    • 51. 发明专利
    • CONTINUOUS UNDERGROUND WALL
    • JPS61282517A
    • 1986-12-12
    • JP12148385
    • 1985-06-06
    • OHBAYASHI CORP
    • TAKEDA JUICHIOBATA KATSUROIRISAWA KENICHI
    • E02D5/18E02D5/20
    • PURPOSE:To increase the shear strength of the joint portion by a method in which the horizontal cross section of the partition plate of a joint box position at the joint of underground walls is shaped into a wave form by setting the length/height ratio of the wave form to a specific range. CONSTITUTION:A preceding pit 14 is formed in the preceding construction section I, and a reinforcing bar cage 10 is inserted into the pit 14. Concrete is then driven into the pit 14 excluding the portion of a joint box 12 with partition plates 121 of a waveform horizontal cross section having a wave length/ height ratio 3-5. A following pit 18 is excavated in the follow construction section II, a drawing plate 124 is pulled out, and the reinforcing bar cage 10 is inserted into the pit 18 by overlapping an auxiliary reinforcing bar cage 110 with the horizontal main reinforcing bars 101 in the box 12. Concrete is driven into the pin 18 to form a following wall 20, and the same processes are repeated to form an underground wall.
    • 57. 发明专利
    • CONSTRUCTION OF UNDERGROUND STRUCTURE
    • JPH08177068A
    • 1996-07-09
    • JP32439294
    • 1994-12-27
    • OHBAYASHI CORP
    • OBATA KATSUROTSUDA KAZUAKIKURISU KOICHIRO
    • E02D27/12E02D29/045E21D13/00
    • PURPOSE: To improve the efficiency and shorten the term of works on constructing frames on the subterranean part of a structure by a method wherein horizontal force is borne with beams constructing the floor on the first story and continuous underground walls, and permanent beams are made to double as struts. CONSTITUTION: Steel beams 20 for the first story are connected to the upper ends of structural studs 12 (first floor beam constructing process). An excavator is brought in through an opening between the steel beams 20 on the first floor and excavation is made on a part for the first basement Bl (excavation process). Permanent beams 24 for constructing the floor 22 for the first basement B1 are arranged in grating (beam arrangement process) on the bottom of the excavated part, and the arranged permanent beams 24 are hung down (beam hanging process) from the first story steel beams 20 with hanging materials 26. End of each of the beams 24 is made to double as a strut for continuous underground wall 14. The excavation process, the beam arrangement process and the beam hanging process are repeated for constructing basements in the lower stories, and an underground structure is constructed with the stories constructed up to the projected stage.