会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明公开
    • WINDING METHOD FOR STATOR, AND PERMANENT-MAGNET ELECTRIC MOTOR
    • PERMANENTMAGNET-ELEKTROMOTOR的WICKELVERFAHRENFÜREINEN定位器
    • EP2104206A4
    • 2017-04-05
    • EP07850855
    • 2007-12-19
    • TOSHIBA CARRIER CORP
    • FUTAMI TOSHIHIKO
    • H02K15/095H02K1/14H02K21/16
    • H02K15/095H02K1/146H02K3/18Y10T29/49009Y10T29/49073
    • In a stator winding method for winding conductive wires 8 around teeth 4a to 4f of a stator core 4 having 3n teeth 4a to 4f and 3n slots 5a to 5f by use of a bobbin machine 12 having three nozzles 13, the slots 5a to 5f on both sides of the teeth 4a, 4d, 4f in the n th winding process are formed, in respective slot portions on the side of the teeth 4a, 4d, 4f in the n th winding process, so that respective depths " A " are all smaller than respective depths " B " of the remaining portions. At the final stage of the n th winding process, the nozzles 13 are moved from the interior side of the slots 5a to 5f toward the inner circumferential side of the stator core 3 and furthermore, the conductive wires 8 are wound around the teeth 4b, 4d, 4f so that each gap 14 between the conductive wires 8 wound around the teeth 4b, 4d, 4f and the conductive wires 8 wound around the teeth 4a, 4c, 4e is smaller than an outer diameter of the nozzle 13.
    • 在通过使用具有三个喷嘴13的梭芯机12将导线8缠绕在具有3n个齿4a至4f和3n个槽5a至5f的定子芯4的齿4a至4f周围的定子绕组方法中,槽5a至5f在 在第n次卷绕处理中,在齿4a,4d,4f侧的各槽部形成第n次卷绕工序中的齿4a,4d,4f的两侧,使各深度“A”全部 小于其余部分的相应深度“B”。 在第n次卷绕处理的最后阶段,喷嘴13从槽5a〜5f的内侧向定子铁心3的内周侧移动,此外,导线8缠绕在齿4b上, 如图4d,4f所示,缠绕在齿4b,4d,4f上的导线8和缠绕在齿4a,4c,4e上的导线8之间的每个间隙14小于喷嘴13的外径。
    • 4. 发明公开
    • POWER CONSUMPTION AMOUNT DISPLAY DEVICE
    • VORRICHTUNG ZUR ANZEIGE EINER STROMVERBRAUCHSMENGE
    • EP2581873A4
    • 2017-01-11
    • EP11792243
    • 2011-05-13
    • TOSHIBA CARRIER CORP
    • KOIZUMI TETSUYA
    • G06Q50/00G06F1/28G06F3/048H02J3/00H02J3/14
    • H02J3/14H02J2003/143Y02B70/3225Y02B70/3266Y04S20/222Y04S20/242
    • According to one embodiment, a power consumption amount display connected to a measurement value memory for memorizing a power consumption amount measurement value of a monitor target device includes: a monitor information selecting portion for a user to select a monitor target month and a comparison target month of the power consumption amount measurement value; a measurement value obtaining portion for obtaining, from the measurement value memory, the power consumption amount measurement values corresponding to the monitor target month and the comparison target month which are selected at the monitor information selecting portion; a display information generating portion capable of generating display information by shifting a date of the comparison target month obtained at the measurement value obtaining portion, such that a day of a week of the date of the comparison target month coincides with a day of a week of a date of the monitor target month obtained at the measurement value obtaining portion, allowing the date of the comparison target month to correspond to the date of the monitor target month, and arranging and displaying per day the power consumption amount measurement values of the corresponding dates; and a display portion for displaying the display information generated at the display information generating portion.
    • 根据一个实施例,连接到用于存储监视对象装置的耗电量测量值的测量值存储器的功耗量显示器包括:用于选择监视目标月份和比较对象月份的用户的监视信息选择部分 的功耗量测量值; 测量值获取部分,用于从所述测量值存储器获取在所述监视信息选择部分处选择的与所述监视目标月份和所述比较目标月份对应的功耗量测量值; 显示信息产生部分,其能够通过移动在测量值获取部分获得的比较目标月份的日期来产生显示信息,使得比较目标月份的日期的一周的一天与一周的一天的一天相符 在测量值获取部分获得的监视目标月份的日期,允许比较目标月份的日期对应于监视目标月份的日期,并且每天布置和显示相应日期的功耗量测量值 ; 以及用于显示在显示信息生成部分生成的显示信息的显示部。