会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 41. 发明专利
    • Wireless lan access point
    • 无线局域网接入点
    • JP2012060523A
    • 2012-03-22
    • JP2010203372
    • 2010-09-10
    • Hitachi Ltd株式会社日立製作所
    • SUZUKI TSUTOMU
    • H04W48/16H04W24/04
    • PROBLEM TO BE SOLVED: To provide a communication system 10 capable of continuing communication by performing switching to a proper system if a trouble occurs in a connection destination or a communication pathway, without incorporating special processing into a terminal 17 side.SOLUTION: The communication system 10 includes an AP 20 that links identification information of a server 11 or a network to SSID and, when a trouble occurs in the server 11 or network, stops transmission of a beacon corresponding to the SSID linked to the identification information of the troubled server 11 or network.
    • 要解决的问题:提供一种能够通过在连接目的地或通信路径中发生故障而通过对适当系统进行切换而能够继续通信的通信系统10,而不将特殊处理并入终端17侧。 解决方案:通信系统10包括将服务器11或网络的识别信息链接到SSID的AP 20,并且当在服务器11或网络中发生故障时,停止与链接到的SSID相对应的信标的传输 故障服务器11或网络的识别信息。 版权所有(C)2012,JPO&INPIT
    • 42. 发明专利
    • Method of calculating electric power system operation target value for electric power transaction
    • 计算电力系统运行目标值的方法用于电力交易
    • JP2003348754A
    • 2003-12-05
    • JP2002156866
    • 2002-05-30
    • Hitachi Ltd株式会社日立製作所
    • SUZUKI TSUTOMUTANITSU MASAHIROTAKEI AKIO
    • G06Q50/06G06Q50/00H02J3/00H02J3/24G06F17/60
    • Y02E40/76Y04S10/545
    • PROBLEM TO BE SOLVED: To obtain maximum passable electric power with system stability in power transaction and electric power system monitor control in electric power market, accompanied by deregulation of electric power.
      SOLUTION: If an accident in a transmission line of the object of electric power system monitor control is in a stable region A, effective power flow at the receiving end of the transmission line is increased, until immediately before it reaches an unstable region B, from the stable region A to monitor and maintain transmission in the stable region A. Even if the load changes suddenly in the stable region A and an accident occurs, since a generator can be kept in a balanced condition and if the accident is resolved, a generator will immediately start operation to minimize power failure time interval, economical operation and high reliability are assured with respect to power supply.
      COPYRIGHT: (C)2004,JPO
    • 要解决的问题:在电力市场的电力交易和电力系统监控控制中获得具有系统稳定性的最大可通电功率,同时放开电力管制。

      解决方案:如果电力系统监控控制对象传输线中的事故处于稳定区域A,传输线接收端的有效功率流量增加,直到其到达不稳定区域为止 B,从稳定区域A进行监视和保持在稳定区域A中的传输。即使稳定区域A中的负载突然变化并且发生事故,由于发电机可以保持平衡状态并且事故解决 发电机将立即开始运行,以最大限度地减少断电时间间隔,经济运行和高可靠性在电源方面得到保证。 版权所有(C)2004,JPO

