会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 71. 发明专利
    • Structure for mounting air-conditioning ventilation duct
    • 安装通风通风管道的结构
    • JP2014040701A
    • 2014-03-06
    • JP2012181996
    • 2012-08-21
    • Taisei Corp大成建設株式会社
    • NAMATAME YASUSHI
    • E04B9/18E04B5/48
    • PROBLEM TO BE SOLVED: To provide a structure for mounting an air-conditioning ventilation duct 6 which can conduct works about a ceiling finish material 1 and the air-conditioning ventilation duct 6 in a same process in order to solve the problem that conventionally the works of suspending from a ceiling slab 1 and supporting the ceiling finish material 1 and the air-conditioning ventilation duct 6 are conducted separately, resulting in a complicated process control and to eliminate the complicatedness of the process control.SOLUTION: In a structure for mounting an air-conditioning ventilation duct, the side face of the air-conditioning ventilation duct 6 is stuck to the side face of an earthquake strengthening member 8 of which one end is fixed to a ceiling joist support 3 and of which the other end is fixed to a ceiling slab 1 so as to prevent a ceiling finish material 1 from vibrating or dropping due to an earthquake or the like.
    • 要解决的问题:为了提供一种用于安装空调通风管道6的结构,其可以在相同的过程中对天花板材料1和空调通风管道6进行工作,以解决传统工作中的问题 从天花板1悬吊并支撑天花板整理材料1和空调通风管6分开进行,导致复杂的过程控制并消除过程控制的复杂性。解决方案:在用于安装 空调通风管道,空调通风管道6的侧面粘附在其一端固定在天花板托梁支架3上的抗震构件8的侧面,另一端固定在 天花板1,以防止天花板材料1由于地震等而振动或落下。
    • 72. 发明专利
    • Electric apparatus standby power minimization control unit, and control system
    • 电气设备电源最小化控制单元和控制系统
    • JP2014039387A
    • 2014-02-27
    • JP2012179964
    • 2012-08-14
    • Taisei Corp大成建設株式会社Toko Electric Corp東光電気株式会社
    • KOBAYASHI SHINGOMITANI MASASHITAKENOBU HIROAKISEKI SATOYUKISHIBUSAWA MASAHIROKOJIMA TAKAO
    • H02J13/00F24F11/02
    • Y02B70/3216Y02B70/3275Y02B90/2653Y04S20/221Y04S20/244Y04S40/126
    • PROBLEM TO BE SOLVED: To provide a control unit capable of performing ON/OFF control of a main power source for each electric apparatus, and implementing ultimate energy saving by minimizing standby power during an unused period; and provide a simple system by using a common universal generic electric apparatus.SOLUTION: An electric apparatus standby power minimization control unit comprises: a main power source control switch for controlling a main power source for each electric apparatus; a CPU for storing an address of the control unit; communication means connected to a controller by wire or wireless; and a power source supply circuit for supplying power source to the CPU, communication means, and the main power source control switch, where the main power source control switch is arranged on the secondary side of the power source supply circuit so that the CPU and communication means are constantly driven even when the main power source control switch performs OFF control of the main power source for each power apparatus.
    • 要解决的问题:提供一种能够对每个电气设备执行主电源的ON / OFF控制的控制单元,并且在未使用期间通过最小化待机功率来实现最终的节能; 并且通过使用普通通用通用电气设备提供简单的系统。解决方案:一种电气设备待机功率最小化控制单元,包括:主电源控制开关,用于控制每个电气设备的主电源; 用于存储控制单元的地址的CPU; 通过有线或无线连接到控制器的通信装置; 以及用于向CPU,通信装置和主电源控制开关提供电源的电源供应电路,其中主电源控制开关布置在电源供应电路的次级侧,使得CPU和通信 即使主电源控制开关对每个电力设备执行主电源的OFF控制,装置也被持续驱动。
    • 74. 发明专利
    • Fall prevention structure
    • 防止结构
    • JP2014025242A
    • 2014-02-06
    • JP2012165464
    • 2012-07-26
    • Taisei Corp大成建設株式会社
    • ISHIZAWA MASASHIKOBAYASHI SHOICHINISHIYAMA SHOZOKANEDA KAZUHIRO
    • E04H6/10E04H6/42
    • PROBLEM TO BE SOLVED: To provide a fall prevention structure capable of inexpensively preventing a fall of a vehicle in an existing parking lot.SOLUTION: A fall prevention structure 10 is provided in an existing parking lot 1. The existing parking lot 1 has an existing parapet 2 elongated along an outer periphery. The fall prevention structure 10 includes: an earth retaining material that is placed on the floor surface 3 of the existing parking lot 1; a support 12 that is elongated upward from the earth retaining material; and a protective board 13 that is supported by the support 12 and almost horizontally elongated in a predetermined height position from the floor surface 3. The earth retaining material comprises an inward extended part 24 that is planarly extended toward a parking space side on the floor surface 3 of the existing parking lot 1.
