会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Self-supporting type reinforced steel jacket revetment
    • 自支撑类型钢筋护套
    • JPS59109606A
    • 1984-06-25
    • JP21920482
    • 1982-12-16
    • Nippon Steel Corp
    • YOSHIGA TOSHINARIKOYADA HIROSHI
    • E02B3/06E02B3/04
    • E02B3/04
    • PURPOSE:To construct a stable self-supporting type revetment by a method in which steel jackets connected to tubular pillars with connectors are set on the bottom under water in the front and rear sides of intermediate tubular pillars arranged in one row, and piles are driven through the tubular pillars into the ground. CONSTITUTION:After the ground 5 under water, where a revetment is to be constructed, is leveled, steel jackets 11B for one block are installed on the ground 5, and piles 7 with sheathing plate insertion supporters 6 for main wall are inserted into the intermediate tubular pillars 1 and driven into the ground 5 under water under the guidance of the pillars 1. Cement mortar grout is poured into the aperture between the intermediate tubular pillars 1 and the main wall pile 7 for fixation. Footing piles 10 may be likewise driven into even the front and rear tubular pillars 2 and 3 connected to the pillars 1 with connectors 4. A sheathing plate 8 is inserted between the supporters 6, back-filling soil and sand are packed into the back side of the plate 8, and a coping 18 is constructed to complete a revetment.
    • 目的:通过将连接管状支柱与连接器连接的钢夹套设置在排列在一排的中间管状支柱的前后侧的水下方的底部的方法构成稳定的自支撑型护岸,并且驱动桩 通过管状柱子进入地面。 规定:在水上建造护岸的地面5后,平整,将一块块的钢夹克11B安装在地面5上,将主壁护板6插入支架6的桩7插入中间层 管柱1,并在柱子1的引导下在水下驱动到地面5中。将水泥砂浆灌浆入中间管柱1和主壁桩7之间的孔中以固定。 也可以将底脚10驱动到连接到具有连接件4的支柱1的前后管状支柱2和3中。护板8插入支撑件6之间,将填充后的土壤和沙子装入后侧 并且构造一个盖板18以完成护岸。
    • 4. 发明专利
    • Method and apparatus for preventing river from meandering of water, scraping and erosion of bank
    • 用于防止水的破坏的方法和装置,银行的切割和腐蚀
    • JPS598815A
    • 1984-01-18
    • JP11508882
    • 1982-07-02
    • Shigeru Kaneko
    • KANEKO SHIGERU
    • E02B3/02E02B3/04
    • E02B3/04
    • PURPOSE:To suppress the erosion of river bank due to meandering of river water by artificially changing the flowing direction of the river water. CONSTITUTION:Plural flow-changing guides 1 provided with plates 3 inclined in the face of the flow-down direction of water are set on the bottom of a river. The original meandering of the river water is suppressed by concentrating the main stream of the water flow on a fixed direction in such a way as to gradually correct it in the straight direction. When plural flow-changing guides 1 are settled and set at intervals in one line on the bottom of the river 10, the main stream of the river water collides on the plates 3 and is directed toward other directions to erode the left expanded bank L, and thereby soil and sand are gradually deposited on the eroded right bank R. Therefore, the curved part of the meandering area 11 is gradually corrected into straight form.
    • 目的:通过人为地改变河流的流向,抑制河水蜿蜒曲折的河岸侵蚀。 构成:设置有在水面向下倾斜的板3的多个换流导向装置1设置在河底。 通过将水流的主流集中在固定方向上,以使其在直线方向逐渐校正的方式来抑制河水的原始蜿蜒。 当多个换流导向器1在河流10的底部上一行地定期设置时,河水的主流在板3上碰撞并指向其他方向以侵蚀左扩展堤岸L, 从而土壤和沙子逐渐沉积在侵蚀的右岸R上。因此,曲折区域11的弯曲部分被逐渐校正成直线形式。
    • 5. 发明专利
    • Assembler for prefabricated steel sheet pile cell
    • 预制钢板组件
    • JPS58207410A
    • 1983-12-02
    • JP8987082
    • 1982-05-28
    • Penta Ocean Constr Co Ltd
    • WATARI YOSHIHARUKUSAMITSU MORIOTERAJIMA KAZUHIKO
    • E02D7/16E02B3/04E02D5/04E02D23/00E02D23/02
    • E02B3/04
    • PURPOSE:To shorten the construction period of steel sheet pile cells by making their assembly easier by providing a means whose buoyancy can be easily adjusted by charging of water. CONSTITUTION:A floater pontoon 1 whose buoyancy is freely adjusted by charging of water, a weight 3 to be hung down from the floater pontoon 1 by a wire 2, and a guide frame 5 to be provided on the side of the floater pontoon for assembling prefabricated steel sheet pile cells are provided. By the system in which the steel sheet pile cells 6 can be assembled under the guidance of the guide frame 5, the assembly of the steel sheet pile cells 6 can be made easier because the position of the floater pontoon on the seabed is not almost varied even by the variations in tidal levels.
    • 目的:通过提供一种能够通过充水来调节浮力的方法,缩短钢板桩单元的施工周期,从而更容易。 构成:浮子浮筒1,其浮力由水充水自由调节,重物3由浮子浮筒1由导线2悬挂下来,导向架5设置在浮子浮筒的一侧,用于组装 提供了预制钢板桩单元。 通过在引导框架5的引导下组装钢板桩单元6的方式,能够使钢板桩单元6的组装更容易,因为浮体在海床上的位置几乎不变化 即使潮汐水平的变化也是如此。
    • 7. 发明专利
    • 浸水防止堰
    • 防止淹水
    • JP2016079775A
    • 2016-05-16
    • JP2014215406
    • 2014-10-22
    • カンボウプラス株式会社船山株式会社ダイワボウホールディングス株式会社
    • 横田 孝中村 信治河合 秀和
    • E02B3/04
    • E02B3/04
    • 【課題】高い波が押し寄せた場合などでも、越流を防止することができ、しかも、高い波に対して越流を防止する場合でも大型化しなくても済ませることが可能な浸水防止堰を提供する。 【解決手段】浸水防止堰1は、それぞれ防水布からなる底面部2と堰壁部4とを備え、底面部2の奥端部と堰壁部4の下端部とを防水布の可撓性により、堰壁部4が倒伏姿勢から起立可能な状態で一体に形成されている。堰壁部4には、芯材収納部5が設けられて、堰壁部4の下端部近傍箇所から上端部近傍箇所まで芯材6が収納され、底面部2の上面と堰壁部4の前面側とをつなげて、堰壁部4の起立時の角度を規制する規制隔壁部7が設けられ、底面部2に重り8が配設されている。 【選択図】図1
    • 要解决的问题:提供一种即使在高波浪涌入时也可以防止溢流的防洪堰,即使在防止高波浪溢流的情况下也可以防止尺寸增大。解决方案:防洪堰1包括 每个由防水片制成的底面部分2和堰壁部分4,堰壁部分4的底面部分2和下端部分的深端部分一体地形成在堰壁 第4部分可以通过防水片的柔性从倒伏状态中脱离出来。 在堰壁部4中安装有芯材收纳部5,将芯材6从下端部附近的位置收纳到堰壁部4的上端部附近的位置。通过将顶面 在堰壁部4的前侧设置有用于限制堰壁部4的立起角度的限制分隔壁部7,并且在底面部2中配置有重物8 图1