框架,其连接到要旋转的钻孔机的垂直框架的顶端; 用于升降操作的液压缸,其控制升降引导架; 一个沿升降导轨架上下升降的钻头; 旋转轴,其能够在连接和分离钻杆的同时旋转钻杆进行钻孔作业; 上杆和下杆补充容器,其连接到升降引导架的顶部和底部; 以及多个钻杆,其容纳在安装在上下杆补充容器中的棒旋转板中形成的杆接收槽中以被拉入和拉出。
    • 15. 发明公开
    • 드릴링 유니트용 튜블라 스토리지 지지대
    • 用于钻孔机组的管状储存架
    • KR1020140062985A
    • 2014-05-27
    • KR1020120129359
    • 2012-11-15
    • 대우조선해양 주식회사
    • 박재서
    • B63B35/44E21B19/14B63B25/00B65G1/14
    • The present invention relates to a tubular storage stanchion for a drilling unit and, more specifically, to a tubular storage stanchion for a drilling unit which is provided to omit a process installing a deck beam on a deck, thereby reducing man hours and production costs; to prevent the center of gravity of a ship from moving upwards, thereby improving stability of the ship; and to be freely installed on a desired position at predetermined intervals, thereby not obstructing a passage for workers. The tubular storage stanchion for a drilling unit according to the present invention comprises a foundation plate installed on a desired position of a deck; a support mounting unit provided on the foundation plate; a load applying support stood and installed on the support mounting unit to apply load and support a tubular material when the tubular material is loaded.
    • 本发明涉及一种用于钻井单元的管状储存支柱,更具体地说,涉及一种用于钻井单元的管状储存支柱,其被设置为省略在甲板上安装甲板梁的过程,从而减少了工时和生产成本; 以防止船舶的重心向上移动,从而提高船舶的稳定性; 并且以预定间隔自由地安装在期望的位置,从而不妨碍工人的通道。 根据本发明的用于钻井单元的管状储存支柱包括安装在甲板的期望位置上的基础板; 设置在基础板上的支撑安装单元; 负载施加支撑件站立并安装在支撑安装单元上以在管状材料被加载时施加负载并支撑管状材料。
    • 16. 发明公开
    • 해양구조물의 드릴 장비 핸들링 시스템
    • 钻井设备钻井设备处理系统
    • KR1020140058999A
    • 2014-05-15
    • KR1020120125560
    • 2012-11-07
    • 대우조선해양 주식회사
    • 최규현
    • E21B19/14B63B35/44B63B27/08
    • B63B35/4413B63B27/08B63B27/12B63B2708/00
    • The present invention relates to a drilling equipment handling system for a marine structure, comprising a handling unit which is connected by a wire from a winch arranged between the outside of a wind wall arranged along the edge of a drill floor provided on the upper deck of the hull and a crane conveying a riser toward the drill floor, and which is formed on the wind wall by cutting to connect the wire through an inlet being connected between the crane and the drill floor and to transfer or control various equipment inside the drill floor connected with the wire, so that various kinds of heavy materials including a diverter of the drill floor can be handled with small energy consumption by using existing equipment, such as the winch of the hull.
    • 本发明涉及一种用于海洋结构的钻井设备处理系统,包括一个处理单元,该处理单元通过布置在沿着设在上层甲板上的钻台的边缘布置的风壁的外侧之间的绞盘连接 船体和起重机将提升板输送到钻台上,并且通过切割形成在风壁上,以通过连接在起重机和钻台之间的入口连接电线,并且传送或控制钻台内的各种设备 与电线连接,通过使用现有的设备(如船体绞盘),可以以较小的能量消耗包括钻台的分流器在内的各种重型材料。
    • 17. 发明授权
    • 드릴쉽의 라이저 적재구조
    • 上升的铲斗结构
    • KR101392693B1
    • 2014-05-12
    • KR1020130024567
    • 2013-03-07
    • 현대중공업 주식회사
    • 김도훈김대섭최정호고창길심왕보이환식김영호정기성
    • B63B35/44E21B19/14
    • A riser piling structure for a drill ship according to the present invention comprises: multiple first racks installed inside a riser piling space of a hull in a row at predetermined intervals, and having a first insertion groove formed on the rear surface thereof in a vertical direction, respectively; second racks installed in parallel with the first racks in a row at the predetermined intervals, and having a second insertion groove vertically formed on the rear surface opposite to the first insertion groove, respectively; horizontal parts horizontally installed in a state where longitudinal one ends are inserted in the first and second insertion grooves, and multi-stepped along the vertical and longitudinal directions of the first and second racks by coupling the other ends to both walls of the piling space or adjacent structures; and a pair of vertical parts vertically mounted on the bottom of the horizontal parts, and having longitudinal one ends coupled to both ends of the first and second racks based on the horizontal parts.
    • 根据本发明的用于钻船的立管桩结构包括:以预定间隔安装在船体的立管堆叠空间内的多个第一机架,并且具有在其后表面上沿垂直方向形成的第一插槽 , 分别; 第二机架以预定间隔与第一机架平行布置成一排,并且具有分别垂直形成在与第一插入槽相对的后表面上的第二插入槽; 水平部件水平地安装在纵向一端插入第一和第二插入槽中的状态下,并且通过将另一端连接到打桩空间的两个壁,沿着第一和第二机架的纵向和纵向方向多级地 相邻结构; 以及垂直安装在水平部分的底部上的一对垂直部分,并且其纵向一端基于水平部分联接到第一和第二机架的两端。
    • 19. 发明公开
    • 드릴용 파이프 핸들링 장치
    • 钻管处理装置
    • KR1020130033649A
    • 2013-04-04
    • KR1020110097447
    • 2011-09-27
    • 김판준
    • 김판준
    • E21B19/16E21B19/14
    • E21B19/161E21B7/02
    • PURPOSE: A pipe handling device for a drill is provided to prevent in advance safety accidents for an operator and to improve the efficiency of a connecting work by not requiring manual work. CONSTITUTION: A pipe handling device for a drill comprises a position moving means. The position moving means locates a connection object pipe(11) to the same axle of a non connection pipe(12) based on the electrical signals. The position moving means comprises a position moving plate(30), a first rotation unit(40), and a second rotation unit(50). The second rotation unit is rotated with the connection object pipe and is arranged with the non connection pipe in parallel. The non connection pipe is located in the same axle of the connection object according to the rotation of the first rotation unit.
    • 目的:提供用于钻头的管道处理装置,以预防操作人员的安全事故,并通过不需要手动工作来提高连接作业的效率。 构成:用于钻头的管道处理装置包括位置移动装置。 位置移动装置基于电信号将连接对象管(11)定位到非连接管(12)的同一轴上。 位置移动装置包括位置移动板(30),第一旋转单元(40)和第二旋转单元(50)。 第二旋转单元与连接对象管一起旋转并且与非连接管平行布置。 非连接管根据第一旋转单元的旋转位于连接对象的同一轴上。