会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明公开
    • PROCESS FOR PRODUCING PLASTIC LENS, FILM POSITIONING METHOD, AND COMPOSITE MATERIAL
    • 生产塑料透镜的方法,薄膜定位方法和复合材料
    • EP3269525A1
    • 2018-01-17
    • EP16761351.2
    • 2016-01-14
    • Hopnic Laboratory Co., Ltd.Mitsui Chemicals, Inc.
    • AIISO, Yoshimitsu
    • B29C39/10B29C39/12B29C39/24B32B37/02G02B5/30G02C7/02G02C7/12B29K75/00B29L9/00B29L11/00
    • B29D11/00413B29C39/10B29C39/12B29C39/24B29D11/00442B29D11/00528B29D11/00644B29D11/0073B29K2105/20B29K2629/00B29K2667/00B29K2995/0034B32B37/02G02B5/30G02C7/02G02C7/12G02C2202/16
    • A method of manufacturing a plastic lens according to the present invention includes: a step of putting a first curable composition over a forming surface of a first mold substrate having the forming surface for forming a lens surface; a step of spreading the first curable composition over the entire forming surface by pressing the composition with a film to form a first curable composition layer and separating the film from the first mold substrate by a predetermined distance through the formed first curable composition layer; a step of covering an outer edge of the first mold substrate, an outer edge of the film, and an outer edge of a second mold substrate having a forming surface for forming the other surface of the lens with a fastening member to support them and to place the second mold substrate so as to be opposed to the film with being spaced apart from the film by a predetermined distance; a step of injecting a second curable composition into a cavity between the film and the second mold substrate; a step of curing the first curable composition layer and the injected second curable composition to form substrate layers over both sides of the film; and a step of removing the fastening member, the first mold substrate and the second mold substrate to obtain a plastic lens.
    • 根据本发明的制造塑料透镜的方法包括:将第一可固化组合物置于具有用于形成透镜表面的成形表面的第一模具基底的成形表面上的步骤; 通过用膜压制所述组合物以形成第一可固化组合物层并且通过所形成的第一可固化组合物层将所述膜与所述第一模制基板隔开预定距离而在所述整个成形表面上展开所述第一可固化组合物的步骤; 用紧固部件覆盖第一模具基板的外边缘,膜的外边缘和第二模具基板的外边缘,所述第二模具基板的外边缘具有用于形成透镜的另一表面的成形表面以支撑它们,以及 将所述第二模具基板放置成与所述膜相对,并与所述膜间隔预定的距离; 将第二可固化组合物注入所述膜和所述第二模具基底之间的空腔中的步骤; 固化所述第一可固化组合物层和所述注入的第二可固化组合物以在所述膜的两侧上形成基材层的步骤; 以及去除所述紧固构件,所述第一模具基板和所述第二模具基板以获得塑料透镜的步骤。