热词
    • 69. 发明专利
    • Coal-fired power generation plant
    • 燃煤发电厂
    • JP2013185524A
    • 2013-09-19
    • JP2012052472
    • 2012-03-09
    • Hitachi Ltd株式会社日立製作所
    • HAYASHI YOSHIHARUSHIBATA TSUTOMUHANDA MASAHITO
    • F01K7/22B01D53/14B01D53/62F01K7/24F01K7/44F01K17/02
    • F22B21/343B01D53/1425B01D53/1475B01D2252/204B01D2258/0283F01K7/22Y02E20/326
    • PROBLEM TO BE SOLVED: To achieve cost reduction by limiting the range of a heat transfer pipe which uses a high-quality material having high heat resistance in a boiler which is increased in efficiency by increasing the temperature of steam.SOLUTION: In a conventional boiler, an economizer that is set in a front stage of a boiler outlet is removed, and a low pressure reheater 20 is installed instead. Water supply to a boiler 1 is sent first to a water wall 11 on a furnace side. Then, steam that is overheated by first to fourth superheaters 12 to 15 that are high pressure main steam systems is sent to an ultra high pressure turbine 2, and the exhaust air thereof is sent to a high pressure turbine 3. The exhaust air of the high pressure turbine 3 is returned to the boiler 1, and the steam overheated by a primary high pressure reheater 18 and a secondary high pressure reheater 19 that are high pressure reheating steam systems is sent to an intermediate pressure turbine 4. The exhaust air of the intermediate pressure turbine 4 is returned to the boiler 1, overheated by the low pressure reheater 20 that is a low pressure reheating steam system, and is sent to a low pressure turbine 5.
    • 要解决的问题:通过限制在锅炉中使用具有高耐热性的优质材料的传热管的范围来实现成本降低,其通过增加蒸汽的温度而提高效率。解决方案:在常规锅炉 设置在锅炉出口的前段的节能器被去除,并且代替安装低压再热器20。 向锅炉1的供水首先发送到炉侧的水壁11。 然后,由作为高压主蒸汽系统的第一至第四过热器12至15过热的蒸汽被送到超高压涡轮机2,其排气被送到高压汽轮机3。 将高压汽轮机3返回到锅炉1,将由高压再加热蒸汽系统构成的初级高压再热器18和二级高压再热器19过热的蒸汽送入中压汽轮机4。 中压涡轮4返回到锅炉1,由作为低压再热蒸汽系统的低压再热器20过热,并被送到低压涡轮机5。