会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明公开
    • Plant for the hot treatment of waste gases from municipal waste incinerators
    • 用于热处理城市垃圾焚烧炉废气的工厂
    • EP1410834A3
    • 2004-05-26
    • EP03022086.7
    • 2003-10-02
    • Saccani, Cesare
    • Saccani, Cesare
    • B01D53/12
    • B01D53/12
    • Plant for the hot treatment of waste gases from municipal waste incinerators or the like, comprising a first line (6) of taking up hot waste gases for treating in an exit section of a municipal waste incinerator, a one stage or multiple stage fluid bed (23, 30, 35) contained within one or several reactors (8, 9) and invested by the waste gases to be treated, at least one hopper (24, 34) for charging the solid granular material into the reactor or reactors (8, 9), a cyclone separator (10) at the outlet of the reactor or of the last of the reactors (8, 9); the treated waste gases exiting from the reactor or reactors (8, 9) being first introduced into said separator (10) and subsequently conveyed, by said first uptake line (6), toward a final discharge chimney (5); said first uptake line (6) providing, downstream of said cyclone separator (10), a second recirculating line (15) moving the waste gases treated by the reactor or reactors (8, 9), upstream of the reactor or of the first of the reactors (8, 9), so that by this second line (15) said treated waste gases mix with the waste gases to be treated originating from the uptake section (1) of the incinerator
    • 用于热处理来自城市垃圾焚烧炉等的废气的设备,包括:第一生产线(6),用于在城市垃圾焚烧炉的出口部分处理热处理废气,一级或多级流化床( 包含在一个或多个反应器(8,9)内并由待处理废气投入的至少一个料斗(24,33),至少一个用于将固体颗粒材料装入反应器(8,8)的料斗(24,34) 9),在反应器出口处或反应器末端(8,9)的旋风分离器(10); 首先将从反应器或反应器(8,9)排出的经处理的废气引入所述分离器(10)中并随后通过所述第一上升管线(6)朝向最终排出烟囱(5)输送; 所述第一上升管线(6)在所述旋风分离器(10)的下游提供第二再循环管线(15),所述第二再循环管线(15)将反应器或反应器(8,9)处理的废气移动到反应器上游或第一 反应器(8,9),使得通过该第二管线(15),所述处理过的废气与来自焚化炉的上升部分(1)的待处理废气混合
    • 2. 发明公开
    • Method for the pneumatic transport of atomized slip in the ceramics industry
    • Verfahren zum pneumatischen运输atomisierterSchlämmein der Keramikindustrie
    • EP2174761A1
    • 2010-04-14
    • EP09169478.6
    • 2009-09-04
    • Saccani, Cesare
    • Saccani, Cesare
    • B28B13/02C04B33/04
    • C04B33/04
    • The problems that arise during pneumatic transport of atomized slip are on the one hand that of preventing the air stream from tending to humidify or to dry the atomized product, and on the other hand that of limiting the velocity and the velocity gradient of the solid, relative to the pipe axis, to guarantee its integrity. The solution to the problem of maintaining the humidity of the solid consists of thermal preconditioning of the atomized slip, such as to attain the inlet air condition and maintain constant steam content. At the same time, it is possible, by means of temperature control, to maintain the condition of saturated air as far as the outlet. Therefore, controlling the temperature ensures that the change in steam content in the air between inlet and outlet of the pneumatic conveyor is zero and that the air always remains saturated.
    • 在雾化滑移的气动输送过程中出现的问题一方面是防止气流倾向于加湿或干燥雾化产物,另一方面限制固体的速度和速度梯度, 相对于管轴,以保证其完整性。 保持固体湿度问题的解决方案是雾化滑动的热预处理,例如达到入口空气状态并保持恒定的蒸汽含量。 同时,通过温度控制可以将饱和空气的状况保持在出口的最远点。 因此,控制温度可确保气动输送机入口和出口之间空气中蒸汽含量的变化为零,并且空气始终保持饱和。
    • 5. 发明公开
    • Plant for the hot treatment of waste gases from municipal waste incinerators
    • Anlage zurWärmebehandlungvon Abgasen einerHausmüllVerbrennungsanlage
    • EP1410834A2
    • 2004-04-21
    • EP03022086.7
    • 2003-10-02
    • Saccani, Cesare
    • Saccani, Cesare
    • B01D53/12
    • B01D53/12
    • Plant for the hot treatment of waste gases from municipal waste incinerators or the like, comprising a first line (6) of taking up hot waste gases for treating in an exit section of a municipal waste incinerator, a one stage or multiple stage fluid bed (23, 30, 35) contained within one or several reactors (8, 9) and invested by the waste gases to be treated, at least one hopper (24, 34) for charging the solid granular material into the reactor or reactors (8, 9), a cyclone separator (10) at the outlet of the reactor or of the last of the reactors (8, 9); the treated waste gases exiting from the reactor or reactors (8, 9) being first introduced into said separator (10) and subsequently conveyed, by said first uptake line (6), toward a final discharge chimney (5); said first uptake line (6) providing, downstream of said cyclone separator (10), a second recirculating line (15) moving the waste gases treated by the reactor or reactors (8, 9), upstream of the reactor or of the first of the reactors (8, 9), so that by this second line (15) said treated waste gases mix with the waste gases to be treated originating from the uptake section (1) of the incinerator
    • 用于热处理来自城市垃圾焚烧炉等的废气的设备,包括在城市废物焚化炉的出口部分处理热废气的第一管线(6),一级或多级流化床 包含在一个或几个反应器(8,9)内并被待处理的废气投入的至少一个料斗(24,34),用于将固体颗粒材料装入反应器(8, 9),在反应器的出口或最后的反应器(8,9)的出口处的旋风分离器(10); 从反应器或反应器(8,9)排出的经处理的废气首先被引入所述分离器(10)中,随后由所述第一吸收管线(6)输送到最终排放烟囱(5)。 所述第一吸入管线(6)在所述旋风分离器(10)的下游提供第二再循环管线(15),用于将由反应器或反应器(8,9)处理的废气移动到反应器或反应器的上游 反应器(8,9),使得通过该第二管线(15),所述经处理的废气与来自焚化炉“摄影”部分(1)的待处理废气混合,