会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 24. 发明专利
    • Preload holding device
    • PRELOAD控股设备
    • JP2014159694A
    • 2014-09-04
    • JP2013030438
    • 2013-02-19
    • Taisei Corp大成建設株式会社
    • KOMURO TSUTOMUNISHIYAMA SHOZO
    • E04G23/02E04H9/02F16F15/04
    • PROBLEM TO BE SOLVED: To provide a preload holding device capable of inexpensively holding a preload for a long time, and capable of easily releasing the preload.SOLUTION: A preload holding device 40 introduces a preload to a seismic isolator 30. The seismic isolator 30 includes a plate-shaped lower flange plate 31, laminated rubber 32 provided on the lower flange plate, and a plate-shaped upper flange plate 33 provided on the laminated rubber 32. Female screws 38 and 39 are formed on the lower flange plate 31 and the upper flange plate 33. The preload holding device 40 includes: a holding device body 41 arranged between the flange plates 31 and 33; a lower bolt 42 penetrating the holding device body 41 and screwed with the female screw 38 of the lower flange plate 31; and an upper bolt 43 penetrating the holding device body 41 and screwed with the female screw 39 of the upper flange plate 33.
    • 要解决的问题:提供一种能够长时间廉价地保持预载并且能够容易地释放预载的预载保持装置。解决方案:预载保持装置40将预载荷引入到地震隔离器30中。地震隔离器30 包括设置在下凸缘板上的板状下凸缘板31,叠层橡胶32以及设置在叠层橡胶32上的板状上凸缘板33.内螺纹38,39形成在下凸缘板31上, 上部保持装置40包括:设置在凸缘板31和33之间的保持装置主体41; 穿过保持装置主体41并与下凸缘板31的内螺纹38拧合的下螺栓42; 以及穿过保持装置主体41并与上凸缘板33的内螺纹39拧合的上螺栓43。
    • 25. 发明专利
    • Basement column
    • 地下栏
    • JP2013159986A
    • 2013-08-19
    • JP2012023536
    • 2012-02-06
    • Taisei Corp大成建設株式会社
    • KOMURO TSUTOMUFUJIYAMA JUNJIWATANABE YUICHI
    • E02D29/045E04B1/24E21D13/00
    • PROBLEM TO BE SOLVED: To provide a basement column capable of securing strength of a part positioned on a pile head, while achieving weight saving.SOLUTION: A basement column 1 is erected in a cast-in-place pile by an inverted construction method. The basement column 1 includes a lower portion 10 which is elongated in a vertical direction and inserted into the cast-in-place pile 2, and an upper portion 20 which is elongated upward from the lower portion 10. The lower portion 10 is made of cross H-shaped steel 11; the upper portion 20 is made of a rectangular steel tube 21 which has a lower end closed; and a flange 13 of the cross H-shaped steel 11 of the lower portion 10 has a constant vertical width.
    • 要解决的问题:提供一种能够确保位于桩头上的部件的强度的基底柱,同时实现减轻重量。解决方案:地下室柱1通过倒置施工方法竖立在现浇桩中。 地下室1包括在垂直方向上伸长并插入到现浇桩2的下部10和从下部10向上延伸的上部20.下部10由 十字H型钢11; 上部20由下端封闭的矩形钢管21制成, 下部10的十字H字形钢11的凸缘13具有恒定的垂直宽度。
    • 26. 发明专利
    • Shear reinforcement structure of beam and pre-stressed concrete beam provided with the same
    • 梁和预应力混凝土梁的剪切加固结构
    • JP2013155604A
    • 2013-08-15
    • JP2013108539
    • 2013-05-23
    • Taisei Corp大成建設株式会社
    • KORENAGA TAKEYOSHITAKEZAKI SHINICHIKOMURO TSUTOMUKAWAMOTO SHINICHIROKAI TAKAOINADA HIROBUMI
    • E04C3/36
    • PROBLEM TO BE SOLVED: To provide a shear reinforcement structure of a beam, capable of miniaturizing the size and weight of the beam, and a pre-stressed concrete beam provided with the same.SOLUTION: In a pre-stressed concrete beam, a precast pretension member including a span central part of the beam and a precast RC member joined to at least one end of the pretension member are pressed and joined together by tendons disposed in an upper portion and a lower portion of each of the members. The upper portion of each of the pretension member and the RC member is provided with a plurality of upper side main bars embedded in a plurality of rows and in a plurality of stages; the lower portion of each of the pretension member and the RC member is provided with a plurality of lower side main bars embedded in a plurality of rows and in a plurality of stages; the periphery of the upper side main bars is provided with a plurality of upper side restriction bars arranged at equal intervals in an axial direction and worked to be annular to restrict the upper side main bars; and the periphery of the lower side main bars is provided with a plurality of lower side restriction bars arranged at equal intervals in an axial direction and worked to be annular to restrict the lower side main bars.
