会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 61. 发明专利
    • BURNER FOR GAS COOKING STOVE
    • JP2002267112A
    • 2002-09-18
    • JP2001061740
    • 2001-03-06
    • RINNAI KK
    • INOMATA MASANOBU
    • F23D14/06
    • PROBLEM TO BE SOLVED: To provide a burner for a gas cooking stove which prevents not only occurrence of a flame failure when a gas amount is throttled but also can prevent the occurrence of a red flame and lifting. SOLUTION: A plurality of gas passes 6 having various sectional areas extending radially in the direction of an outer periphery from an annular distribution chamber 4 connected to a gas mixing pipe 2 are formed, and the outer end of the gas passage forms a burner port. In the so formed burner for the gas cooking stove, the outer end of a gas passage 6a having a wide sectional area is expanded in the direction of width so that the outer end is joined with the outer end of a gas passage 6b adjoining the gas passage 6a and having a narrow section area. A partition wall 9 is situated between gas passages 8 adjoining each other and being expanded.
    • 62. 发明专利
    • REMOTE CONTROL SYSTEM
    • JP2002250559A
    • 2002-09-06
    • JP2001049101
    • 2001-02-23
    • RINNAI KK
    • TOUYA KENJIFUJIGAKI YOSHIAKIHIGUCHI TETSUYA
    • F24H1/00H04Q9/00
    • PROBLEM TO BE SOLVED: To provide a remote control system capable of locking various functions of a bath room system according to a demand. SOLUTION: A first lock means is provided to lock at least a function to vary the temperature of hot water fed to a bath room, a function to vary a hot water temperature in the temperature of hot water in a bathtub, and a function to perform operation to reheat hot water in a bathtub. A first lock releasing means to release lock of a function locked by the first lock means is provided in a bath room. A second lock means is provided to lock at least one of a function to perform operation to add hot water, lukewarm water operation, and fluctuation shower operation, a function to vary a time for keeping warm operation, a function to vary a water level of hot water in the bathtub, and a function to vary a sound volume of a voice-announcing function and a call function. A second lock releasing means is provided to release locking of a function locked by the second lock means except a function locked by the first lock means.
    • 64. 发明专利
    • BATHROOM AIR-CONDITIONING DEVICE
    • JP2002221335A
    • 2002-08-09
    • JP2001016161
    • 2001-01-24
    • RINNAI KK
    • ITO JIRO
    • F24D19/02F24F13/20F24F1/00
    • PROBLEM TO BE SOLVED: To provide a bathroom air-conditioning device capable of simplifying the execution of a work where one end of piping is connected to a piping connection part and the other end of the piping is inserted through a piping pass- through hole. SOLUTION: The bath room air-conditioning device is provided with a casing 22, a heat exchanger, and piping connection parts 2a and 2b. The casing 22 surrounds the face periphery of a back 23a and has a peripheral surface 23b extending from its back 23a to the rear, and piping pass-through holes 23c and 23d are formed in two spots in a lateral direction in the peripheral surface 23b. A heat exchanger is contained in the easing 22. Two of the piping connection parts 2a and 2b are situated at each of a supply pipe and a return pipe and communicated with the heat exchanger and protruded rearward from an opening 37 of the back 23a surrounded by the peripheral surface 23b. In which case, the piping pass-through holes 23c and 23d and the piping connection parts 2a and 2b are situated in a position relation that a space extending in the vertical direction to the hole faces thereof and a space that the piping connection parts 2a and 2b are extended in the vertical direction to a connection surface therebetween cross each other.
    • 66. 发明专利
    • ABSORPTION FREEZER
    • JP2002195690A
    • 2002-07-10
    • JP2000388029
    • 2000-12-21
    • RINNAI KKOSAKA GAS CO LTD
    • HAYASHI YASUHEIFURUHASHI TOSHIHIRONAKAYAMA RIEFUKUCHI TORU
    • F25B33/00
    • PROBLEM TO BE SOLVED: To increase freezing capability, without making an apparatus large- sized by depositing an intermediate concentration absorption solution over the entire surface of a solvent vaporization tank like a uniform thin film, without fail. SOLUTION: In an absorption freezer, which includes a high-temperature regenerator 1, a separation cylinder 2, a solvent vapor tank 4, a low-temperature regenerator 3 including a separator 5 for an intermediate concentration absorption solution, the low-temperature regenerator 3 serving to produce a high concentration absorption solution and solvent vapor by heating the intermediate concentration absorption solution, by making use of condensation heat of solvent vapor, a condenser 8, an absorber 83, and a vaporizer 86, the low-temperature regenerator 3 includes the solvent vapor tank 4, an annular liquid receptor 6 installed at an upper end of the solvent vapor tank 4, and a dam 7 for laterally dispersing into a thin film the intermediate concentration absorption solution flowing down to the surface of the upper end of the solvent vapor tank 4 from the annular liquid receptor 6.
