会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 11. 发明专利
    • METHOD FOR OPERATING SOLID REDUCING MATERIAL PACKED BED TYPE SMELTING REDUCING FURNACE
    • JP2001207205A
    • 2001-07-31
    • JP2000013393
    • 2000-01-21
    • KAWASAKI STEEL CO
    • MIZUFUJI MASATOMASUMOTO SHINICHITAKAHIRA TAKUYA
    • C21B11/02
    • PROBLEM TO BE SOLVED: To easily realize the stabilization of furnace operation at a low cost. SOLUTION: The required ratio Y of the quantity of heat at the base surface of furnace casing of the ordinate is the value obtained by dividing the necessary quantity Q1 of heat per 1 m2 of the furnace bottom when the operation is resumed after the furnace is stopped for eight hours by the quantity Q2 of heat supplied per 1 m2 the furnace bottom in ordinary operation and the required ratio 1.0 of the quantity of heat at the base surface of the furnace casing is in the case of Q1=Q2. The quantity Q2 of heat supplied per 1 m2 of the furnace bottom is made proportional to the amount of the produced melt, i.e., the amount of the pig slag recovered from a tap hole. The relation of X and Y is expressed by formulas Y=2.6930-0.45307μlog10(X). Y>=1.0Xmax=5454. From these formulas, the value of Y meeting the amount of tapping (production scale of the furnace) X per day is determined and further, the necessary quantity of heat to the furnace bottom is calculated from the value of Y. The amount of feeding the ferrous scrap into the furnace meeting the necessary quantity of heat is determined and the ferrous scrap of at least this amount of feeding is fed into the furnace.
    • 14. 发明专利
    • METHOD FOR CONTROLLING FIRING OF MUD MATERIAL IN PREOPENING OF BLAST FURNACE TAP HOLE
    • JPH0734111A
    • 1995-02-03
    • JP18239493
    • 1993-07-23
    • KAWASAKI STEEL CO
    • MASUMOTO SHINICHIHIRANO JUNKICHI
    • C21B7/12
    • PURPOSE:To adequately control hole openability by driving of a steel rod at the time of executing preopening of a mud material by determining the time since the mud material is packed into a tap hole a before a mud gun is removed to the specific conditions. CONSTITUTION:The mud material 5 is press fitted and packed by means of the mud gun 6 into the tap hole 2 penetrating the wall 1 of a blast furnace. The mud gun 6 is removed in the stage when firing of the mud material 5 progresses to some extent. The steel rod is driven into the mud material 5 and while the steel rod is held penetrated therein, the steel rod is held before the next tapping is started. The pressing time by the mud gun 6 of this time since the mud material 5 is packed into the tap hole 2 before the mud gun 6 is removed is determined according to a relation between the predetermined pressuring pressure on the mud material 5/the extruded amt. of the mud material and the pressing time by the mud gun 6. As a result, the excess and deficiency of the firing according to a change in the amt. of pressurization on the packed mud material 5 are estimated by the press fitting condition of the mud material 5. The firing of the mud material is thus kept constant.