    • 43. 发明专利
    • Frame controller, transmitter, network system, read control method of buffer
    • 框架控制器,发射器,网络系统,缓冲器的读取控制方法
    • JP2013187684A
    • 2013-09-19
    • JP2012050312
    • 2012-03-07
    • Hitachi Ltd株式会社日立製作所
    • HITOMI TETSUYASUZUKI TSUTOMUKUSANO YOSHIMASAKOBAYASHI SAKUJI
    • H04L12/801H04L12/911
    • PROBLEM TO BE SOLVED: To limit the band for a normal frame by a policer on the subsequent stage of a buffer, while allowing discard of an error frame, in a transmitter including a policer performing band limitation.SOLUTION: A TOP generation unit 605 generates a signal (TOP) for determining input of an individual MAC frame to a transmitter, and a TOP shift control unit 606 gives a fixed delay, of the maximum frame length on system design, to the TOP. A read discard control unit 607 can give a fixed delay exactly even in a device where the clock is different at the input and output of a buffer 603, by controlling read not with the individual MAC frame but with the TOP signal. The read discard control unit 607 can discard an error frame by a fixed delay of the maximum frame length.
    • 要解决的问题:在包括执行频带限制的监视器的发射机中,通过缓冲器的后续级别上的监视器来限制正常帧的频带,同时允许丢弃错误帧。解决方案:TOP生成单元605生成 用于确定向发射机输入个别MAC帧的信号(TOP),以及TOP移位控制单元606给予系统设计上的最大帧长度的固定延迟到TOP。 读取丢弃控制单元607可以通过控制不是利用个别MAC帧而是利用TOP信号来读取缓冲器603的输入和输出中的时钟不同的设备,而能够给出固定延迟。 读取丢弃控制单元607可以以最大帧长度的固定延迟丢弃错误帧。
    • 44. 发明专利
    • Method and device for locating ground fault point of distribution line
    • 用于定位分布线地面故障点的方法和装置
    • JP2011169732A
    • 2011-09-01
    • JP2010033558
    • 2010-02-18
    • Hitachi LtdTohoku Electric Power Co Inc東北電力株式会社株式会社日立製作所
    • TAKAHASHI REIJIYAMAZAKI MAKOTOAIHARA TAKASHISUZUKI TSUTOMUNAGANO MASAMIHONGO YASUJI
    • G01R31/08H02H3/00
    • PROBLEM TO BE SOLVED: To provide a method and device for locating a ground fault point of a distribution line by a capacitor addition method for accurately locating the ground fault point even when noise is in a measured current waveform.
      SOLUTION: Ground accident current flowing in a capacitor disposed between the distribution line and the ground is measured, a first current is determined by eliminating a harmonic component, and the first current is Fourier-transformed to obtain the magnitude of the content included in each frequency band of a predetermined width. The frequency bands are ranked in the descending order of the content, the frequency bands between a maximum frequency band and a minimum frequency band are determined until a predetermined order, a second current which is the component of a frequency band between the maximum frequency band and minimum frequency bands is determined based on the first current, and a ground accident point of the distribution line is calculated based on the gradient of the second current.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种用于通过电容器添加方法来定位配线的接地故障点的方法和装置,用于即使当噪声处于测量的电流波形时也能精确地定位接地故障点。

      解决方案:测量在配电线路和地线之间流过的电容器中的地面事故电流,通过消除谐波分量来确定第一电流,并对第一电流进行傅里叶变换,以获得包含的内容的大小 在预定宽度的每个频带中。 频带以内容的降序排列,确定最大频带和最小频带之间的频带,直到预定顺序为第二电流,第二电流是最大频带和最大频带之间的频带的分量 基于第一电流确定最小频带,并且基于第二电流的梯度来计算配线的接地事故点。 版权所有(C)2011,JPO&INPIT

    • 45. 发明专利
    • Transmitter, transmission system and fault detection method
    • 发射机,传输系统和故障检测方法
    • JP2011009811A
    • 2011-01-13
    • JP2009148240
    • 2009-06-23
    • Hitachi Ltd株式会社日立製作所
    • SUZUKI TSUTOMUATSUMI TOSHIYUKITAKATORI KOJISAKAI KAZUTAKA
    • H04L12/70
    • H04L12/40045
    • PROBLEM TO BE SOLVED: To detect transmission line interruption and degradation by the presence/absence of reception of packet signals within a fixed time interval, without having to transfer an OAM (operation and maintenance) packet.SOLUTION: On a transmission side, a conversion part 212 periodically transmits main signals, without including maintenance operation signal packets. On a reception side, a transmission line fault detector 215 determines that a transmission line fault is detected, when it is determined that the next main signal is not received for the preset time, after receiving the main signal. An OAM processing part 313 detects whether it is a state of not transmitting the main signal to an opposite transmitter or an idle state, on the basis of the detection of the transmission line fault by the transmission line fault detector 215, and transmits a maintenance operation signal for notifying the transmission line fault to the opposite transmitter, when it is in an idle state.
    • 要解决的问题:在固定时间间隔内通过存在/不接收分组信号来检测传输线路中断和劣化,而不必传送OAM(操作和维护)分组。解决方案:在传输侧,转换 部分212周期性地发送主信号,而不包括维护操作信号分组。 在接收侧,在接收到主信号之后,当确定在预设时间内未接收到下一个主信号时,传输线路故障检测器215确定检测到传输线路故障。 OAM处理部313基于传输线路故障检测器215的传输线故障的检测,检测是否不发送主信号到相对发射机或空闲状态的状态,并且发送维护操作 信号,当它处于空闲状态时,通知传输线路故障到相对的发射机。
    • 46. 发明专利
    • Power system monitor and control system
    • 电力系统监控与控制系统
    • JP2008092685A
    • 2008-04-17
    • JP2006271372
    • 2006-10-03
    • Hitachi Ltd株式会社日立製作所
    • SUZUKI TSUTOMU
    • H02J3/00
    • PROBLEM TO BE SOLVED: To enhance the accuracy of determining a system state that seems to be the surest, with regard to a power system monitor and control system. SOLUTION: The power system monitor and control system, which is configured to obtain the state of a power system which seems to be surest using observation values collected from the power system and to perform the monitor and control from the conditions, is provided with a system state calculation device 3. This device obtains a state variable which seems to be surest in the power system as an estimated value by estimating the state using the observation values by a state estimate means 13. Then, the system state which seems to be surest is obtained by performing a power flow calculation by a power flow calculation means 14. In that power flow calculation, the estimated value is used as a specified value for a node to which a generator or a load is connected, while 0.0 is used for the other node. COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:关于电力系统监控系统,提高确定似乎是最确定的系统状态的准确性。

