会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明公开
    • PROZESSOPTIMIERUNG FÜR EINE BANDGIEßANLAGE
    • PROZESSOPTIMIERUNGFÜREINEBANDGIEßANLAGE
    • EP3209474A1
    • 2017-08-30
    • EP15813230.8
    • 2015-10-23
    • Berndorf Band GmbH
    • MORGENBESSER, KarlPROSCHEK, Michael
    • B29C39/14B29C39/44
    • B29C41/28B29C37/0092
    • The invention relates to a strip casting system (1) comprising a driven continuous band (4), a casting device (5), at least one drying device (8a..8d, 9a..9d), and a system process computer (12) that acts at least on the at least one drying device (8a..8d, 9a..9d). In addition to the system process computer (12), a model process computer (13) is also provided, which acts on a model of the strip casting system (1) and calculates a value and/or course at least of an operating parameter (x, n, T) of the drying device (8a..8d, 9a..9d) in relation to a change of an operating state of the strip casting system (1). The calculation is carried out in parallel to, and independent of the process currently taking place on the strip casting system (1), and the result is loaded into the system process computer (12) in the event that the operating state change is required. The invention also relates to an operating method for a strip casting system (1) of this type, as well as a computer program product and a computer for the process optimisation of a strip casting system.
    • 本发明涉及包括从动连续带(4),铸造装置(5),至少一个干燥装置(8a..8d,9a..9d)和系统过程计算机(1)的带铸造系统(1) 12),其至少作用于所述至少一个干燥装置(8a..8d,9a..9d)。 除了系统过程计算机(12)之外,还提供了模型过程计算机(13),该过程计算机(13)作用于带材铸造系统(1)的模型并且计算至少一个工作参数的值和/ (8a,8d,9a ... 9d)相对于带材铸造系统(1)的运行状态的变化而变化。 该计算与当前在带材铸造系统(1)上进行的过程并行并独立地进行,并且在需要操作状态改变的情况下将结果加载到系统过程计算机(12)中。 本发明还涉及用于这种类型的带铸造系统(1)的操作方法,以及用于带铸造系统的工艺优化的计算机程序产品和计算机。