会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 73. 发明公开
    • METHOD AND APPARATUS FOR PRODUCING A LIQUEFIED NATURAL GAS STREAM
    • VERFAHREN UND VORRICHTUNG ZUM ERZEUGEN EINESFLÜSSIGERDGASSTROMS
    • EP1819800A1
    • 2007-08-22
    • EP05816189.4
    • 2005-12-07
    • Shell Internationale Research Maatschappij B.V.
    • JAGER, Marco, Dick
    • C10G5/06F25J3/02F25J1/02
    • C10G5/06C10G2300/1025F25J3/0209F25J3/0233F25J3/0247F25J2200/02F25J2200/70F25J2200/74F25J2205/30F25J2205/50F25J2210/06F25J2210/62F25J2220/64F25J2235/60F25J2245/02F25J2260/20F25J2270/90
    • Method and apparatus producing a LNG stream, wherein before liquefaction heavier hydrocarbon components are removed from a NG stream to be liquefied, the method at least comprising the steps of: providing a vaporous feed stream (1) of natural gas; feeding the feed stream (1) into a distillation column (10); drawing a bottom stream (17) and an overhead stream (16) from the distillation column (10); and liquefying at least a part of the overhead stream (16) thereby obtaining a LNG stream; wherein the step of feeding the feed stream (1) into the distillation column (10) comprises the sub steps of: splitting the feed stream (1) into first (3a) and second (3b) substreams; feeding the first substream (3a) into the distillation column (10) via a first feed point (7a), at a pressure not lower than the feed stream pressure minus a pressure drop brought about by the said splitting of the feed stream (1); cooling the second substream (3b); and feeding the cooled second substream (7) into the distillation column (10) at a second feed point (7b) overhead of the first feed point (7a).
    • 生产LNG流的方法和装置,其中在液化之前,从NG液流中除去较重的烃组分之前,所述方法至少包括以下步骤:提供天然气的蒸汽进料流(1); 将进料流(1)进料到蒸馏塔(10)中; 从蒸馏塔(10)中抽出底部料流(17)和塔顶馏出物(16); 并液化塔顶流(16)的至少一部分,从而获得LNG流; 其中将进料流(1)进料到蒸馏塔(10)中的步骤包括以下子步骤:将进料流(1)分成第一(3a)和第二(3b)子流; 通过第一进料点(7a)将第一分流(3a)进料到蒸馏塔(10)中,压力不低于进料流压力减去所述进料流分离造成的压降( 1); 冷却第二子流(3b); 以及在所述第一进料点(7a)的塔顶的第二进料点(7b)将所述冷却的第二子流(7)进料到所述蒸馏塔(10)中。