    • CONSTRUCTION METHOD FOR BASE ISOLATION BUILDING BY REVERSE DRIVING CONSTRUCTION METHOD
    • JPH1018322A
    • 1998-01-20
    • JP17603996
    • 1996-07-05
    • TAKENAKA KOMUTEN CO
    • URANO TOSHIHARUNISHIYAMA MASANAOHASE OSAMUSATO FUMIOYONEYAMA KAZUHIDEISHIKAWA YOSHIHIRO
    • E02D29/045E21D13/00
    • PROBLEM TO BE SOLVED: To improve stability of an earth retaining frame, and shorten a construction period by constructing a floor and a bean of a column base footing above a footing beam constructed on an excavating bottom surface after an earth retaining wall and a structural center column are constructed, and supporting the center column by a base isolation device by cutting it off in a part of a base isolation layer after a building upper load is supported by timbering. SOLUTION: After an earth retaining wall 1 and a structural center column 2 are constructed underground, a first story floor 4 and a beam 5 are constructed on a ground surface level. The, secondary excavation is performed, and a process to construct an underground first story floor 4' and a bean 5' is repeated, and a footing beam 7 is constructed on an excavating bottom surface in the stage when the ground is excavated up to the final excavating level. A floor 8 and a beam being a column base footing are constructed above the footing beam 7, and a base isolation layer 10 is formed between it and the footing beam 7. After an underground outer wall 13 and an underground story column 14 of a building are constructed in this stage, the building is supported by timbering 11 arranged between the footing beam 7 and a column base footing beam, and among the column 2, a part exposed to the base isolation layer 10 is cut off, and a base isolation device 12 is installed, and the timbering 11 is removed, and is replaced with support by the base isolation device 12.