会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • MANUFACTURING METHOD FOR OUTDOOR STAIR
    • JP2001164722A
    • 2001-06-19
    • JP2000288338
    • 2000-09-22
    • ISHIKAWA HIROSHI
    • ISHIKAWA HIROSHI
    • E04F11/16E04F11/02E04F11/17
    • PROBLEM TO BE SOLVED: To obtain a construction method, by which conventional defects are eliminated and which can be executed simply because labor hours are required owing to painting finishing by a plasterer trowel of a skilled worker and there is a defect in which skill is required particularly in a conventional stair manufacturing method. SOLUTION: A process in which a large number of L-shaped sectional surface external facing boards for constituting the outdoor stair composed of flat treads 1 and vertical stepping-in surfaces 2 in which a plurality of receiving pawls 5 are projected from upper edges at required intervals are used, the applying pieces of mortar 7 are executed at the L-shaped left-right corners of concrete foundation surfaces as the stair or height adjusting tools 40 are pushed against on mortar lumps fed to placing-concrete foundation planes B' by placing the treads of the surface external facing boars A at the next stages in place of the applying pieces, the protruded mortar lumps are leveled by the applying pieces or the height adjusting tools and the receiving pawls, mortar is pushed into openings among the vertical stepping-in surfaces and base concrete, and the whole is fixed is executed successively towards upper stages.
    • 3. 发明专利
    • AUTOMATIC RACK WAREHOUSE
    • JPH0592803A
    • 1993-04-16
    • JP25368391
    • 1991-10-01
    • ISHIKAWA HIROSHIFURUSHO SHOICHI
    • ISHIKAWA HIROSHI
    • B65G1/04B65G1/06B65G1/127
    • PURPOSE:To obtain an automatic rack warehouse which can eliminate the need of a forklift or the like and save the space and is low-priced by leading cargoes to make a vertical box type circulating motion so that the cargoes may be delivered from and stored in the warehouse. CONSTITUTION:At the time of storing cargoes, a cargo 1 carried in a carry-in and carry-out port 7 is transferred on an empty tray 2 on an elevator 5. The elevator 5 is raised and stopped at a position of a rack 4 on an arbitrary stage, and a pusher 8 is torcod to make transfer-action to transfer the cargo 1 placed on the elevator 5 together with the tray 2 to the starting end of the rack 4 of the preseutly available stage. With the abovementioned transfer operation, a tray 2 placed on the terminal end is delivered onto the other elevator 6. Both side elevators 5, 6 are raised and moved to a rack 4 on another stage, and a pusher 9 is placed in transfer operation so that a tray 2 on the elevator 6 is transferred to the terminal end of a rack of the presently available stage. Conseguently, the tray 2 staying at the starting end is delivered onto the elevator 5. At this time, if the tray 2 is empty, the elevator 5 is lowered to the carry-in and carry-out port 7 to be on the standby for storing the next cargo 1.
    • 8. 发明专利
    • BUILDING METHOD
    • JPH05222766A
    • 1993-08-31
    • JP2420992
    • 1992-02-12
    • ISHIKAWA HIROSHI
    • ISHIKAWA HIROSHI
    • E04B1/30E04G21/14
    • PURPOSE:To shorten a building construction period and reduce the cost of construction. CONSTITUTION:A diagonal member 1, a horizontal member 2 and a vertical member 3 serving as a truss structural framework are composed of a concrete columnar member produced at a factory in advance in a state of forming three joint parts 1c, 2c and 3c after exposing a reinforced steel frame member 1a and a reinforcing bar 1b from both ends. These members are assembled together by joining the reinforced steel frame member 1a and the reinforcing bar 1b exposed out of both ends with each other at the construction site, thereby forming a truss structural framework and, after assembling, each floor is paralleled with each other and a joint part alone is surrounded with a temporary frame 5 and thus concrete 6 is palced. With this constitution, operations at the construction site is simplified, and concrete placing is executable in a way of paralleling each floor.