会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 101. 发明公开
    • 초소구경관 추진공법 및 그 장치
    • 便携式装置和非常小直径管道的推进方法
    • KR1020080014442A
    • 2008-02-14
    • KR1020060076180
    • 2006-08-11
    • 건양씨엔이 (주)
    • 한민호오범용
    • F16L1/00E21D9/00E03F3/06E02F5/16
    • F16L1/028E03F3/06E21D9/00F16L1/06
    • A method and a device for propulsion of a very small diameter pipe are provided to utilize electricity, a small electric generator, or power for using at home by reducing size of a hydraulic device as power source of a propulsion device. A device for propulsion of a very small diameter pipe comprises an advanced base(A) installed at the ground(B) to be constructed, a pump or a water supply source(1) installed on the ground having a water pipe, a hydraulic unit(3), a position tracking device(300), a hemi-rectangular step board(10), a fixing metal, a rail(11), and a small high capacity hydraulic motor(5) and a rod rotation speed change device(4). The hydraulic unit is placed at the other one side of the ground, and has one side connected with the power(2) and the other side connected with a hydraulic hose(9). The hemi-rectangular step board is installed at the lowest part of the advanced base and includes an inner space. The rod rotation change device consists of a rod rotation speed change shaft, a rod driving shaft, a water jet, a rod attaching device having a rod(20), a hydraulic hose attaching part, a rod fixing device(30), a steel plate(7), a rod, a back rimmer, and two multi-step hydraulic cylinders. The rod driving shaft is connected to a belt of the driving shaft of the small high capacity hydraulic motor, and installed at the outside of the rod rotation change device. The water jet is positioned at the other side of the rod driving shaft.
    • 提供了一种用于推进非常小直径的管道的方法和装置,以便通过减小作为推进装置的动力源的液压装置的尺寸来利用电力,小型发电机或在家中使用的动力。 用于推进非常小直径管道的装置包括安装在要被构造的地面(B)处的高级基座(A),安装在具有水管的地面上的泵或供水源(1),液压单元 (3),位置跟踪装置(300),半矩形步进板(10),固定金属,轨道(11)和小型高容量液压马达(5)和杆旋转速度改变装置 4)。 液压单元位于地面的另一侧,并且一侧与动力(2)连接,另一侧与液压软管(9)连接。 半圆形台阶板安装在高级底座的最低处,包括内部空间。 杆旋转改变装置由杆转速变更轴,杆驱动轴,水射流,具有杆(20)的杆附接装置,液压软管安装部,杆固定装置(30),钢 板(7),杆,后边缘和两个多级液压缸。 杆驱动轴连接到小容量液压马达的驱动轴的皮带上,并安装在杆旋转更换装置的外部。 水射流位于杆驱动轴的另一侧。
    • 102. 发明授权
    • 하수관 보수용 탈취 장치 및 그 방법
    • 缝管修复除臭装置及方法
    • KR100801190B1
    • 2008-02-04
    • KR1020070093338
    • 2007-09-13
    • 덕산건설 주식회사
    • 박광규
    • E03F9/00E03F3/06E03F5/02F16L55/165F16L55/18E02D29/00E02D37/00
    • E03F3/06B29C63/36E03F5/08E03F2003/065
    • A deodorization device is provided to keep working environment pleasant and to prevent environmental pollution by removing offensive odor generated from an inversion tube and a manhole when hardening an inversion tube for repairing a sewer pipe. A deodorization device for removing offensive odor caused while repairing a sewer pipe using an inversion tube comprises one or more drawing pipes inserted to an inversion tube turned reversely into a sewer pipe through a manhole to exhaust hot air used for hardening in the inversion tube, an air tank connected to the drawing pipes to collect the hot air discharged from the drawing pipes in one spot and provided with a drain valve to discharge condensed water, a spiral steel cooling pipe connected to an exhaust port of the air tank to cool down the hot air discharged in the inversion tube by heat exchange with the air, and a deodorizing device(100) connected to an outlet of the spiral steel cooling pipe to inhale air through a hose(103) from the air tank and to remove offensive odor and provided with a deodorizing container(102) composed of a dust filter(104) removing dust contained in the hot air discharged through the spiral steel cooling pipe, deodorant(106) placed at the backside of the dust filter to remove offensive odor and an active carbon filter(108) placed at the backside of the deodorant, a blower fan(110) installed at the backside of the active carbon filter to inhale and exhaust air, and a corrugated pipe(120) connected with the manhole to inhale and remove offensive odor generated from the manhole.
