    • Method of constructing cast-in-place concrete pile
    • 建筑混凝土桩的方法
    • JPS6110622A
    • 1986-01-18
    • JP13168084
    • 1984-06-26
    • Hasegawa Komuten Co LtdHokushin Ind Inc
    • FUKUSHIMA TAKAYUKITSUNEMATSU TAKESHIKITANAKA KATSUMI
    • E02D5/44E02D5/58
    • E02D5/44
    • PURPOSE:To decrease a construction cost, by a method wherein arrangement of bar, in which the upper part of a pile main arrangement of bar forms a PC steel bar constituted in an unbond and the lower part forms a steel bar for reinforced concrete, is installed in an excavated hole, and after concrete is placed therein, the PC steel bar is stretched. CONSTITUTION:The whole of pile arrangement of bar forms a connection main arrangement of bar 4 in which a given upper section L, on which high bending moment is exerted, forms a PC steel bar 1, and a lower section l forms a steel bar 3 for reinforced concrete connected to the PC steel bar 1 by means of a coupler 2. An anchoring metal 5 is attached to the lower end or the connection of the connection main arrangement of bar 4, and arrangement of bar in which the whole surface of the PC steel bar 1 is formed in an unbond 6, is installed in an excavated hole 7. Thereafter, after concrete 14 is placed and cured, given tension is exerted on the PC steel bar 1 from the top of a pile, and the PC steel bar 1 is anchored at 8 to the top part of the pile to exert prestress on concrete 14 at the upper section L.
    • 目的:为了降低施工成本,通过如下方式,其中,在主组装杆的上部部分形成未粘结的PC钢筋的下部部分形成钢筋混凝土的钢筋的方式, 安装在挖掘的孔中,并且在混凝土放置在其中之后,PC钢筋被拉伸。 构成:杆的整体排列形成了杆4的连接主体布置,其中施加高弯矩的给定上部L形成PC钢筋1,下部分1形成钢棒3 用于通过联接器2连接到PC钢筋1的钢筋混凝土。锚固金属5连接到杆4的连接主体装置的下端或连接处,并且杆的整个表面 PC钢筋1形成为未粘接6,安装在挖掘孔7中。此后,在混凝土14被放置和固化后,从PC顶部施加张力作用在PC钢筋1上,并且PC钢 钢筋1固定在桩的顶部8处,以在上部L对混凝土14施加预应力。