会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明公开
    • A STRUCTURAL MODULE FOR CONSTRUCTION OF BUILDINGS
    • 构建模块,用于建楼
    • EP2456928A2
    • 2012-05-30
    • EP10739707.7
    • 2010-07-22
    • BIOMEDY LIMITED
    • FLEMING, DenisFLEMING, John Joseph
    • E04B1/348E04H1/04E04H9/02E04H9/14
    • E04B1/161E04B1/3483
    • A structural module (1) comprising a structural floor (2), load bearing walls(3, 16), and a structural ceiling (5), arranged to support other structural modules (l)in a multi-storey building. The load-bearing walls comprise a structural frame (4) and lightweight concrete (20) between the frame members. The concrete has a density in the range of 400kg/m
      3 and 600kg/m
      3 , and is cellular, including air entrainment. The concrete is moulded between the frame members, completely filling voids between the frame members along the plane of the wall, and the structural walls are configured so that when two modules are juxtaposed there is a combined wall comprising a cavity between the structural modules. The structural walls (3) may lined on at least one side by MgO boards (21), the lightweight concrete and the boards providing at least two hours fire resistance. There may be a vertical socket (32) at a corner for engagement with a dowel pin (33) of an upper or lower adjoining module. The module may comprise a tie plate (30) configured to be secured to a plurality of other modules at a corner, the plate (30) comprising a through hole for receiving a dowel pin (33) of an adjoining module.
    • 5. 发明公开
    • Manufacture of structural panels
    • Herstellung von Bauplatten
    • EP1683617A2
    • 2006-07-26
    • EP06394002.7
    • 2006-01-20
    • BIOMEDY LIMITED
    • Fleming, John Joseph
    • B29C44/12B29C44/60B29C44/44
    • B29C44/60B29C44/1271B29C44/445
    • Structural frames (SF1, SF2 ...) are fabricated. They are placed in a mould base (2), and a boom (30) is operated to push a number of them together for optimum use of mould cavity space. A back cover (35) is driven in at 90° to the boom (30). Ducts (16) are controlled by valves (7) to selectively inject pre-expanded EPS beads so that specific parts of the frame are excluded. Integral insulation forms around the desired parts of the frame upon injection of steam through slits (15). The moulding machine is controlled by code generated (80) from intermediate, universal code generated (75) from design data, and also used to generate other control code (76-78).
    • 制造结构框架(SF1,SF2 ...)。 它们被放置在模具基座(2)中,并且操作起重臂(30)以将多个它们一起推动以最佳地使用模腔空间。 后盖(35)以90°被驱动到起重臂(30)。 管道(16)由阀门(7)控制,以选择性地注入预膨胀的EPS珠子,以排除框架的特定部分。 当通过狭缝(15)注入蒸汽时,整体绝缘体形成在框架的所需部分周围。 成型机由从中间产生的代码(80),从设计数据生成的通用代码(75)进行控制,并且还用于生成其他控制代码(76-78)。