    • 51. 发明专利
    • Method for creating pile body
    • 创建块体的方法
    • JP2014088687A
    • 2014-05-15
    • JP2012238426
    • 2012-10-29
    • Yokoyama Kiso Koji:Kk株式会社横山基礎工事
    • YOKOYAMA HIROSUKE
    • E02D5/34
    • PROBLEM TO BE SOLVED: To provide a method capable of surely preventing a hole from becoming thin in a construction in which concrete is placed into a hole drilled by a casing excavation to create a pile body and capable of surely securing a design pile diameter.SOLUTION: An inventive method for creating pile body includes steps of:putting slurry pressing concrete into a drilled hole inside a casing; and placing the concrete in the drilled hole so as to push up the slurry. In this method, the concrete is placed so that an upper surface of the placed concrete pushes up the slurry during the period from a start up to completion of the concrete placing. Meanwhile, the slurry is filled up to the vicinity of a hole mouth and is recovered/controlled so as to keep its water head level substantially contant during the period up to the completion of placing. Thereby, the inner pressure (lateral pressure) of unconsolidated concrete in a pull-out range is not overcome by an external pressure such as earth pressure of a hole wall and placement pressure even if the casing is pulled out about a concrete-placed part, the hole is surely prevented from becoming thin, and a design pile diameter can be secured.
    • 要解决的问题:提供一种能够可靠地防止在将混凝土置于通过套管挖掘钻出的孔中以形成桩体并能够确保设计桩直径的结构中的孔变薄的方法。 :一种用于产生桩体的创造性方法,包括以下步骤:将浆料混合物压入套管内的钻孔中; 并将混凝土放置在钻孔中,以将浆料推起。 在这种方法中,混凝土被放置成使得在混凝土浇筑的开始到完成的期间,所放置的混凝土的上表面推动浆料。 同时,将浆料填充到孔口附近,并进行回收/控制,以在完成放置之前的期间保持其水头水平基本上不变。 因此,即使套管围绕混凝土放置部分被拉出,外部压力如孔壁的接地压力和设置压力也不会克服未合并的混凝土在拉出范围内的内压(侧向压力) 确保防止孔变薄,并且可以确保设计桩直径。
    • 54. 发明专利
    • Excavator and excavating method
    • 挖掘机和挖掘方法
    • JP2007327333A
    • 2007-12-20
    • JP2007214562
    • 2007-08-21
    • Yokoyama Kiso Koji:Kk株式会社横山基礎工事
    • YOKOYAMA HIROSUKE
    • E21B7/20E02D7/00
    • PROBLEM TO BE SOLVED: To effectively conduct inner excavation regardless of properties of the ground.
      SOLUTION: An inner excavator 1 is used for inner excavation by being inserted into a casing pipe when the casing pipe 2 is pressed in, and constituted in a suspendible manner by a crane so as to be able to discharge slime accompanied by the excavation outside the casing pipe. When the inner excavator 1 is operated, following processes A to D are repeated, and the inner excavator 1 is propelled until a slime storage pipe 9 for a lower device 1b is filled in capacity. (A) A hydraulic cylinder 70 for an upper device 1a is extended and a lower device 1b is propelled, and the fixing state of the upper device 1a to the casing pipe 2 is released. (B) The hydraulic cylinder 70 is shrunk in a state in that the upper device 1a is not fixed and the upper device 1a is lowered. (C) The lowered upper device 1a is fixed to the casing pipe 2 and a reaction is secured. (D) The hydraulic cylinder 70 for the upper device 1a is extended and the lower device 1b is propelled.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:无论地面的属性如何,都能有效地进行内挖。 解决方案:内装挖掘机1用于内部挖掘时,当套管2被按压时被插入套管中,并且由起重机以可悬挂的方式构成,以便能够排出伴随着 套管外开挖。 当内挖机1被操作时,重复以下处理A至D,并且内部挖掘机1被推进直到下部装置1b的粘液储存管9被填满。 (A)用于上部装置1a的液压缸70延伸,并且下部装置1b被推进,并且上部装置1a到套管2的固定状态被释放。 (B)液压缸70在上部装置1a不固定,上部装置1a下降的状态下收缩。 (C)下降的上部装置1a固定在套管2上,确保反应。 (D)上部装置1a的液压缸70延伸,下部装置1b被推进。 版权所有(C)2008,JPO&INPIT
    • 56. 发明专利
    • Method for driving steel pipe pile, and screw type steel pipe
    • 用于驱动钢管和螺杆型钢管的方法
    • JP2005002610A
    • 2005-01-06
    • JP2003165204
    • 2003-06-10
    • Jfe Steel KkJfeスチール株式会社Yokoyama Kiso Koji:Kk株式会社横山基礎工事
    • YOKOYAMA HIROSUKETSUSHIMA TOSHIAKI
    • E02D5/24E02D7/22
    • PROBLEM TO BE SOLVED: To create a safe, low-cost and easy-to-construct steel pipe pile by integrating a preceding steel pipe and a following steel pipe together as the steel pipe pile with a prescribed length by a screw joint through the use of a steel pipe as a steel material to be used along with construction work in place of an inhibiting pile with heavy weight and low strength.
      SOLUTION: The steel pipes 13 and 13a are integrated together in a full-rotation-type all casing device 9 by an accompanying crane 12 via a screw; inner excavation and earth removal are performed by means of the accompanying crane 12 via an excavating grab 17; and an anti-rotation pin 20a prevents excessive rotation and corotation. Embedment is efficiently performed with sufficient strength and light weight, and the steel pipe pile is driven in an extremely efficient manner with good working efficiency, safety and low costs.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:通过螺纹接头将先前的钢管和随后的钢管一起作为规定长度的钢管桩组合起来,形成安全,低成本,易于构造的钢管桩 通过使用钢管作为钢材,与施工作业一起使用,代替重量轻,强度低的抑制桩。 解决方案:钢管13和13a通过螺杆由伴随的起重机12一体地集成在全旋转全套壳装置9中; 通过挖掘铲斗17借助伴随的起重机12进行内部挖掘和除泥; 并且防旋转销20a防止过度的旋转和共旋转。 嵌入效率高,强度高,重量轻,钢管桩以极高的效率驱动,工作效率高,安全性低,成本低。 版权所有(C)2005,JPO&NCIPI