会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明公开
    • POWER GRID SYSTEM AND METHOD OF DETERMINING POWER CONSUMPTION AT ONE OR MORE BUILDING CONNECTIONS IN A POWER GRID SYSTEM
    • 确定电网系统中一个或多个建筑物连接的功率消耗的电网系统和方法
    • EP3186868A1
    • 2017-07-05
    • EP15835110.6
    • 2015-06-19
    • Sun Electric Pte Ltd.
    • PELOSO, Matthew
    • H02J3/00H02J3/38
    • G01R21/133G01R19/2513G01R21/1333G01R22/00H02J3/383Y02B10/14Y02E10/563Y02P80/11
    • Power grid system and method of determining power consumption at one or more building connections in a power grid system. The power grid system comprises a power grid comprising a mains grid portion; a plurality of building connections, each building connection comprising a first meter configured for metering power imported from the mains grid portion to the associated building and power exported from the associated building into the mains grid portion; for one or more of the building connections, at least one second meter disposed downstream from the first meter relative to the mains grid portion and configured for metering power exported to the associated building from an auxiliary generator; and a consolidation unit configured for determining power consumption at said one or more of the building connections based on readings from the associated first and second meters.
    • 电网系统和确定电网系统中一个或多个建筑物连接处的电力消耗的方法。 该电网系统包括电网,该电网包括市电电网部分; 多个建筑物连接件,每个建筑物连接件包括第一计量器,所述第一计量器被配置为测量从所述干线电网部分输入到所述关联建筑物的功率以及从所述关联建筑物输出到所述干线电网部分的功率; 对于一个或多个建筑物连接,至少一个第二计量器相对于干线电网部分设置在第一计量器的下游,并且被配置用于计量从辅助发电机输出到相关建筑物的电力; 以及合并单元,被配置用于基于来自关联的第一和第二计量表的读数来确定所述一个或多个建筑物连接处的电力消耗。