    • 46. 发明专利
    • Vertical loading testing method for ground for utilizing foundation of existing structure
    • 用于现有结构基础的垂直加载测试方法
    • JP2005036581A
    • 2005-02-10
    • JP2003276631
    • 2003-07-18
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • UCHIDA AKIHIKOTSUCHIYA TOMIOHAMADA JUNJIOKAMOTO KENYAMASHITA KIYOSHIKAKURAI MASAAKI
    • E02D1/00
    • PROBLEM TO BE SOLVED: To provide a vertical loading testing method of the directly under ground confirming availability of the directly under ground of a structure without pulling down a foundation of the existing structure.
      SOLUTION: A part of a foundation slab coming into contact with the ground surface of the existing structure is separated from the peripheral part in a predetermined size and shape to form a loading slab. A loading testing jack together with a load meter and a displacement meter are installed on the loading slab in an approximately vertical posture to have such a constitution that loading test reaction force is taken in a beam of the existing structure or a slab, and the jack is driven to perform a loading test. After the completion of the loading test, the loading slab is removed to restore the foundation slab, alternatively the loading slab is again combined with the foundation slab to restore the foundation slab.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种直接地下直立荷载测试方法,可确认直接在结构下的结构,而不会拉动现有结构的基础。 解决方案:与现有结构的地表面接触的基础板的一部分以预定的尺寸和形状与周边部​​分分离以形成装载板。 负载测试千斤顶与负载表和位移计一起以大致垂直的姿态安装在装载板上,以具有在现有结构或板坯的梁中加载测试反作用力的结构,并且千斤顶 被驱动进行加载测试。 装载试验完成后,拆卸装载板,恢复基础板,或者将装载板再次与基础板结合,以恢复基础板。 版权所有(C)2005,JPO&NCIPI
    • 50. 发明专利
    • INSPECTION METHOD FOR CAST-IN-PLACE CONCRETE PILE
    • JPH02304116A
    • 1990-12-17
    • JP12450789
    • 1989-05-19
    • TAKENAKA KOMUTEN CO
    • KISHIDA HIDEAKIKAKURAI MASAAKISUGIMOTO MICHIO
    • E02D5/34
    • PURPOSE:To detect the soundness of a pile, the existence of slime in the forward end of the pile and the length of the pile and so on by reading an impulse wave transmitted from an impulse wave sending device buried in the pile through the pile by a sensor. CONSTITUTION:A pile hole 10 is formed in a designated position of a ground 13 to be used as a foundation of a building by digging, and a reinforcement cage A is inserted in the pile hole 10. Before the reinforcement cage A is inserted in the pile hole 10, an ultrasonic wave transmitter 15 is fixed at an intersecting portion of supporting rods A1 disposed like a cross, and the respective end portions of the supporting rods A1 are fixed to reinforcements A2 forming the reinforcement cage A in such a manner that the ultrasonic wave transmitter 15 is positioned on the central axis in the longitudinal direction of the reinforcement cage A or in its vicinity. The ultrasonic wave transmitter 15 and a power supply B on the ground are connected by a cable C. After the reinforcement cage A is inserted in the pile hole 10, ready-mixed concrete is placed, and a sensor 17 is disposed in contact with the surface 11a of the pile head and connected to a monitor 18.