会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 13. 发明专利
    • Method and apparatus for erecting structural center pillar at reverse-casting time
    • 在反倾销时间内研究结构中心支柱的方法和装置
    • JPS58218515A
    • 1983-12-19
    • JP9895682
    • 1982-06-09
    • Asahi Kizai KkTakenaka Komuten Co Ltd
    • IKEDA HISAOKITANI WASABUROUITOU YASUTADAIWANAGA KAORUTOMIYADO TAKETSUGUABE SHIGETAKAISHII OSAMUKIKUCHI MASAMITSUKAMAZAKI NOBUYOSHI
    • E02D13/04
    • E02D13/04
    • PURPOSE:To raise the accuracy of erecting a pile as well as eliminate the need for correcting the pile by a method in which a structural center pillar and a follower pillar are integrally connected while adjusting their vertical accuracies and the pillars are erected by hanging down them from the upper part of a structural center pillar-centering tool. CONSTITUTION:A pit 2 for a continuous wall is excavated, an iron bar cage is erected into the pit by a crane, and concrete is placed. Also, a Benoto pit 16 is excavated for correcting the vertical accuracy of the follower pillar 11 and the structural center pillar 10, and both the pillars 11 and 10 are connected by using a follower pillar setting tool 8. Then, both the pillars 11 and 10 are erected into the pit by hanging down them from the upper part of a structural center pillar centering tool 13 set at the top of the continuous wall pit 2. Lastly, after the structural center pillar 10 is stably erected, the centering tool 13 is removed and the pit 2 is back-filled with soil.
    • 目的:提高竖立桩的准确性,并且通过将结构中心柱和随动柱整体连接在一起的方法消除了对桩的修正的需要,同时调整其垂直准确度,并且通过悬挂它们来竖立支柱 从结构中心支柱定心工具的上部。 构成:挖出一个连续墙的坑2,用起重机将一个铁栏笼竖立在坑中,并放置混凝土。 此外,挖掘了Benoto坑16,用于校正从动柱11和结构中心柱10的垂直精度,并且通过使用从动柱固定工具8连接两个柱11和10.然后,两个柱11和 通过将它们从设置在连续壁坑2的顶部的结构中心柱定心工具13的上部悬挂在坑中而被竖立。最后,在结构中心柱10稳定地竖立之后,定心工具13是 并且坑2被填充土壤。