    • 提供除臭装置,以便在对用于修理下水道管道的倒置管进行硬化时,通过去除反转管和人孔产生的恶臭来防止工作环境愉快并且防止环境污染。 用于消除使用反转管修复下水道管时引起的恶臭的除臭装置包括插入反转管的一个或多个拉管,其通过人孔相反地倒入下水管,排出用于在反转管中硬化的热空气, 空气罐与抽气管连接,收集从一个点抽出管排出的热空气,并设有排水阀,以排出冷凝水;螺旋钢冷却管,连接到空气罐的排气口以冷却热量 通过与空气进行热交换而在反转管中排出的空气,以及与螺旋钢冷却管的出口连接的除臭装置(100),通过来自空气罐的软管(103)吸入空气,除去异味,并提供 具有由除尘过滤器(104)构成的除臭容器(102),去除通过螺旋钢冷却管排出的热空气中所含的灰尘,设置在后侧的除臭剂(106) f除尘过滤器以除去恶臭,以及放置在除臭剂背面的活性炭过滤器(108),安装在活性炭过滤器背面以吸入和排出空气的鼓风机(110)和波纹管( 120)与人孔相连,以吸入和去除人孔产生的恶臭。
    • 103. 发明公开
    • ASSEMBLED DRAINAGE DITCH AND CONSTRUCTION METHOD OF USING THEREOF
    • 组装排水井及其使用的施工方法
    • KR20070122190A
    • 2007-12-28
    • KR20070127298
    • 2007-12-10
    • PARK IN KU
    • PARK IN KU
    • E03F5/00E02B5/00
    • E02D31/02E01C11/224E03F3/06
    • A drainage assembly and a construction method using the same are provided to shorten a construction period by casting concrete on a bottom just after constructing the drainage. A drainage assembly comprises a drainage body(30a), a height adjusting section(60a) and a guide body. At least two drainage bodies are connected to each other to form a continuous drainage. A bracket(56) is formed at a lower portion of the drainage body. The height adjusting section is connected to the bracket so as to adjust the height of the drainage body. The guide member fixes a part of the height adjusting section. The guide member is fixed to a predetermined alignment position to determine the horizontal alignment position of the drainage body.
    • 提供一种排水组件及其施工方法,用于在施工排水后立即将混凝土浇筑在底部,缩短施工周期。 排水组件包括排水体(30a),高度调节部分(60a)和引导体。 至少两个排水体彼此连接形成连续排水。 支架(56)形成在排水体的下部。 高度调节部与支架连接,调节排水体的高度。 引导构件固定高度调节部分的一部分。 引导构件固定到预定的对准位置以确定排水体的水平对准位置。
    • 104. 发明授权
    • PULLING ROLLER APPARATUS FOR REPAIRING PIPE
    • 用于修理管道的滚筒装置
    • KR100785832B1
    • 2007-12-13
    • KR20070014284
    • 2007-02-12
    • HYUNDAE BOND STS CO LTD
    • JEONG KWANG CHEOLMOON JUNG TAK
    • E03F7/00F16L55/16
    • E03F3/06E03F2003/065F16L55/162F16L55/18F16L55/30F16L2101/18
    • A traction roller for repairing a pipeline is provided to prevent a body from hanging on a pipeline by arranging the moving direction of a pipeline using a guide device and to minimize friction between a pipeline and body using a guide wheel of a guide device. A traction roller(100) for repairing a pipeline is provided for moving a curved and bent pipeline as well as a straight pipeline easily and composed of a body, a tube fixing unit placed to the body to fix a tube(50), and a guide device(30) placed to the body to guide the moving direction of the body. The guide device guides the body to the center of a pipeline(90) not to be suspended on the pipeline when the body moves, and includes a guide plate(32) fixed to the side of the body and a guide wheel(34) placed to the side of the guide plate and located on the side of the body. The tube fixing unit includes a fix plate(22) placed to be rotated against the body, a bar(24) pressurizing the fix plate to the body when the body is coupled with the bar using fastening members, and fastening members fixing the bar and the body.
