会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • SYSTEM FOR POWDER COATING FOR ELEMENTS TO BE COATED OF CONSIDERABLE LENGTH
    • 用于涂覆元件的粉末涂层系统的可视长度
    • EP2978539B1
    • 2017-05-31
    • EP14711994.5
    • 2014-03-25
    • SAT (SURFACE ALUMINIUM TECHNOLOGIES) S.p.A.
    • TREVISAN, Silvio Maria
    • B05B13/02B05B15/12B05D7/00
    • B05B13/0214B05B14/44B05B16/90Y02P70/36
    • The invention discloses a system (I) for powder coating elements to be coated of considerable length, characterised in that it comprises, within an overall occupied floor space (800), a safety area (50) dedicated to the work activities of personnel, exhibiting a zone dedicated to the stage of loading (100) and a zone dedicated to the stage of unloading (600) the finished elements (1) from the overhead conveyor line (2), said safety area (50) marking the perimeter of a single, central block (101) exhibiting the activities of the production process and the specific units predisposed thereto and identified as a unit (200) dedicated to the pre-treatment of the elements to be coated, a unit (300) dedicated to the drying of the elements to be coated and a unit (500) for the polymerisation of coating powders deposited on the elements to be coated, there being further provided a unit (400) dedicated to coating and an overhead conveyor line (2) for the elements to be coated (1) that extends with a winding path. The invention further discloses a procedure for coating elements to be coated of considerable length (1), characterised in that it provides a coating booth (401) that has a triangular plan schematically identified by a first, a second and a third vertex (A, B and C), and a conveyor line (2) for the elements (1) that enters a side (BC) and extends along a path that brings said elements to be coated (1) toward said first vertex (A) and then returns and has said elements to be coated (1) exit from said side (BC) in a substantially symmetrical position with respect to said first vertex (A), said path being configured so that the elements to be coated (1), in transit in the booth, encounter direct spraying by sets of electrostatic spray guns (10 and 11), and coating powder, which, given that it has not directly deposited on said elements to be coated (1), travels toward a vertical suction inlet (12) located at said first vertex (A), and encounters the array of profiles in transit prior to being suctioned.
    • 本发明公开了一种用于待涂覆的粉末涂料元件的相当长的系统(I),其特征在于,其包括在总占用的地板空间(800)内的专用于人员工作活动的安全区域(50) 专用于装载阶段(100)的区域和专用于从架空输送线(2)卸载(600)完成的元件(1)的阶段的区域,所述安全区域(50)标记单个 ,显示生产过程的活动的中央块(101)和预先设置在其中的特定单元并且被识别为专用于待涂覆元件的预处理的单元(200),专用于干燥 待涂覆的元件和用于沉积在待涂覆的元件上的涂覆粉末的聚合的单元(500),还提供专用于涂覆的单元(400)和用于待涂覆的元件的顶部输送线(2) 涂层(1)延伸机智 h绕组路径。 本发明还公开了用于涂覆相当长的待涂覆元件(1)的过程,其特征在于,其提供具有由第一顶点,第二顶点和第三顶点(A, (1)的输送线(2),所述输送线进入侧面(BC)并且沿着使所述待涂覆元件(1)朝向所述第一顶点(A)并且然后返回 并且所述待涂覆元件(1)相对于所述第一顶点(A)在基本对称位置从所述侧面(BC)离开,所述路径被构造成使得待涂覆元件(1) 该展台通过成套的静电喷枪(10和11)进行直接喷射,以及涂层粉末,由于其未直接沉积在所述待涂覆的元件(1)上,所述涂层粉末朝向竖直吸入口(12)行进, 位于所述第一顶点(A)处,并且遇到在b之前的传送中的配置文件阵列 吸引。