会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 54. 发明专利
    • CLEANING DEVICE COMMONLY USED FOR SCAFFOLD PLATE AND ERECTING FRAME
    • JPH09206703A
    • 1997-08-12
    • JP1780996
    • 1996-02-02
    • DAIYU TEKKO KK
    • NOMURA YUKO
    • B08B1/02E04G19/00
    • PROBLEM TO BE SOLVED: To improve the efficiency of a cleaning treatment by providing a cleaning device for executing the removal of deposits of the scaffold plate and erecting frames to be used with dressers arranged above and below so as to execute the cleaning treatment with swiveling blow wheels. SOLUTION: The dresser 17 is kept rotated at a normal speed and the dresser 16 is kept stopped or rotated at a low speed in the case the scaffold plate 1 is subjected to the cleaning treatment. Next, the scaffold plate 1 is advanced while the plate is kept pressed and held by pinch rollers 19a to 19d when the scaffold plate 1 is supplied in the state of rotating feed rollers 18 of a feed mechanism 15. At the time the scaffold plate passes under the dresser 17, the blow is given thereto by the blow wheels 48 and the deposits on the surface are peeled and removed. Next, the dresser 16 is rotated at a normal speed in the case the erecting frame is subjected to the cleaning treatment. As a result, the outer peripheral surface of the lower half part of the erecting frame is first subjected to the cleaning treatment by the dresser 16 and, thereafter, the outer peripheral surface of the upper half part is subjected to the cleaning treatment by the dresser 17.
    • 59. 发明专利
    • DECORATION PIECE FOR SEPARATOR BOLT HOLE IN CONCRETE SURFACE
    • JPH0972091A
    • 1997-03-18
    • JP24860395
    • 1995-09-01
    • MARUMATSU SEITO KK
    • MIZUNO MASAKI
    • E04G19/00E04G17/06
    • PROBLEM TO BE SOLVED: To block a separator bolt hole certainly by inserting a mounting part in the separator bolt hole provided in a concrete surface, and fitting its internal threads on a separator bolt which protrudes from the hole. SOLUTION: The body 12 of a mounting part has an outside diameter some smaller than a separator bolt hole 31 in a part on the concrete surface 30 which is to be inserted into the separator bolt hole 31 and is shaped approx. cylindrically as thinning toward the bottom surface of the hole. An air bleeding groove is provided in the cylindrical direction at the outside circumferential surface of the mounting part 11, and the air in the hole 31 is released to the outside to ensure eventual operation that the gap between the hole 31 and mounting part 11 is filled with a sealant, etc. This decoration piece 10 is certainly attached only by fitting the internal threads of a threaded member on the separator bolt 32 which is protruding to the hole 31 so that the separator bolt can be blocked, and the bolt hole and its peripheral edge are hidden with fine workmanship.
    • 60. 发明专利
    • GRINDING/POLISHING/CLEANING DEVICE FOR BUILDING FRAME FOR TEMPORARY SCAFFOLD
    • JPH0967931A
    • 1997-03-11
    • JP22531495
    • 1995-09-01
    • NIKKO KK
    • IKEI HIROAKI
    • E04G19/00B08B1/02
    • PROBLEM TO BE SOLVED: To automatically execute respective works while checking and correcting the frame width of a building frame, or combining a punching work of connecting pin locking holes with a grinding/polishing/cleaning work. SOLUTION: A frame width deviation detecting device 30 detecting deviation of a building frame by a photoelectric sensor, and a frame width correcting device 31 pressing and pulling leg parts by a correcting tool so as to correct the frame width, are arranged in a building frame transfer device 3 carrying a building frame in or out of a grinding/polishing/cleaning machine main body 1. Further, a punching device 32 punching connecting pin locking holes by a core metal and a punch is arranged in the building frame transfer device 3. This device is constituted so that together with a grinding/polishing/cleaning work removing extraneous matter, a correcting work detecting deviation of the frame width of the building frame and correcting the frame width if the deviation is large, and a punching work of the pin locking holes for a connecting pipe on the leg part of the building frame, can be simultaneously executed.