    • 提供了用于修理管道的牵引辊,以通过使用引导装置布置管道的移动方向来防止身体悬挂在管道上,并且使用引导装置的引导轮来最小化管道和主体之间的摩擦。 提供一种用于修理管道的牵引辊(100),用于容易地移动弯曲和弯曲的管道以及直的管道,并且由主体,管体固定单元构成,该管固定单元放置在主体上以固定管(50) 引导装置(30)放置到身体以引导身体的移动方向。 引导装置将主体引导到当主体移动时不被悬挂在管道上的管道(90)的中心,并且包括固定到主体侧的引导板(32)和放置在主体 到导板的侧面并位于身体的一侧。 所述管固定单元包括:固定板(22),被安置成抵靠所述主体旋转;杆(24),当所述主体使用紧固构件与所述杆联接时,将所述固定板加压到所述主体;以及紧固构件, 身体。
    • 105. 发明公开
    • 유체 가속용 배관부재가 결합된 관로 내부 구조
    • 流体加速管道元件的管道内部结构
    • KR1020070115493A
    • 2007-12-06
    • KR1020060050009
    • 2006-06-02
    • (주)이알테크
    • 유형철
    • E03F3/04E03F5/04F16L9/19
    • E03F3/04E03F3/06
    • An inner structure of a pipeline coupled with a piping member for fluid acceleration is provided to apply to the existing pipeline, to make installation easy, to prevent a reduction in the cross section of a pipeline and to increase the velocity of a moving fluid. An inner structure of a pipeline coupled with a piping member for fluid acceleration comprises a pipeline(11) having a ring-shaped cross section structure, many connecting members(12) coupled to the inner circumferential surface of the pipeline at one end, and a piping member(13) coupled to the other end of the connection member, installed along the longitudinal direction of the pipeline and formed to be convex downward. In case of a little amount of a fluid, the fluid flows through the piping member only, and in case of a sufficient amount of a fluid, the pipeline enables to function as a passage together with the piping member.
    • 提供了与用于流体加速的管道构件联接的管道的内部结构以应用于现有管道,使得安装变得容易,以防止管道的横截面减小并且增加移动流体的速度。 与用于流体加速的管道构件联接的管道的内部结构包括具有环形横截面结构的管道(11),在一端连接到管道的内周表面的许多连接构件(12)和 管道构件(13),其联接到所述连接构件的另一端,沿着所述管道的纵向方向安装并且形成为向下凸出。 在少量流体的情况下,流体仅流过管道构件,并且在足够量的流体的情况下,管道能够与管道构件一起用作通道。
    • 106. 发明授权
    • 프리캐스트 기초구조 및 이를 이용한 시공방법
    • 基础结构的预测材料和方法构建基本结构
    • KR100776349B1
    • 2007-11-15
    • KR1020060062357
    • 2006-07-04
    • 나남열
    • 나남열고영일
    • E02D27/46E03F3/06E02B11/00E02B13/00
    • E02D27/46E02B11/00E02B13/00E03F3/06
    • A pre-cast foundation structure and a construction method using the same are provided to eliminate the need of a curing period of the concrete while effectively supporting upper load and differential settlement in a construction site for laying conduits by installing a pre-cast conduit bearing member composed of a support unit and a bearing unit and an upper load bearing part. In a bearing member(10) capable of supporting conduit used as a drain pipe, a sewer pipe, or a water supply pipe, the bearing member is made of EPS(Expandable Polystyrene) of styrofoam. The bearing member has a support unit(20) disposed on one side. The support unit has an insertion groove(21) and a recessed groove(22) on which a conduit socket unit is placed. On the other side of the bearing member, a bearing unit(30) is integrally disposed. The bearing unit has a recessed part(31) corresponding to the body shape of the conduit, and has an upper load supporting part(32) embedded. The upper load supporting part has the same shape as the recessed part of the bearing unit, and includes plural lattice protrusions(33), reinforcing ribs(34), and lower end bearing parts(35). The conduit bearing member has at least one upper load supporting part installed on the bearing unit. The support unit and the bearing unit are made of EPS of styrofoam, and the upper load supporting part embedded in the center portion of the bearing unit is made of a mixture of poly-Etyrene and Fly-ash.
