会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Fatigue sensor
    • 疲劳传感器
    • JP2005180926A
    • 2005-07-07
    • JP2003417474
    • 2003-12-16
    • Kawasaki Heavy Ind Ltd川崎重工業株式会社
    • NIHEI KANTAMURAKISHI OSAMUKOBAYASHI TOMOHIRAKOGA SHINJIOKU YASUMASAOGAKI KAZUOUMEDA SATOSHIHORINO SATOSHI
    • G01M99/00G01N3/32G01M19/00
    • PROBLEM TO BE SOLVED: To provide a fatigue sensor capable of precisely measuring the degree of damage caused by the fatigue of a member to be detected in a low-temperature environment. SOLUTION: The fatigue sensor 1, adapted to the member 12 to be detected exposed to the low-temperature environment, is equipped with a foil-like substrate 2 and the foil-like fragment 10, wherein a slit 9, which extends from one side part 7 in the width direction, vertical to the longitudinal direction of the substrate to the other side part 8 in the width direction thereof, is provided at a central part 6 between both longitudinal end parts 4 and 5. The fragment 10 is formed of a material, of which the coefficient of linear expansion is larger than that of the member 12 to be detected, and both the longitudinal end parts 4 and 5 are fixed on one side 3 of the substrate 2. COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种能够精确地测量在低温环境下被检测部件的疲劳引起的损伤程度的疲劳传感器。 解决方案:适用于被暴露于低温环境的被检测部件12的疲劳传感器1配备有箔状基板2和箔状碎片10,其中延伸有狭缝9 在两个纵向端部4和5之间的中心部分6处设置有从宽度方向的一个侧部7的垂直于基板的纵向方向到宽度方向的另一侧部分8的部分。片段10是 由材料形成,其线膨胀系数大于被检测部件12的线膨胀系数,并且两个纵向端部4和5都固定在基板2的一侧3上。版权所有: C)2005,JPO&NCIPI
    • 4. 发明专利
    • Dome roof temporary fixation method and dome roof temporary fixation structure
    • 圆顶屋顶临时固定方法及圆顶屋顶临时固定结构
    • JP2013238039A
    • 2013-11-28
    • JP2012111548
    • 2012-05-15
    • Kawasaki Heavy Ind Ltd川崎重工業株式会社
    • MATSUURA TSUYOSHINAKAYAMA AKIRAHORINO SATOSHIOSHIBE SHINYA
    • E04H7/06
    • PROBLEM TO BE SOLVED: To provide a dome roof temporary fixation method capable of temporarily fixing a dome roof to an upper end of a dike without performing any welding after raising the dome roof by air raising, and its temporary fixation structure.SOLUTION: The work of fixing a roof bone upper fixture 23 beforehand to a roof bone 20 of a dome roof 5 before raising the dome roof 5 of a flat bottom cylindrical storage tank by air raising, fixing a portal fixture 24 corresponding to the roof bone upper fixture 23 and a stopper member 25 beforehand to a peak part of a dike 2, engaging one end of a roof fixing beam 28 inserted to the portal fixture 24 with the roof bone upper fixture 23, fitting a spacer member 30 between the other end of the roof fixing beam 28 and the stopper member 25, and respectively fitting wedge members 31 and 32 between the one end of the roof fixing beam 28 and the roof bone upper fixture 23 and between the roof fixing beam 28 and a horizontal beam part 27b of the portal fixture 24 is performed respectively to the plurality of roof bones 20 of the dome roof 5.
    • 要解决的问题:提供一种圆顶屋顶临时固定方法,其能够在通过升高提升圆顶屋顶之后不进行任何焊接而暂时将圆顶屋顶固定到堤防的上端,并且其临时固定结构。解决方案:工作 在通过升高升高平底圆柱形储罐的圆顶顶部5之前,将屋顶骨上固定件23预先固定到圆顶屋顶5的屋顶骨20,固定对应于屋顶骨上固定件23的入口固定件24和 止挡件25预先到达堤坝2的顶部,与屋顶骨上部固定件23接合插入入口固定件24的屋顶固定梁28的一端,将间隔件30安装在屋顶固定件的另一端之间 梁28和止动构件25,以及分别在顶部固定梁28的一端和屋顶骨上固定件23之间以及屋顶固定梁28和水平梁部分27b之间的楔形构件31和32 分别对门槛屋顶5的多个屋檐20执行门槛固定装置24。