    • 要解决的问题:提供能够使梁的尺寸和重量小型化的梁的剪切增强结构以及设置有梁的预应力混凝土梁。解决方案:在预应力混凝土梁中,预制 包括梁的跨度中心部分的预张紧构件和连接到预紧构件的至少一端的预制RC构件通过设置在每个构件的上部和下部中的筋被按压并连接在一起。 每个预紧构件和RC构件的上部设置有多个嵌入多行和多级的上侧主杆; 每个预紧构件和RC构件的下部设置有多个嵌入多行和多级的下侧主杆; 上侧主杆的周边设置有沿轴向等间隔布置的多个上侧限制杆,并加工成环形以限制上侧主杆; 并且下侧主杆的周边设置有沿轴向等间隔布置的多个下侧限制杆,并被加工成环形以限制下侧主杆。
    • 27. 发明专利
    • Reinforced concrete wall column
    • 加固混凝土墙
    • JP2013057174A
    • 2013-03-28
    • JP2011194685
    • 2011-09-07
    • Taisei Corp大成建設株式会社
    • KORENAGA TAKEYOSHISUGIYAMA TOMOAKIKOMURO TSUTOMUFUJIYAMA JUNJIIMAZU YUKO
    • E04C3/34E04B1/16E04B2/84E04C5/18
    • PROBLEM TO BE SOLVED: To provide a reinforced concrete wall column having high quality and excellent structural performance.SOLUTION: A reinforced concrete wall column 1 includes a plurality of narrow diameter column main reinforcement bars 11, 11,... arranged in two lines along a long side direction and a large diameter column main reinforcement bar 12 arranged at an end part in the long side direction. The large diameter column main reinforcement bar 12 is arranged between the narrow diameter column main reinforcement bars 11 and 11 adjacent to each other in a short side direction and also between the narrow diameter column main reinforcement bars 11 and 11 adjacent to each other in the long side direction, and reinforcement joints of the large diameter column main reinforcement bars 12 are joined with each other by a mechanical joint or a pressure-welding joint.
    • 要解决的问题:提供具有高质量和优异结构性能的钢筋混凝土墙柱。 解决方案:钢筋混凝土墙柱1包括沿着长边方向布置成两条直线的多个窄直径的柱主加强筋11,11,和排列在一端的大直径柱主加强杆12 部分在长方向。 大直径列主加强筋12布置在短边方向上彼此相邻的窄直径列主加强筋11和11之间,并且在长条形的彼此相邻的窄直径列主加强条11和11之间布置 侧面方向,大直径柱主加强筋12的加强接头通过机械接头或压接接头彼此接合。 版权所有(C)2013,JPO&INPIT
    • 28. 发明专利
    • Method and structure for reinforcing concrete column
    • 用于加固混凝土柱的方法和结构
    • JP2012229615A
    • 2012-11-22
    • JP2012189373
    • 2012-08-30
    • Taisei Corp大成建設株式会社
    • IIZUKA TAKAFUMINARIHARA HIROYUKIKOMURO TSUTOMUKANEDA KAZUHIRO
    • E04G23/02
    • PROBLEM TO BE SOLVED: To provide a method for reinforcing a concrete skeleton which can improve shear capacity at a low cost.SOLUTION: A method for reinforcing a concrete skeleton reinforces an existing concrete column 10. In the method, horizontal reinforcements 11 are disposed on the outer peripheral side surfaces 101-104 of the existing concrete column 10, a new concrete skeleton as an extension part 14 is provided so as to come into contact with one side surface 101 of the existing concrete column 10, and a winding and standing part 13 for covering the existing concrete column 10 together with the extension part 14 is formed by coating the side surfaces 102-103 of the existing concrete column 10 with a polymer cement mortar so as to cover the horizontal reinforcements 11.
