会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • UNDERGROUND TRENCHER
    • JPS6245831A
    • 1987-02-27
    • JP18476785
    • 1985-08-22
    • NIPPON IKOSU KK
    • MOROOKA TATSUO
    • E02D17/13E02F5/02
    • PURPOSE:To permit the excavation of a trench of a length more than the total diameter of a trencher by a method in which plural frames incorporated with a driver and tipped with a horizontal rotary cutter are pivotally attached to the trencher and a forced-rocking mechanism is additionally provided for each frame. CONSTITUTION:A pair of frames 2 are sideways arranged and attached to the framed machine body 1 through shafts 3 in such a way as to enable the frames 2 to be forcibly moved in a rocking manner by operation of liquid- pressure devices 4 having a reaction support point on the machine body 1. The rotary shaft 6 of a horizontal rotary cutter 5 provided on the tip of the frame 2 is driven by a driver 7 built in the frame 2. The distance between the shafts 3 is made greater than the diameter of the butter 5 and the width of the cutter 5 is set to the size of a trench to be excavated. The left- and right-hand cutters 5 are separated from each other by a distance corresponding to the difference between the distance of the shafts 3 and the diameter. The trench can thus be finished with a constant width (or thickness).
    • 10. 发明专利
    • Ground excavation work
    • 地面挖掘工作
    • JPS6178920A
    • 1986-04-22
    • JP20094184
    • 1984-09-25
    • Nippon Ikosu Kk
    • MOROOKA TATSUO
    • E02D17/04
    • E02D17/04
    • PURPOSE:To perform sheathing work reasonably and economically by a method in which plural pipes are driven into the ground to form a pipe line, the ground on one side of the pipe line is excavated, and a shelf plate is horizontally inserted into the aperture between the pipes and connected to the pipes. CONSTITUTION:Plural pipes 1 are driven to a given depth almost vertically into the ground in the boundary of an excavation area to form a pipe line. A shelf plate 6 is almost horizontally inserted into the aperture between the adjacent pipes 1 for an adequate distance and connected with bolts 7 to support the upside of the ground. The excavation of the ground is continued while keeping the stable condition of the plate 6. when the excavation reaches an adequate depth, a shelf plate 6 is again inserted. The same operations are repeated in succession. The ground can thus be excavated reasonably and economically in conformity with the properties of wide ranges of ground.
    • 目的:通过将多个管道驱动到地面中以形成管道的方法合理经济地进行护套工作,挖出管线一侧的地面,并将搁板水平地插入孔之间, 管道和管道连接。 构成:将多个管道1几乎垂直地推入到挖掘区域的边界内的地面中以形成管线。 搁板6几乎水平地插入相邻管1之间的孔中足够的距离,并与螺栓7连接以支撑地面的上侧。 在保持板6的稳定状态的同时继续挖掘地面。当挖掘深度达到足够的深度时,再次插入搁板6。 相继的操作重复重复。 因此,可以根据广泛的地面属性合理,经济地开挖地面。