会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 22. 发明授权
    • Method of completing a well
    • 终止钻孔的方法
    • EP2508708B1
    • 2014-07-23
    • EP12171828.2
    • 2008-10-17
    • Petrowell Limited
    • Purkis, Daniel
    • E21B43/12E21B34/16
    • E21B47/122E21B23/06E21B33/12E21B34/066E21B47/124
    • A method for completing a wellbore (1) comprises operating a) a tool (15) to alternatively open and close a throughbore (40) of the completion (4); b) a tool (13) to alternatively open and close an annulus (5) defined between the outer surface of the completion and the inner surface of the wellbore; c) a tool (11) to alternatively provide and prevent a fluid circulation route from the throughbore of the completion to the said annulus; and d) at least one signal receiver and processing tool (9) capable of decoding signals received relating to the operation of tools a) to c). The method entails running the apparatus is run into the well bore, and tool a) is operated to close the throughbore; the pressure within the fluid in the tubing is increased to pressure test the completion; tool b) is operated to close the annulus; tool c) is operated to provide a fluid circulation route from the throughbore to the annulus and circulate fluid through the production tubing and out into the annulus and back to surface; tool c) is then operated to prevent the fluid circulation route from the throughbore to the annulus such that fluid is prevented from circulating; and tool a) is operated to open the throughbore.
    • 23. 发明公开
    • Selective fracturing system
    • SELEKTIVES BRUCHSYSTEM
    • EP2636844A2
    • 2013-09-11
    • EP13157900.5
    • 2013-03-05
    • Petrowell Limited
    • Purkis, Daniel GeorgeAtkinson, Richard
    • E21B43/26
    • E21B43/26
    • A method of fracturing a formation surrounding a wellbore comprises the steps of:
      (i) providing a tubular including at least two portions, each portion comprising an annulus isolation means, a selective flow path between the interior and the exterior of the tubular and a throughbore isolation means;
      (ii) running the tubular into the wellbore;
      (iii) isolating an annulus between the exterior of the tubular and the wellbore to thereby create at least two isolated zones;
      (iv) selecting any zone to be fractured;
      (v) remotely opening the flow path in the portion of tubular corresponding to the selected zone;
      (vi) remotely isolating the throughbore of the tubular by closing the throughbore isolation means in the portion of tubular corresponding to the selected zone; and
      (vii) fracturing at least part of the formation surrounding the well.
    • 压裂围绕井眼的地层的方法包括以下步骤:(i)提供包括至少两个部分的管状物,每个部分包括环形隔离装置,在管状物的内部和外部之间的选择性流动路径和通孔 隔离手段; (ii)将管道运行到井眼中; (iii)隔离管状物和井眼的外部之间的环形空间,从而形成至少两个隔离区域; (iv)选择任何要破碎的区域; (v)在对应于所选择的区域的管状部分中远程打开流路; (vi)通过关闭对应于所选区域的管状部分中的通孔隔离装置来远程分离管状通孔; 和(vii)压裂井周围地层的至少一部分。
    • 24. 发明公开
    • Method of completing a well
    • 菲律宾祖姆·阿布申
    • EP2508708A1
    • 2012-10-10
    • EP12171828.2
    • 2008-10-17
    • Petrowell Limited
    • Purkis, Daniel
    • E21B43/12E21B34/16
    • E21B47/122E21B23/06E21B33/12E21B34/066E21B47/124
    • A method for completing a wellbore (1) comprises operating a) a tool (15) to alternatively open and close a throughbore (40) of the completion (4); b) a tool (13) to alternatively open and close an annulus (5) defined between the outer surface of the completion and the inner surface of the wellbore; c) a tool (11) to alternatively provide and prevent a fluid circulation route from the throughbore of the completion to the said annulus; and d) at least one signal receiver and processing tool (9) capable of decoding signals received relating to the operation of tools a) to c). The method entails running the apparatus is run into the well bore, and tool a) is operated to close the throughbore; the pressure within the fluid in the tubing is increased to pressure test the completion; tool b) is operated to close the annulus; tool c) is operated to provide a fluid circulation route from the throughbore to the annulus and circulate fluid through the production tubing and out into the annulus and back to surface; tool c) is then operated to prevent the fluid circulation route from the throughbore to the annulus such that fluid is prevented from circulating; and tool a) is operated to open the throughbore.
