    • 21. 发明专利
    • STONE-FILLED EMBANKMENT STRUCTURE
    • JPH0885931A
    • 1996-04-02
    • JP22298594
    • 1994-09-19
    • NIPPON STEEL METAL PROD
    • TOIYA JIYUNJIIWASA NAOTOSUMIYA YOICHI
    • E02B3/08
    • PURPOSE: To produce wire cylinders etc., for use in the revetment work, forestry conservancy, sabo-works, etc., by structuring each cylinder so that it is filled with stones and/or grits for generating a resistance against an external force such as earth pressure, water pressure, etc. CONSTITUTION: A skeleton is formed from steel pillars 10 installed at the four corners and steel longitudinal members 11 and crosswise members 12 which couple the ends of the pillars 10. A screen 13 is installed on each surface of the framework except the over-part so that a steel framework A having a capacity capable of accommodating wire cylinders 2 filled with stones is formed. This framework A is installed in advance in the revetment position, and a plurality of wire cylinders 2 filled with stones 1 are put in the framework A from its over-part opening. According to this structure in which the wire cylinders 2 with stone material 1 are put in the framework made of steel sturdily, there is no risk of cylinder dislocation or collapse.
    • 22. 发明专利
    • GABION STRUCTURE AND EARTH RETAINING WALL
    • JP2001248138A
    • 2001-09-14
    • JP2000056856
    • 2000-03-02
    • NIPPON STEEL METAL PROD
    • HORI KENGOIBA SHIGEOIWASA NAOTO
    • E02B3/08E02D17/20E02D29/02
    • PROBLEM TO BE SOLVED: To prevent the slip-up of a gabion when an abrupt diastrophism occurs in an earthquake or the like. SOLUTION: Two L-shaped net bodies 4 each formed with wall parts 2 and a bottom part 3 are arranged face to face in the longitudinal direction (retaining wall thickness direction) so that the bottom tip parts 3a are superposed on each other to form U-shaped gabion 1. The gabions 1 are stacked in a plurality of stages while being displaced stepwise to form a gabion structure 5. The lower gabion 1A and the upper gabion 1B are connected by horizontal members 7 suspended between the upper edge parts 2a of the front and rear wall parts 2 of the lower gabion 1A, connecting metal fittings 8 fitted to the horizontal members 7, and diagonal members 9 connecting the connecting metal fittings 8 and the upper edge parts 2a of the front and rear wall parts 2 of the upper gabion 1B. The upper gabion 1B is connected to the lower gabion 1A by the diagonal members 9 or the like prevent its slip-up, the connecting work is very simple, and the workability is good.
    • 23. 发明专利
    • METHOD OF SLOPE STABILIZATION CONSTRUCTION
    • JPH11124858A
    • 1999-05-11
    • JP30793197
    • 1997-10-22
    • NIPPON STEEL METAL PROD
    • IWASA NAOTOMIZUHARA TAKAYUKIOSUMI HISASHI
    • E02D17/20E02D5/80
    • PROBLEM TO BE SOLVED: To prevent flowing-down to a lower section from the mountain side of soil and sand on a ground surface of the face of a slope, to which a method of slope stabilization construction is executed. SOLUTION: Bearing-pressure members 1 are installed at the upper end sections of a plurality of anchor rods 5 driven to the face of a slope 8a at intervals respectively, nuts 7 are clamped and tensile force is applied to the anchor rods 5, and the tensile force is transmitted to the face of the slope through the bearing-pressure members 1 and the face of the slope is stabilized. Beltlike netted members 10 are stretched at right angles with the face of the slope among the two bearing-pressure members 1 arranged in the horizontal direction. Even when soil and sand on a ground surface intend to flow down from the mountain side to a lower section owing to the inclination of the face of the slope 8a, the netted members 10 stop soil and sand. Not only a slope ground is stabilized by a bearing-pressure effect by the bearing-pressure members 1 but also the flowing-down of soil and sand on the ground surface can be prevented.
    • 30. 发明专利
    • SPRAYING SLOPE FRAME CONSTRUCTION METHOD AND SPRAYING SLOPE FRAME
    • JP2000257076A
    • 2000-09-19
    • JP5907399
    • 1999-03-05
    • NIPPON STEEL METAL PROD
    • MIURA KAZUSHISUZUKI KAZUMASAIWASA NAOTO
    • E02D17/20
    • PROBLEM TO BE SOLVED: To easily, certainly and efficiently carry out work to arrange reinforcing bars in lattice work at right positions on a slope by providing sufficiently large slope inhibiting force and eliminating a trouble of causing slope collapse in the middle of construction. SOLUTION: An anchor is arranged to form a lattice on a slope, a bearing member 17 is installed on a head of this anchor, and restraint force of the slope is provided by the bearing member 17 and the anchor. Reinforcing bars 13 are individually arranged between the anchors 16. Head end parts of the reinforcing bars 13 are dropped in longitudinal grooves 22, 23 in different depth provided on side plates 19 on four corners of the bearing member 17, and they are fixed on the side plates 19 by fastening them by two nuts 29 screwed in screw parts of the head end parts of the reinforcing bars 13. A lattice type slope frame is formed by spraying mortar or concrete on parts of the reinforcing bars 13 and a part of the bearing member 17. Thereby, the reinforcing bars 13 are correctly arranged when they are dropped in the longitudinal grooves 22, 23 of the side plates 19. Additionally, it is possible to secure stabilization of the slope at a stage before arranging the reinforcing bars 13.