    • 提供了一种预制基础结构及其施工方法,以消除对混凝土的固化期的需要,同时有效地支撑施工现场用于铺设管道的上部载荷和不同沉降,方法是安装预制导管支承构件 由支撑单元和轴承单元以及上承载部构成。 在能够支撑用作排水管的导管的承载构件(10)中,下水管或供水管,该轴承构件由聚苯乙烯泡沫塑料(EPS)(可发泡聚苯乙烯)制成。 轴承构件具有设置在一侧的支撑单元(20)。 支撑单元具有插入槽(21)和凹槽(22),导管插座单元放置在该槽上。 在轴承构件的另一侧,一体地设置有轴承单元(30)。 所述轴承单元具有与所述导管的主体形状对应的凹部(31),并具有嵌入的上部负荷支承部(32)。 上部负载支撑部分具有与轴承单元的凹部相同的形状,并且包括多个格子突起(33),加强肋(34)和下端轴承部(35)。 导管支承构件具有安装在轴承单元上的至少一个上部负载支撑部件。 支撑单元和轴承单元由聚苯乙烯泡沫塑料的EPS制成,并且嵌入在轴承单元的中心部分中的上部负载支撑部分由聚甲醛和飞灰的混合物制成。
    • 107. 发明公开
    • 하수관에 지관을 연결하기 위한 시공 방법 및 그러한 시공방법에 사용되는 지관
    • 将分支管连接到主管及其分支管的结构方法
    • KR1020070099325A
    • 2007-10-09
    • KR1020060030637
    • 2006-04-04
    • 조윤경허완구
    • 조윤경허완구
    • E03F3/04F16L13/10F16L41/08
    • E03F3/06E03F3/04F16L41/08
    • A construction method for connecting a branch pipe to a sewer pipe and a branch pipe used for the construction are provided to make construction simple, to heighten workability and to secure solidity and watertightness. The branch pipe(10) is attached with an auxiliary pad(12) and an adhesive pad(11), wherein the auxiliary pad and the adhesive pad are attached at the distance corresponding to the thickness of a sewer pipe connected with the branch pipe and manufactured with elastic materials such as rubber resins. The construction method for connecting a branch pipe to a sewer pipe comprises the steps of perforating a connecting hole to a sewer pipe to insert a branch pipe, inserting a branch pipe to the connecting hole of the sewer pipe, adhering an auxiliary pad of the branch pipe closely to the inside of the connecting hole of the sewer pipe by pulling out the branch pipe inserted to the connecting hole of the sewer pipe gradually, and applying adhesives such as epoxy on the upper part of the connecting hole of the sewer pipe and attaching an adhesive pad of the branch pipe to the sewer pipe.
    • 为了使施工变得简单,提高了施工性,确保了坚固性和防水性,提供了将分支管连接到下水管和用于结构的分支管的施工方法。 分支管(10)附有辅助垫(12)和粘合垫(11),其中辅助垫和粘合垫以与分支管连接的下水道的厚度相对应的距离附接, 由弹性材料如橡胶树脂制成。 将分支管连接到下水道的施工方法包括以下步骤:将连接孔穿孔到下水管,以插入分支管,将分支管插入下水道的连接孔,将分支的辅助垫 通过逐渐拉出插入下水道连接孔的分支管,将下水道管连接孔的内侧紧紧地配合,在下水道的连接孔的上部附着环氧树脂等粘接剂, 分支管的粘合垫到下水管。
    • 108. 实用新型
    • S형 I빔 부재 고강도하수관
    • 高强度管道,具有屏蔽I梁加强S型结构
    • KR2020070001082U
    • 2007-10-08
    • KR2020070015499
    • 2007-09-14
    • 김영욱
    • 김영욱
    • E03F3/04E02D29/00F16L9/133
    • E03F3/04E03F3/06
    • 본 고안은 합성수지 고강도하수관에 관한 것이다.
