会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 9. 发明专利
    • CONSTRUCTION METHOD FOR REINFORCED BANKING BODY
    • JPH04108917A
    • 1992-04-09
    • JP22449890
    • 1990-08-28
    • TOKYU KENSETSU KKRAILWAY TECHNICAL RES INST
    • TAMURA YUKIHIKOTATEYAMA MASARU
    • E02D3/00E02D17/18
    • PURPOSE:To simplify the operations by arranging supporting members between self-supporting form materials and drainage material side in which planar reinforcing materials are wrapped, removing the supporting members after construction of a banking body, and placing concrete between the form materials and the drainage materials. CONSTITUTION:A pit is excavated to install form materials 1 such as concrete panels, etc., into it, and then refilled to make the form materials self-supporting. Next the supporting members are arranged on the banking-body construction side of the form materials 1 through wedges, drainage materials 6 are wrapped up in the end parts of planar reinforcing materials 5, and banking materials 7 are laid over the other parts to construct a banking body. Further, each time one layer of the banking is constructed, the wedges and the supporting members are removed to be used for constructing the upper stages of the banking. After the removal of the supporting members, concrete is placed between the form materials 1 and the drainage materials 6 to construct a body concrete 8. Thus, the need for reaction force at the time of concrete placing can be eliminated to simplify the work.
    • 10. 发明专利
    • CONSTRUCTION METHOD FOR REINFORCED BANKING BODY
    • JPH04108916A
    • 1992-04-09
    • JP22449690
    • 1990-08-28
    • TOKYU KENSETSU KKRAILWAY TECHNICAL RES INST
    • TAMURA YUKIHIKOTATEYAMA MASARU
    • E02D3/00E02D17/18
    • PURPOSE:To reduce the construction period and the construction cost by throwing banking materials on a reinforcing sheet in one end of which sandbags are wrapped, to construct a banking body, thereafter mounting forms along the slope by means of spacer-rods capable of being expanded and contracted to construct a retaining wall. CONSTITUTION:Banking materials 3 are thrown on a water-permeable reinforcing sheet 2 such as geo-textile, etc., in one end of which sandbags 1 are wrapped, up to the same height as that of the sandbags 1. In this case, the upper stage of a banking is shifted inward from the lower stage to repeat the operations in sequence to pile up the banking body. After construction of the banking body, the end parts of the reinforcing sheet 2 are pinched by steel plates of the end parts of spacer-rods 4 to be connected to the slope of the banking body. Then, the spacer-rods 4 are expanded and contracted to position forms 6 along the slope at fixed intervals, and between the formes and the slope concrete 71. is placed to construct a retaining wall 7. The concrete placing pressure can thus be applied to the banking body, and thereby the retaining wall 7 can be positively constructed.