    • 67. 发明专利
    • ABSORPTION REFRIGERATOR
    • JP2002195680A
    • 2002-07-10
    • JP2000388132
    • 2000-12-21
    • RINNAI KKOSAKA GAS CO LTD
    • HAYASHI YASUHEIOSHIMA KATSUYAKAWAMOTO KAORUFUKUCHI TORU
    • F25B15/00F25B49/04
    • PROBLEM TO BE SOLVED: To provide an absorption refrigerator, in which the infiltration of intermediate-concentration absorbent into the flow path of solvent vapor ca be detected early, a detection means such as a sensor can be easily installed in the refrigerator, and efficiency decrease of the cooling cycle can be recovered at a low cost. SOLUTION: The absorption refrigerator comprises a high-temperature regenerator 1, a low-temperature regenerator 3, a condenser 8, an evaporator 9, an absorber 7, and an absorption pump P. The high-temperature regenerator 1 heats and boils the low-concentration absorbent, and separates it by a separating tube 2 into solvent vapor and the intermediate-concentration absorbent. In the low-temperature regenerator 3, the intermediate-concentration absorbent is heated by condensation heat of the generated absorbent vapor, and separated into solvent vapor and a high-concentration absorbent. The condensed solvent is passed through a solvent flow-path 60 to the condenser 8. The pump P circulates the low concentration absorbent to the high- temperature regenerator 1. The refrigerator is provided with a temperature sensor 62 for detecting the infiltration of the intermediate-concentration absorbent into the solvent flow-path 60 and reduces the circulation amount of the low-concentration absorbent by an output of the pump P.
    • 69. 发明专利
    • ANNULAR BURNER
    • JP2002174409A
    • 2002-06-21
    • JP2000374043
    • 2000-12-08
    • RINNAI KK
    • INOMATA MASANOBUAKAGI KAZUYUKI
    • F23D14/06
    • PROBLEM TO BE SOLVED: To inexpensively manufacture an annular burner that can obtain a large dynamic input ratio by eliminating the occurrence of such a trouble as the accidental fire, backfire, etc., caused when a thermal power adjusting lever is operated for abruptly reducing the quantity of a fuel gas. SOLUTION: This annular burner is manufactured in such a way that gas passages 7 extended outward in the radial directions from an annular distribution chamber 6 communicating with a gas mixing pipe 1 are formed in the chamber 6 and, at the same time, the upper surfaces 7a of the passages 7 are formed in slopes which are gradually inclined upward toward the outside and the external ends of the passages 7 are constituted in the burner port 9 of the burner. In the burner, a recessed unburnt gas reservoir 11 the lower part of which is expanded more than its upper part is formed closely to the outside of the port 9. The reservoir 11 is constituted by moving the upper edges of the partition walls of the gas passages in the port 9 inward than the lower edges of the walls and formed by cutting off the upper edges of the partition walls of the gas passages in the port 9.
    • 70. 发明专利
    • HOT WATER OUTFLOW DEVICE
    • JP2002162119A
    • 2002-06-07
    • JP2000359790
    • 2000-11-27
    • RINNAI KK
    • MARUHASHI TSUTOMU
    • F24H9/00
    • PROBLEM TO BE SOLVED: To solve the problem that cold water flows for a while after the water is turned on when there is a faucet away from a water heater, a large amount of cold water is allowed to flow uselessly until change is made to the hot water, and the change from cold water to hot water cannot be detected visually or the like and hence it is troublesome to confirm it with hands and one becomes irritated or the like. SOLUTION: A hot water outflow device 1 is mounted near the faucet 3. In the hot water outflow device 1, cold water being present at a hot water passage 4 between the water heater 2 and the hot water outflow device 1 is accumulated in a water storage tank 6 after the faucet 3 is opened. When the hot water reaches the hot water outflow device 1, the hot water is guided to the faucet 3. As a result, cold water until hot water reaches the hot water outflow device 1 from the water heater 2 cannot become useless, thus saving water. Also, the need for confirming the change from the cold water to hot water is eliminated for preventing troubles.