      본 고안은 S형태를 이루는 벽체와 I빔의 위 벽체와 아래 벽체로 구성되는 S형 I빔 부재가 일체로 형성되고 또한, 중공부가 있는 사각의 프로파일 내부에 S형 I빔 부재가 일체로 밀착 형성되며, 형성되는 프로파일을 나선형으로 권취하여 합성수지로 접합시킨 고강도하수관에 관한 것으로서, 고강도하수관의 원주둘레 방향으로 프로파일 내부에 형성된 S형 벽체로 하여금 I빔 벽체보다 강한 하중강도를 가지며 또한, 하수관의 지중매립작업시 장비나 작업자의 부주의 또는, 돌이나 외부의 충격에 의해 프로파일 외벽에 일부 핀홀 등이 발생 되어도 I빔의 위 벽체와 아래 벽체를 통해 프로파일의 내벽과 외벽을 보호하여 변형이나 파손을 방어하고, S형 벽체를 통해 중공부의 산과 반대편 산 사이에 흐르는 유체나 프로파일 외부로 프로파일 내부에 흐르는 유� �를 차폐(遮蔽)할 수 있는 것이다.
      S형 I빔부재, 하수관, 프로파일, 차폐
    • 109. 发明授权
    • 구배 프리캐스트 트렌치 구조
    • 预制预倾斜结构
    • KR100758560B1
    • 2007-09-13
    • KR1020060077643
    • 2006-08-17
    • 주식회사 계림폴리콘민병윤
    • 민병윤
    • E03F3/06E03F3/04E03F5/04F16L1/10E02D31/02
    • E03F3/06E02D31/02E03F3/046
    • A presloped precast trench structure is provided to facilitate installation of a drain by modularizing the drain in the unit of 1m to 3m. A presloped precast trench structure comprises a stepped portion(170) formed at the external body of a block(100) to fix a cover to the upper portion of the external body of the block(100). A base(180) is installed at the two lower end portions of the external body of the block(100). A drain section(120) drains sewage. A drain pipe discharges the sewage to a purifier. An embossed section(191) is formed at one side of the external body of the block(100) to facilitate interconnection of the block(100) and another block(100'). An engraved section(192) is located oppositely to the embossed section(191). A connection section(200) is coupled to two lower grooves of a connection portion of the blocks(100,100').
    • 提供一种预制的预制沟槽结构,以便通过将排水管模块化为1m至3m的单位来安装排水管。 预制的预制沟槽结构包括形成在块(100)的外部主体处的台阶部(170),以将盖固定到块(100)的外部主体的上部。 基部(180)安装在块体(100)的外部主体的两个下端部。 排水部分(120)排出污水。 排水管将污水排放到净化器。 在块(100)的外部主体的一侧形成压花部(191),以便于块(100)和另一块(100')的互连。 雕刻部分(192)与压花部分(191)相对。 连接部分(200)联接到块体(100,100')的连接部分的两个下部凹槽。
    • 110. 发明公开
    • CONSTRUCTING METHOD FOR CONECT PIPE OF THE CONCRETE PIPES
    • 混凝土管连接管的构造方法
    • KR20070089663A
    • 2007-08-31
    • KR20070080578
    • 2007-08-10
    • AHN CHEOL SEUNG
    • AHN CHEOL SEUNG
    • E03F3/06F16L41/00
    • E03F3/04E03F3/06F16L1/028F16L21/02F16L41/001F16L41/002F16L41/02
    • A method for manufacturing and constructing a connection pipe is provided to prevent water-leakage when bonding a branch pipe with the connection pipe by allowing the connection pipe to have a linear cylindrical structure. A main pipe(1) having a large diameter is bonded to a branch pipe(2) having a small diameter. A connection part(11) is provided between the main pipe(1) and the branch pipe(2) to allow the branch pipe(2) to be inserted into the main pipe(1). An outlet part(13) is formed at an end portion of a connection pipe(10). The outlet part(13) has a curved structure to prevent an error when repairing the main pipe(1). A collar(12) is supported on the main pipe(1). The color(12) serves as a support when bonding the branch pipe(2) and the connection pipe(10) to the main pipe(1).
    • 提供一种用于制造和构造连接管的方法,用于通过允许连接管具有线性圆柱形结构来防止在与连接管接合分支管时漏水。 具有大直径的主管(1)被接合到具有小直径的分支管(2)上。 在主管(1)和分支管(2)之间设有连接部(11),以允许分支管(2)插入主管(1)中。 出口部分(13)形成在连接管(10)的端部处。 出口部分(13)具有弯曲结构,以便在修理主管(1)时防止错误。 套管(12)支撑在主管(1)上。 当将支管(2)和连接管(10)接合到主管(1)上时,颜色(12)用作支撑件。