      解决方案:电力系统监控系统被配置为获得似乎确保使用从电力系统收集的观测值并从条件执行监视和控制的电力系统的状态 系统状态计算装置3.该装置通过状态估计装置13通过使用观测值估计状态来获得似乎在电力系统中确定的状态变量作为估计值。然后,似乎 通过由电力流量计算单元14进行功率流计算来获得确定值。在该功率流计算中,将估计值用作发电机或负载连接的节点的规定值,而使用0.0 对于另一个节点 版权所有(C)2008,JPO&INPIT

    • 47. 发明专利
    • Cell culture control method and cell culture control system
    • 细胞培养控制方法和细胞培养控制系统
    • JP2004290147A
    • 2004-10-21
    • JP2003090311
    • 2003-03-28
    • Hitachi Ltd株式会社日立製作所
    • SANO KOICHIMAEKAWA BAKUSUZUKI TSUTOMU
    • C12N5/07C12N5/074C12N5/06
    • C12M41/48
    • PROBLEM TO BE SOLVED: To provide a cell control system or a cell control method capable of controlling a culture plan of a collected cell in accordance with a therapeutic system of a hospital and doctors, controlling culture speed of cell during culture in accordance with medical conditions of a patient, schedule of the hospital and operation of doctors and scheduling shipping schedule of a stem cell or tissue. SOLUTION: In the cell culture system for culturing cell collected from a person to be collected, separating and growing the cell to form the stem cell and obtaining a cultured cell or cultured tissue, when a scheduled date of shipment for shipping the cultured cell or cultured tissue is set from a date using the cultured cell, each period of each item of a culture completion period, a period for practicing passage, a period for charging a growth factor, a culture initiation period, a separating operation period, a receiving inspection period and a receiving period is automatically calculated in the order of the above periods, based on a standard culture schedule, and schedule of each item is specified. COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种能够根据医院和医生的治疗系统来控制收集的细胞的培养计划的细胞控制系统或细胞控制方法,从而根据培养基控制细胞的培养速度 患者的医疗条件,医院的时间表和医生的操作以及调度干细胞或组织的运送计划。 解决方案:在用于培养从收集者收集的细胞的细胞培养系统中,分离和培养细胞以形成干细胞并获得培养的细胞或培养组织,当运送培养的培养细胞 使用培养细胞的日期设定细胞或培养组织,培养完成期间的每个期间,实施期间,培养期间,培养开始期间,分离操作期间, 根据标准文化进度,按照上述期间的顺序自动计算接收检查期和接收期,并指定每个项目的时间表。 版权所有(C)2005,JPO&NCIPI
    • 49. 发明专利
    • MEDICAL X-RAY APPARATUS
    • JP2002291727A
    • 2002-10-08
    • JP2001100518
    • 2001-03-30
    • HITACHI MEDICAL CORP
    • KUROME AKIRASUZUKI TSUTOMU
    • A61B6/00
    • PROBLEM TO BE SOLVED: To provide a medical X-ray apparatus capable of obtaining a reconstructed image with a desired position as a center. SOLUTION: This medical X-ray apparatus has an X-ray tube emitting X-rays to a subject; an image pickup means disposed opposite to the X-ray tube through the subject, picking up an X-ray image of the subject; and a rotation means rotating the X-ray tube and the image pickup means around the subject. The medical X-ray apparatus also has an X-ray tube movement means moving the X-ray tube on a rotation plane of the rotation means; an X-ray detector movement means moving the image pickup means on the rotation plane of the rotation means; a center position-setting means setting the photography center of the subject; and a control means controlling the X-ray tube movement means and the X-ray detector movement means such that the photography center set by the center position-setting means is realized.