会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Tubular member burying method and pit track system
    • 管状构件堆积方法和坑跟踪系统
    • JP2012102528A
    • 2012-05-31
    • JP2010251730
    • 2010-11-10
    • Tsuchiya CorpTsuchiya株式会社
    • YOKOTA FUMIYOSHINAGAYA MASANOBUMORI NOBORUMIZUKOSHI TAKAHISA
    • E21F13/02E01B5/12E21D11/40
    • PROBLEM TO BE SOLVED: To provide a technique for improving a shield method.SOLUTION: A pit track system used for the movement of a shield machine and material transportation in a pit for burying a tubular member is provided. The pit track system includes: a first track which is provided in a face section of a prescribed length from a head part in an excavation section and provided with a first material transportation track used for the material transportation and a subsequent carriage track used for the movement of the subsequent carriage of an excavator, and for which the first material transportation track and the subsequent carriage track are fixed side by side to a pit wall 95 through a first sleeper; a second track which is provided with a second material transportation track used for the material transportation and a second sleeper for fixing the second material transportation track to the pit wall 95, and is arranged at a position closer to the bottom part to the pit wall 95 than the first sleeper in the face section; and a connecting track device 30.
    • 要解决的问题:提供一种改进屏蔽方法的技术。 解决方案:提供一种用于将盾构机运动的坑道系统和用于埋设管状构件的坑中的材料运输。 凹坑轨道系统包括:第一轨道,其从挖掘部分的头部设置在规定长度的面部中,并且设置有用于材料运输的第一材料运输轨道和用于运动的随后的运动轨迹 的第一物料输送轨道和随后的运输轨道通过第一轨枕并排固定在坑壁95上; 设置有用于材料输送的第二材料输送轨道的第二轨道和用于将第二材料输送轨道固定到凹坑壁95的第二轨枕,并且布置在靠近凹坑壁95的底部的位置处 比第一个卧铺在脸部; 和连接轨道装置30.版权所有(C)2012,JPO&INPIT