    • 要解决的问题:提供一种能够以低成本提高剪切能力的混凝土骨架的加强方法。 解决方案:用于增强混凝土骨架的方法加强了现有的混凝土柱10.在该方法中,水平加强件11设置在现有混凝土柱10的外周侧表面101-104上,新的混凝土骨架为 延伸部14设置成与现有的混凝土柱10的一个侧面101接触,并且通过涂覆侧面来形成用于将现有的混凝土柱10与延伸部14一起覆盖的卷绕和立起部13 102-103现有的混凝土柱10与聚合物水泥砂浆以覆盖水平增强材料11.版权所有(C)2013,JPO&INPIT
    • 29. 发明专利
    • Structure construction method and structure under construction
    • 建筑结构施工方法与结构
    • JP2012046950A
    • 2012-03-08
    • JP2010189632
    • 2010-08-26
    • Taisei Corp大成建設株式会社
    • MATSUMOTO SHUICHIKAWAMOTO SHINICHIROKOMURO TSUTOMUWATANABE TORU
    • E02D29/045E21D13/00
    • PROBLEM TO BE SOLVED: To provide a structure construction method that can reduce difference in the vertical displacement of a preceding floor while minimizing construction period extension and cost increase.SOLUTION: With this construction method, an underground skeleton 10 of a building 1 is constructed by using the top down basement construction method. That is: predicted vertical displacement that is anticipated to occur at the heads of underground piled columns 15A and 15B during a construction process is compared between the adjacent underground piled columns 15A and 15B; if the difference in the predicted vertical displacement exceeds a prescribed value, the underground skeleton 10 is sectioned into an area where the predicted vertical displacement is larger and the other area where the predicted vertical displacement is smaller; and, for the underground piled columns 15B located in the area with larger predicted vertical displacement, concrete is placed without allowing the vertical displacement to occur, while for the underground piled columns 15A located in the area with smaller predicted vertical displacement, concrete is placed after allowing the vertical displacement to occur.
    • 要解决的问题:提供一种结构施工方法,其可以减少施工期延长和成本增加的同时减少前一层的垂直位移的差异。 解决方案:利用这种施工方法,通过使用自顶向下的地下室施工方法构造建筑物1的地下骨架10。 也就是说,在相邻的地下堆叠塔15A和15B之间比较在施工过程中预期在地下堆叠柱15A和15B的头部发生的预测垂直位移; 如果预测的垂直位移的差异超过规定值,则将地下骨架10分割为预测的垂直位移较大的区域,预测的垂直位移较小的区域; 对于位于具有较大预测垂直位移的区域的地下桩柱15B,放置混凝土而不允许发生垂直位移,而对于位于具有较小预测垂直位移的区域的地下桩柱15A,混凝土放置在 允许发生垂直位移。 版权所有(C)2012,JPO&INPIT
    • 30. 发明专利
    • Method for manufacturing prestressed concrete member
    • 制造预制混凝土构件的方法
    • JP2011184871A
    • 2011-09-22
    • JP2010048502
    • 2010-03-05
    • Taisei Corp大成建設株式会社
    • KORENAGA TAKEYOSHITAKEZAKI SHINICHIKAI TAKAOKOMURO TSUTOMU
    • E04C5/08E04G21/12
    • PROBLEM TO BE SOLVED: To provide a method for manufacturing a prestressed concrete member, which makes it unnecessary for an anchoring fitting to be left behind at the end of the concrete member, and which enables prestress to be easily introduced even on a construction site etc. with a limited working space.
      SOLUTION: This method for manufacturing the prestressed concrete member includes: a tensioning step of inserting a tendon 4 through an insertion hole 3 formed in the concrete member 2 and bearing plates 6 disposed on both the end surfaces of the concrete member 2, and of introducing a tensioning force into the tendon 4; a compression step of introducing the prestress into the concrete member 2 via the bearing plates 6 and 6 by releasing the tensioning force of the tendon 4; a filling step of infilling a filler 5 into the insertion hole 3; and an anchoring step of reintroducing the tensioning force into the tendon 4 after the expression of the strength of the filler 5, and of anchoring the tendon 4 by releasing the reintroduced tensioning force, so as to remove the bearing plate 6.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了提供一种制造预应力混凝土构件的方法,这使得锚固配件不必在混凝土构件的端部留在后面,并且使得即使在 施工现场等有限的工作空间。 解决方案:这种制造预应力混凝土构件的方法包括:张紧步骤,通过形成在混凝土构件2中的插入孔3和布置在混凝土构件2的两个端面上的承载板6插入腱4, 并向腱4内引入张紧力; 压缩步骤,通过释放腱4的张紧力,通过支承板6和6将预应力引入混凝土构件2; 填充步骤,将填料5填充到插入孔3中; 以及在表示填充物5的强度后将拉伸力再次引入到腱4中的锚定步骤,以及通过释放再引入的张紧力来锚定腱4,以便移除支承板6。 :(C)2011,JPO&INPIT