    • 要解决的问题:提供能够廉价地防止现有停车场中的车辆坠落的防坠落结构。解决方案:在现有的停车场1中设置防坠落结构10.现有的停车场1具有现有的 护栏2沿着外周伸长。 防坠落结构10包括:放置在现有停车场1的地板表面3上的接地保持材料; 从地球保持材料向上延伸的支撑件12; 以及保护板13,其由支撑件12支撑并且在距地面3的预定高度位置几乎水平地延伸。接地保持材料包括向内延伸的部分24,其向地板表面上的停车位侧平面地延伸 3现有停车场1。
    • 76. 发明专利
    • Outer-equipped reinforcement structure of existing building, and method for reinforcing existing building
    • 现有建筑的外部加固结构以及加固现有建筑的方法
    • JP2014020118A
    • 2014-02-03
    • JP2012160116
    • 2012-07-19
    • Taisei Corp大成建設株式会社
    • FUJIMURA TASHIROTOYODA SACHIYUKIINOUE FUTOSHI
    • E04G23/02
    • PROBLEM TO BE SOLVED: To provide an outer-equipped reinforcement structure of an existing building, capable of aseismatically reinforcing an existing in-service building from the outside and capable of being constructed at low cost without being restricted by the position of a column-beam frame of the existing building, and a method for reinforcing the existing building.SOLUTION: An outer-equipped reinforcement structure 1 of an existing building 30 comprises: horizontal members 31 attached to a periphery of the existing building 30; and a reinforcement frame 10 installed on the outside the periphery of the existing building 30. The reinforcement frame 10 is constituted of: reinforcement columns 11 penetrating through the horizontal members 31 and arranged; and two stages of reinforcement beams 12 vertically disposed and extended from side faces of the reinforcement columns 11 in the direction orthogonal to the reinforcement columns 11.
    • 要解决的问题:提供现有建筑物的外部加固结构,能够从外部积极地加强现有的在役建筑物并且能够以低成本构造而不受柱梁的位置的限制 现有建筑物的框架和加强现有建筑物的方法。解决方案:现有建筑物30的外部装备的加固结构1包括:附接到现有建筑物30的周边的水平构件31; 以及安装在现有建筑物30的周边的外侧的加强框架10.加强框架10由穿过水平构件31并被布置的加强柱11构成; 以及沿与加强柱11正交的方向垂直设置并从加强柱11的侧面延伸的两段加强梁12。
    • 78. 发明专利
    • Curing sheet, concrete form structural member, and concrete structure manufacturing method
    • 固结板,混凝土结构构件和混凝土结构制造方法
    • JP2014009481A
    • 2014-01-20
    • JP2012145967
    • 2012-06-28
    • Taisei Corp大成建設株式会社
    • TAKAKURA KATSUHIKOKUROIWA SHUSUKEJINNAI HIROSHI
    • E04G9/10E04G21/02
    • PROBLEM TO BE SOLVED: To provide a curing sheet for enabling a solid and smooth finished surface to be easily formed when manufacturing a concrete structure, and to provide a concrete form structural member and a concrete structure manufacturing method.SOLUTION: The concrete structure manufacturing method includes a step of forming a concrete form 2 having an opening, a step of pouring cement based mixed material C from the opening so as to be filled into the concrete form 2, and a step of installing a concrete form structural member 1 as a cover for the opening and putting a curing sheet 10 in contact with the concrete surface. The concrete form structural member 1 includes a plate 11, and a deairing part 12 for covering the inside face of the plate 11. The deairing part 12 has a three-layered structure consisting of a film layer 13, a suction sheet 14 and the curing sheet 10, and the curing sheet 10 is formed of a woven cloth to which paste is applied.
    • 要解决的问题:提供一种固化片,用于在制造混凝土结构时能够容易地形成固体和光滑的成品表面,并提供混凝土结构构件和混凝土结构制造方法。解决方案:具体结构制造方法 包括形成具有开口的混凝土模板2的步骤,从开口浇注水泥基混合材料C以填充到混凝土模板2中的步骤,以及将混凝土模板结构构件1作为盖子安装的步骤 用于打开并将固化片10与混凝土表面接触。 混凝土结构构件1包括板11和用于覆盖板11的内表面的脱气部分12.脱气部分12具有由膜层13,吸力片14和固化物构成的三层结构 片材10,固化片材10由施加糊剂的织布形成。
    • 80. 发明专利
    • Construction method
    • 施工方法
    • JP2013245458A
    • 2013-12-09
    • JP2012119053
    • 2012-05-24
    • Taisei Corp大成建設株式会社
    • YAJIMA KIYOSHIKUBOKI KUNIHIKOWATANABE MASARUHAYABE YASUHIRO
    • E04H12/34
    • PROBLEM TO BE SOLVED: To construct a tower-like structure more easily while securing safety in a narrow land in a mountainous region, especially, nearby a mountaintop.SOLUTION: There is provided a construction method which permanently constructs a tower-like structure by vertically connecting a plurality of column units, and includes a connection process of successively connecting the column units on an existing column unit using a climbing device and a lifting machine. The column unit is a frame body which includes a plurality of column main materials and a connection member connecting the plurality of column main materials. The climbing device has an engagement part which constitutes a work stage and engages the column main materials, and can be lifted while guided by the column main materials. The connection process repeats a process of mounting the lifting machine on the climbing device and moving up the climbing device to the existing column unit, a process of suspending a new column unit by the lifting machine, and a process of connecting the suspended column unit and existing column unit.
    • 要解决的问题:在山区狭窄的土地上,特别是山顶附近,确保安全,更容易地构筑塔式结构。解决方案:提供一种垂直构造塔状结构的施工方法 连接多个列单元,并且包括使用攀登装置和提升机器在现有列单元上连续地连接列单元的连接处理。 柱单元是包括多个柱主材料的框体和连接多个柱主材料的连接构件。 攀爬装置具有构成工作台并与柱主材料接合的接合部,并且可以在由柱主材料引导的同时被提升。 连接过程重复将升降机安装在攀爬装置上并将攀爬装置向上移动到现有的塔单元的过程,由提升机悬挂新的塔单元的过程,以及将悬挂柱单元和 现有列单位。