    • 完成井眼(1)的方法包括操作a)工具(15)以交替地打开和关闭完井(4)的通孔(40); b)工具(13),以交替地打开和关闭在完井的外表面和井眼的内表面之间限定的环(5); c)工具(11),用于交替地提供并防止从完井的通孔到所述环空的流体循环路线; 以及d)能够解码与工具a)至c)的操作有关的信号的至少一个信号接收器和处理工具(9)。 该方法需要运行该装置进入井眼,并且工具a)被操作以关闭通孔; 管道内流体内的压力增加到压力测试完成; 工具b)操作以闭合环空; 工具c)被操作以提供从通孔到环空的流体循环路线,并且使流体通过生产管道循环并进入环空并返回到表面; 然后操作工具c)以防止从通孔到环空的流体循环路线,使得流体被阻止循环; 和工具a)操作以打开通孔。
    • 25. 发明授权
    • METHOD OF AND APPARATUS FOR COMPLETING A WELL
    • VERFAHREN UND VORRICHTUNG ZUR FERTIGSTELLUNG EINES BOHRLOCHES
    • EP2209967B1
    • 2012-09-12
    • EP08806765.7
    • 2008-10-17
    • Petrowell Limited
    • PURKIS, Daniel
    • E21B43/12
    • E21B47/122E21B23/06E21B33/12E21B34/066E21B47/124
    • A method for completing a wellbore (1) comprises operating a) a tool (15) to alternatively open and close a throughbore (40) of the completion (4); b) a tool (13) to alternatively open and close an annulus (5) defined between the outer surface of the completion and the inner surface of the wellbore; c) a tool (11) to alternatively provide and prevent a fluid circulation route from the throughbore of the completion to the said annulus; and d) at least one signal receiver and processing tool (9) capable of decoding signals received relating to the operation of tools a) to c). The method entails running the apparatus is run into the well bore, and tool a) is operated to close the throughbore; the pressure within the fluid in the tubing is increased to pressure test the completion; tool b) is operated to close the annulus; tool c) is operated to provide a fluid circulation route from the throughbore to the annulus and circulate fluid through the production tubing and out into the annulus and back to surface; tool c) is then operated to prevent the fluid circulation route from the throughbore to the annulus such that fluid is prevented from circulating; and tool a) is operated to open the throughbore.
    • 完成井眼(1)的方法包括操作a)工具(15)以交替地打开和关闭完井(4)的通孔(40); b)工具(13),以交替地打开和关闭在完井的外表面和井眼的内表面之间限定的环(5); c)工具(11),用于交替地提供并防止从完井的通孔到所述环空的流体循环路线; 以及d)能够解码与工具a)至c)的操作有关的信号的至少一个信号接收器和处理工具(9)。 该方法需要运行该装置进入井眼,并且工具a)被操作以关闭通孔; 管道内流体内的压力增加到压力测试完成; 工具b)操作以闭合环空; 工具c)被操作以提供从通孔到环空的流体循环路线,并且使流体通过生产管道循环并进入环空并返回到表面; 然后操作工具c)以防止从通孔到环空的流体循环路线,使得流体被阻止循环; 和工具a)操作以打开通孔。
    • 27. 发明公开
    • APPARATUS AND METHOD FOR SETTING A DOWNHOLE ANCHOR AND RELATED TELESCOPIC JOINT
    • 装置及方法孔固定的调整,以及前连接
    • EP2389495A2
    • 2011-11-30
    • EP10703333.4
    • 2010-01-22
    • Petrowell Limited
    • MACLEOD, IainELRICK, AndrewREID, Stephen
    • E21B17/07E21B23/06E21B33/129
    • E21B41/00E21B17/07E21B23/01E21B23/06E21B33/129
    • A lock ring (150) for use as a one way movement restrictor between two telescopingly arranged tubulars (23, 9,16) to permit movement in one direction and prevent movement in the other direction of one tubular (23) relative to the other tubular (9, 16); the lock ring comprising: a profile having one or more formations (147) formed on the outer circumference for engagement with a suitable formation profile formed on the inner circumference of the outer telescopic tubular; and one or more teeth (149) formed on its inner circumference, the teeth (149) being adapted to dig into the outer surface of the inner telescopic member (23); such that the profile having one or more formations (147) on the outer circumference and/or the said one or more teeth (149) permits the lock ring to be pushed along the outer surface of the inner telescopic tubular (23) when pushed by the outer telescopic tubular in one direction;; and is further adapted to dig the teeth (149) into the outer surface of the inner telescopic tubular when the push in said one direction is removed or when it is pushed by the outer telescopic tubular (23) in the other direction in order to prevent the lock ring (150) from moving in the other direction relative to the inner telescopic tubular (23).
