会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Support structure of natural ground and support method of natural ground
    • 自然地基的支撑结构和自然地基的支撑方法
    • JP2008255614A
    • 2008-10-23
    • JP2007097671
    • 2007-04-03
    • Ohbayashi Corp株式会社大林組
    • KANAI MAKOTOMIKI KEIZOUEDA JUN
    • E21D9/04E21D9/01E21D13/02
    • PROBLEM TO BE SOLVED: To provide a support structure and a support method of the natural ground, capable of supporting an excavation expected part even under the ground of the deep depth. SOLUTION: This support structure 1 supports the periphery of the excavation expected part 10 in advance when excavating the natural ground 8 between two shield tunnels 2 and 4, and has a circular arc-shaped bent pipe 16, a reinforcing steel material 26 arranged in this bent pipe 16, a solidifying material 30 filled in the bent pipe 16, the improved ground 8A of improving the ground around the bent pipe 16, and a support material 6 arranged in the natural ground 8 above and below the excavation expected part 10. COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供自然地面的支撑结构和支撑方法,即使在深层的基础上也能支撑挖掘预期部分。 解决方案:当在两个盾构通道2和4之间挖掘天然地面8时,该支撑结构1预先支撑挖掘期望部分10的周边,并且具有圆弧形弯曲管16,加强钢材26 布置在该弯曲管16中,填充在弯曲管16中的固化材料30,改进的弯曲管16周围的地面的改进的地面8A和布置在挖掘期望部分的上方和下方的自然地面8中的支撑材料6 10.版权所有(C)2009,JPO&INPIT
    • 3. 发明专利
    • 位置検出用アンテナ防護構造
    • 用于位置检测的天线保护结构
    • JP2014206029A
    • 2014-10-30
    • JP2013085623
    • 2013-04-16
    • 株式会社大林組Ohbayashi Corp
    • MIKI KEIZOYAMAMOTO HIROAKIUEDA JUNSAKAMOTO MASAAKITERASONO HIROTAKEMATSUURA AKIRA
    • E21D9/06G01V3/00G01V15/00
    • 【課題】シールドマシンの位置検出用アンテナにおける機能を良好に維持しつつ、掘削中の破損を防止可能とする。【解決手段】互いに対向した切羽を形成する2台の掘削機の相対位置を検知すべく、一方の掘削機に備わる無線ICタグの読み取りを行う、他方の掘削機11に備わるタグリーダーのアンテナ12〜14を防護する構造100において、他方の掘削機11における金属製の殻体33の内側に設けられ、掘削機外周面34に形成されたスリット状の開口35と当該開口35と連続した掘削機先端面36の開口37とを備えた筒状部38〜40に対し、当該筒状部38〜40の内壁41から離間し、かつスリット状の開口35から筒状部中心43に向けて離間した位置にてアンテナ12〜14を固定する。【選択図】図2
    • 要解决的问题:为了防止挖掘过程中的破坏,同时保持屏蔽机器的位置检测的天线的功能处于优良状态。解决方案:在保护标签读取器的天线12-14的结构100中,用于检测相关位置 形成工作面的两台挖掘机彼此面对,读取设置在一台挖掘机中的无线IC标签,并设置在另一台挖掘机11中,每个天线12-14固定在每个安装在金属外壳内的圆筒部38-40中 在另一个挖掘机11中的主体33设置有形成在挖掘机外周面34中的狭缝状开口35和挖掘机前端表面36的开口37,该开口35连续到开口35,与从内壁41 每个圆柱形部分38-40并且与狭缝形开口35分离成圆柱形部分中心43。
    • 5. 发明专利
    • Steel segment, and construction method for shield tunnel
    • 钢筋分段及施工方法
    • JP2010138677A
    • 2010-06-24
    • JP2008318744
    • 2008-12-15
    • Ohbayashi Corp株式会社大林組
    • KANAI MAKOTOUEDA JUNINA HIROSUKEMATSUOKA KAORUSHIMODA TOSHIO
    • E21D11/14E21D11/04
    • PROBLEM TO BE SOLVED: To restrain a reinforcement member from being bending-deformed when earth and water pressure acts thereon, in a steel segment.
