会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 71. 发明专利
    • PILE FOUNDATION AND ITS CONSTRUCTION METHOD
    • JPH08151652A
    • 1996-06-11
    • JP31906194
    • 1994-11-29
    • KUMAGAI GUMI CO LTD
    • WATANABE NORIO
    • E02D31/00
    • PURPOSE: To provide a construction method for pile foundation for which secure water leakage prevention measure is taken and for pile foundation excellent in work efficiency and economical efficiency. CONSTITUTION: An auger 20 rod is lowered, and a coal ash layer 8, a cohesive soil layer 6, a sand layer 4, and a support layer 2 are dug sequentially by an agitating blade 24. Also cement milk is fed from the lower end of the rod 22 to a digging hole, and the digging soil and cement milk are agitated by the agitating blade 24 so as to build a soil cement column 30. Then the agitating fan of a auger 20 is pulled down to the position of the viscous soil layer 6, and the rod and agitating blade are rotated while cement milk is sprayed from a nozzle into the cohesive soil layer 6 approximately in horizontal direction. The cement milk sprayed at high pressure forms a cement type or soil cement type water sealing film 32 in the cohesive soil layer 6 in approximately horizontal direction. Finally, the rod of the auger 20 is pulled up from the digging hole, and a steel pipe pile 10 is erected into a soil cement column not solidified 30.