    • 对于两个可伸缩地布置的管件(23,9.16)之间的单向移动限制器一起使用的锁环(150),以允许移动在一个方向上,并且防止一个管状(23)相对的另一方向移动的其它管状 (9,16); 该锁环包括:具有形成在用于与形成在所述外伸缩管的内圆周上的合适的形成轮廓的接合外周的一个或多个结构(147)的简档; 和一个或多个齿(149)在其内周形成的,所述齿(149)为angepasst挖入内伸缩部件(23)的外表面; 上的外周和/或所述一个或多个齿(149)检测确实具有一个或多个结构(147)的简档允许锁定环能够沿内伸缩管的外表面(23)当由推推 可伸缩的外管在一个方向上;; 并且进一步angepasst在牙齿(149)戳入内伸缩管的外表面当在所述一个方向上推除去或当它是由可伸缩的外管(23)在另一个方向上,以防止推 从其它相对于内管状伸缩式(23)的方向在移动所述锁环(150)。
    • 28. 发明公开
    • IMPROVED CONTROL SYSTEM
    • VERBESSERTES STEUERUNGSSYSTEM
    • EP2334897A1
    • 2011-06-22
    • EP09785714.8
    • 2009-10-01
    • Petrowell Limited
    • PURKIS, Daniel
    • E21B41/00
    • E21B41/0085
    • A control system for use in a subterranean well comprises at least one power generation device positioned within the subterranean well, the at least one power generation device adapted to supply electrical power to at least one apparatus positioned within the subterranean well and at least one control line positioned in the subterranean well. The at least one control line connects each power generation device to surface and is adapted to supply a hydraulic pressure applied from surface to the at least one power generation device from which the at least one power generation device generates the electrical power to be supplied to the at least one apparatus.
    • 用于地下井的控制系统包括位于地下井内的至少一个发电装置,所述至少一个发电装置适于向位于地下井内的至少一个装置和至少一个控制线 位于地下井中。 所述至少一个控制线将每个发电装置连接到表面,并且适于将表面施加的液压提供给所述至少一个发电装置,所述至少一个发电装置从所述至少一个发电装置产生要供应给所述发电装置的电力 至少一个装置。
    • 29. 发明公开
    • A SWITCHING DEVICE FOR, AND A METHOD OF SWITCHING, A DOWNHOLE TOOL
    • 控制装置,用于切换孔车刀的井工具和手段
    • EP2271821A1
    • 2011-01-12
    • EP09716838.9
    • 2009-03-06
    • Petrowell Limited
    • Purkis, Daniel
    • E21B43/1185E21B33/035
    • E21B41/00E21B33/0355E21B43/1185E21B47/122G01V11/002H01H47/00Y10T307/477Y10T307/773Y10T307/977
    • The switching device comprises an electronic switch (111) embedded within a downhole tool (100) and an activator (20) for remote switching of the electronic switch (111). Theactivator (20) may be a handheld unit that is used at the surface of the wellbore by an operator or may be a wireline run unit. The activator (20) permits wireless and contactless activation of the electronic switch (111) without the need for mechanical switches which could provide a point of failure for the downhole tool (100). The electronic switch (111) comprises an electronics module and a power source such as one or more batteries (126) wherein in the active configuration, the switch (111) can allowelectrical connection between the electronics module and the power source (126) and in the inactive configuration, the switch (111) prevents electrical connection between the electronics module and the power source (126).
    • 该开关装置包括嵌入在井下工具(100)内并在活化剂(20),用于所述电子开关(111)的远程开关电子开关(111)的。 活化剂(20)可以是手持式单元没有在操作者在井筒的表面上使用,或者可以是有线运行单元。 活化剂(20)允许所述电子开关(111)的无线和非接触式激活,而不需要机械开关可能用于井下工具(100)提供一个故障点。 电子模块和电源的电子开关(111)包括:如在活动的配置一个或多个电池(126)worin,交换机(111)可以允许电子模块和所述动力源(126)之间的电连接和 在非活动结构中,开关(111)防止所述电子模块和所述功率源(126)之间的电连接。
    • 30. 发明公开
    • METHOD OF AND APPARATUS FOR COMPLETING A WELL
    • 方法和装置完成钻孔
    • EP2209967A2
    • 2010-07-28
    • EP08806765.7
    • 2008-10-17
    • Petrowell Limited
    • PURKIS, Daniel
    • E21B43/12
    • E21B47/122E21B23/06E21B33/12E21B34/066E21B47/124
    • A method for completing a wellbore (1) comprises operating a) a tool (15) to alternatively open and close a throughbore (40) of the completion (4); b) a tool (13) to alternatively open and close an annulus (5) defined between the outer surface of the completion and the inner surface of the wellbore; c) a tool (11) to alternatively provide and prevent a fluid circulation route from the throughbore of the completion to the said annulus; and d) at least one signal receiver and processing tool (9) capable of decoding signals received relating to the operation of tools a) to c). The method entails running the apparatus is run into the well bore, and tool a) is operated to close the throughbore; the pressure within the fluid in the tubing is increased to pressure test the completion; tool b) is operated to close the annulus; tool c) is operated to provide a fluid circulation route from the throughbore to the annulus and circulate fluid through the production tubing and out into the annulus and back to surface; tool c) is then operated to prevent the fluid circulation route from the throughbore to the annulus such that fluid is prevented from circulating; and tool a) is operated to open the throughbore.