      SOLUTION: This steel segment 100 includes a skin plate 10, a pair of main girders 11 erected toward the inside of a tunnel along longitudinal-directional along both side edge parts of the skin plate 10, and the detachably attachable reinforcing member 20 for connecting a space between the main girders 11. Both edge parts are separated from the skin plate 10, and the central part is formed into an arch shape to be adjacent to the skin plate 10, in the reinforcing member 20. The earth and water pressure acting on the skin plate 10 is transmitted, as a load toward the tunnel center, to the central part of the reinforcing member 20, but the reinforcing member 20 resists against the load by an axis-directional compression yield strength.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:在钢段中,当施加水压力时,限制加强构件的弯曲变形。 解决方案:该钢段100包括表皮板10,沿着纵向方向沿着皮肤板10的两个侧边缘部分竖立成隧道内侧的一对主梁11和可拆卸地附接的加强构件20 用于连接主梁11之间的空间。两个边缘部分与皮肤板10分离,并且中心部分在加强部件20中形成为与皮肤板10相邻的拱形。地球和水 作用在皮肤板10上的压力作为向隧道中心的载荷传递到加强构件20的中心部分,但是加强构件20通过轴向压缩屈服强度抵抗负载。 版权所有(C)2010,JPO&INPIT
    • 8. 发明专利
    • Installation method of precast member connecting hardware
    • 预制成员连接硬件的安装方法
    • JP2012097516A
    • 2012-05-24
    • JP2010247678
    • 2010-11-04
    • I L C:KkOhbayashi Corp株式会社アイ・エル・シー株式会社大林組
    • NAKAMURA TOSHIAKIMORIYA YOICHIYOSHIDA KIMIHIROKAGAWA ATSUSHIUEDA JUNNISHIMORI AKIHIROSHIMODA TOSHIO
    • E21D11/04E21D11/10
    • PROBLEM TO BE SOLVED: To provide an installation method of connecting hardware for realizing connection between precast members at a low cost.SOLUTION: The installation method includes: a step of arranging a first mold form 100 inside an outer mold form to be the almost same surface as an opening surface of the outer mold form 7; a step of integrating an interpolation body 200 and a second mold form 300 by temporarily fixing them; a step of inserting the interpolation body 200 to the inner space of cylindrical connecting hardware 20, integrating it and arranging it at the position of a prescribed depth inside the outer mold form; a step of placing concrete inside the outer mold form and curing it for a prescribed period; a step of pulling out and removing the first mold form 100 in the opening surface direction of the outer mold form 7; a step of releasing the temporary fixation of the integrated interpolation body 200 and second mold form 300 and pulling out and removing the second mold form 300 in the opening surface direction of the outer mold form 7; and a step of attaching a holding material 210 to the interpolation body 200 left in the inner space of the cylindrical connecting hardware 20, sliding the holding material 210 from a second space to a first space, thereby leading the interpolation body 200 together with the holding material from the inner space of the cylindrical connecting hardware to the first space and pulling it out in the opening surface direction of the outer mold form 7.
    • 要解决的问题:提供一种以低成本连接用于实现预制构件之间的连接的硬件的安装方法。 解决方案:安装方法包括:将第一模具模具100设置在外模具形式内以与外模具7的开口表面几乎相同的表面的步骤; 通过临时固定内插体200和第二模具300来整合插入体200的步骤; 将内插体200插入圆筒形连接硬件20的内部空间的步骤,将其整合并将其布置在外部模具形式内的规定深度的位置; 将混凝土置于外模中并固化一段规定时间的步骤; 在外模7的开口表面方向上拉出和移除第一模具100的步骤; 释放一体化内插体200和第二模具形式300的临时固定的步骤,并且在外模具7的开口表面方向上拉出和移除第二模具300; 以及将保持材料210附接到留在圆筒形连接硬件20的内部空间中的内插体200的步骤,将保持材料210从第二空间滑动到第一空间,从而使内插体200与保持 材料从圆筒形连接件的内部空间到第一个空间,并沿外模7的开口表面方向拉出。(C)2012年,JPO和INPIT
    • 9. 发明专利
    • Method for making tunnel boring machine arrive at arrival shaft
    • 制造隧道掘进机的方法
    • JP2010047920A
    • 2010-03-04
    • JP2008211114
    • 2008-08-19
    • Ohbayashi Corp株式会社大林組
    • MORIYA YOICHIUEDA JUNMORI MICHIHITO
    • E21D9/06
    • PROBLEM TO BE SOLVED: To provide a method for making a tunnel boring machine arrive at an arrival shaft, which facilitates the removal of a filler, and which enables the presence or absence of confined ground water and its confined condition to be detected before the removal of the filler.
      SOLUTION: A partition wall 7 is installed at a predetermined spacing inward from an inner peripheral surface 6 of an arrival pit mouth 5 in the arrival shaft 1. A steel frame 8 is installed in such a manner as to surround an outer periphery between the inner peripheral surface 6 and the partition wall 7. The filler 9, which is in a solid state at a normal temperature in the arrival shaft 1 and which is put into a fluid state when the temperature reaches a predetermined temperature higher than the normal one, is infilled into the steel frame 8 between the inner peripheral surface 6 and the partition wall 7.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种使隧道掘进机到达到达轴的方法,这有助于去除填料,并且能够检测是否存在密闭的地下水及其限制条件 在去除填料之前。 解决方案:分隔壁7以到达轴1中的到达凹坑5的内周面6向内的预定间隔安装。钢框架8以围绕外周的方式安装 在内周面6与分隔壁7之间。填料9,其在到达轴1的常温下处于固态,当温度达到比正常温度高的预定温度时处于流体状态 一个,填充到内周表面6和分隔壁7之间的钢框架8中。版权所有(C)2010,JPO&INPIT