会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Collar
    • JP2003284229A
    • 2003-10-03
    • JP2002084754
    • 2002-03-26
    • Furukawa Electric Co Ltd:The古河電気工業株式会社
    • OKAMURA MASATOSHINOGUCHI TAKAO
    • F16B2/08H02G1/04H02G7/02
    • PROBLEM TO BE SOLVED: To provide a collar for cable hold which stabilizes and enhances the power of holding a cable by clamp, in a collar for cable hold which is interposed between a cable fitted with a rib and the clamp for catching the cable fitted with a rib. SOLUTION: In the collar 2 for cable hold, which is in two-split form and is interposed between the cable 1 fitted with a rib and the clamp 3 for catching the cable 1, a holding power receiving part 2d for receiving the holding power of the above clamp 3 is provided at the periphery. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:为了提供用于电缆保持的套环,其通过夹紧来稳定并增强了将电缆夹持的电力,在用于电缆保持的套环中,该套环插入在装配有肋的电缆和用于捕获电缆的夹具之间 电缆配有肋条。 解决方案:在用于电缆保持的套环2中,其为双分离形式并且插入在装配有肋的电缆1和用于捕获电缆1的夹具3之间,用于接收电缆的保持电力接收部分2d 在周边设置上述夹具3的保持力。 版权所有(C)2004,JPO
    • 4. 发明专利
    • Overhead wire construction method for branch steel tower and temporary jumper device
    • 用于分支钢塔和临时跳闸装置的过电线结构方法
    • JP2014045597A
    • 2014-03-13
    • JP2012187131
    • 2012-08-28
    • Furukawa Electric Co Ltd:The古河電気工業株式会社
    • KAMIYAMA HIDEKIAKASAKA HIROJITAKEMURA SHINICHIOKAMURA MASATOSHINAKATSU YOSHINORI
    • H02G1/02H02G7/20
    • PROBLEM TO BE SOLVED: To reduce the workload and cost of an overhead wire construction.SOLUTION: An overhead wire construction method for a branch steel tower 100 that supports three-way overhead transmission wires 111a to 111c all of which are connected to an existing jumper wire 120 and has overhead earth wires 113a to 113c comprises a step of removing the existing jumper wire from each overhead transmission wire, a step of connecting at least any two overhead transmission lines 111a, 111c by a length-adjustable temporary jumper device 10 comprising plural jumper wires 11, 12 whose end portions are overlapped with each other and joined to each other, a step of removing the temporary jumper device after the overhead transmission wires or the overhead earth wires are exchanged, and a step of re-connecting the three-way overhead transmission wires by the existing jumper wire or a novel jumper wire.
    • 要解决的问题:降低架空线结构的工作量和成本。解决方案:一种用于支撑三通架空传输线111a至111c的分支钢塔架100的架空线施工方法,所有这些都连接到现有的跳线 电线120并具有顶置接地线113a至113c包括从每个架空传输线去除现有的跨接线的步骤,将至少任何两个架空传输线111a,111c连接到包括多个长度可调节的临时跳线装置10的步骤 跨接线彼此重叠并相互连接的跨接线11,12;在更换塔顶传输线或架空接地线之后移除临时跨接装置的步骤, 通过现有的跳线或新颖的跳线进行双向架空传输线。