    • 1. 发明专利
    • Apparatus and method for soil improvement
    • 土壤改良装置及方法
    • JP2009019374A
    • 2009-01-29
    • JP2007181336
    • 2007-07-10
    • Seiwa Renewal Works Co LtdTaisei Corp大成建設株式会社成和リニューアルワークス株式会社
    • ARAI MASAOSUZUKI KURAOFUJITANI TOSHIMITAKEUCHI AKIHIDEENDO KENICHISAKAGAMI YOSHIHARU
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide a soil improvement apparatus and a soil improvement method using the apparatus capable of performing high-quality soil improvement by the method with excellent workability.
      SOLUTION: The soil improvement apparatus 1 is provided with a drive motor; an excavating shaft 2 rotated by the motive power of the drive motor; an excavation blade 10 arranged at the lower end of the excavating shaft 2 rotated accompanied by the rotation of the excavation shaft 2; and an agitating part 20 arranged above the excavation blade 10 rotated accompanied by the rotation of the excavation shaft 2. An excavated-material discharge opening 14 is formed at the excavation blade 10, and a solidifying-material discharge opening 31 is formed above the agitating part 20. There is also provided the soil improvement method.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种使用能够通过具有优异的可加工性的方法进行高质量土壤改良的装置的土壤改良装置和土壤改良方法。 解决方案:土壤改良装置1设置有驱动马达; 由驱动电动机的动力旋转的挖掘轴2; 挖掘叶片10,布置在挖掘轴2的下端,伴随着挖掘轴2的旋转而旋转; 以及设置在挖掘叶片10的上方的搅拌部20,伴随着挖掘轴2的旋转而旋转。在挖掘叶片10处形成挖掘材料排出口14,在搅拌器的上方形成固化材料排出口31 另外还提​​供了土壤改良方法。 版权所有(C)2009,JPO&INPIT
    • 4. 发明专利
    • Excavator
    • 挖掘机
    • JP2004044277A
    • 2004-02-12
    • JP2002204775
    • 2002-07-12
    • Seiko Kogyo KkTaisei Corp大成建設株式会社成幸工業株式会社
    • SUZUKI KURAOTAKASE YOSHIYUKIARAI MASAOFUJITANI TOSHIMIKANEKO KENICHIAKITA JUNICHIHAYASHI SEISHIITO TOSHIO
    • E02F5/02
    • PROBLEM TO BE SOLVED: To provide an excavator which carries out excavation of a groove with high accuracy while ensuring high stability, enhances the working efficiency thereof, and is available for excavation of grooves having different forms.
      SOLUTION: The excavator 1 includes a rotating means 20 which is comprised of a fixed shaft 21, a first agitating means 50, an excavating means 30, and a second agitating means 40. The fixed shaft 21 is supported by a base machine 10. The first agitating means 50 has its first agitating shaft 54 connected to a hollow motor 51, and is rotatable around the first agitating shaft 54 and the fixed shaft 21 penetrating the hollow motor 51. The excavating means 30 is arranged under the first agitating means 50, and its excavating shaft 35 having an excavating blade 33 is connected to a hollow motor 31, whereby the excavating means 30 is rotatable around the fixed shaft 21 inserted into the hollow motor 31. The second agitating means 40 has a second agitating shaft 44 connected to a hollow motor 41, and is rotatable around the second agitating shaft 44 and the excavating shaft 35 penetrating the hollow motor 41.
      COPYRIGHT: (C)2004,JPO
    • 要解决的问题:提供一种在确保高稳定性的同时高精度地进行挖沟的挖掘机,提高其工作效率,并且可用于挖掘具有不同形式的槽。 解决方案:挖掘机1包括由固定轴21,第一搅拌装置50,挖掘装置30和第二搅拌装置40组成的旋转装置20.固定轴21由基座机 第一搅拌装置50具有连接到中空马达51的第一搅拌轴54,并且可围绕第一搅拌轴54和贯穿中空马达51的固定轴21旋转。挖掘装置30布置在第一搅拌 装置50,具有挖掘刀片33的挖掘轴35连接到中空马达31,由此挖掘装置30能够绕插入中空马达31的固定轴21转动。第二搅拌装置40具有第二搅拌轴 44连接到中空马达41,并且可绕第二搅拌轴44和穿过中空马达41的挖掘轴35旋转。版权所有(C)2004,JPO
    • 8. 发明专利
    • CONSTRUCTION METHOD OF CONTINUOUS UNDERGROUND WALL
    • JPH09221750A
    • 1997-08-26
    • JP5550396
    • 1996-02-19
    • TAISEI CORP
    • NAITO TEIJIARAI MASAOOBARA SUNAOARIYAMA MOTOSHIGE
    • E02D5/20
    • PROBLEM TO BE SOLVED: To make it possible to change the thickness of an underground wall to comply with stress and thereby execute work by inserting a cage which reduces its upper wall thickness into an excavated ditch and inserting a wedge- like pull-out form into the ditch in such a state that its maximum width side may be positioned on the upper part and then placing concrete. SOLUTION: A general excavating machine is used to excavate a ditch whose thickness is uniform from the upper end to the bottom where the ditch is excavated while a stabilizing liquid is being filled up. Then, a cage 2, whose upper part is thinly shaped up, is lowered and inserted into the ditch. Then, a wedge- like pull-out type form 3 is inserted into the ditch and then concrete is placed into the ditch. When the concrete is cured and unaided support is available, the wedge-like pull-out form 3 is pulled up to the ground. Then, a slope-shaped space is produced in that area. To comply with this, a backfill material is filled up so as to prevent the collapse of the ditch if the space is located on a natural ground side. This construction makes it possible to change the thickness of an underground wall, responding to stress and thereby execute work.
    • 9. 发明专利
    • UNDERGROUND WALL AND METHOD FOR BUILDING THE SAME
    • JPH07268863A
    • 1995-10-17
    • JP31116294
    • 1994-11-21
    • TAISEI CORP
    • YOKOYAMA MASAHARUOBARA SUNAOHIRAOKA HIROSHIARAI MASAO
    • E02D5/18E02D5/20
    • PURPOSE:To provide an underground wall which can be used as an impervious wall during construction work and which can be made permeable after completion of construction work by disposing a biodegradable material in a permeable hole passing through the underground wall. CONSTITUTION:An excavated groove 3 is excavated in the ground and a cage of reinforcing bar 12 is disposed in the groove 3. A permeable pipe 21 is disposed at several points of the cage 12 so that the opposite ends of the pipe 21 are positioned adjacent to a permeable layer 31. Next, the opposite ends of the pipe 21 are closed with a cover 23 made of biodegradable material and the outer surface of the cover 23 is coated with a thin film 24 and also water sealing material 26 is filled into the peripheral surface of the cover 23. And concrete is cast into the groove 3 and cured to construct an underground wall. And muddy water mixed with bacteria is supplied from a supply pipe 25. As a result, after completion of the construction work, when the cover 23 is biodegraded and ceases to exist, the pipe 21 becomes permeable so that flow of underground water is restored.