会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 11. 发明公开
    • CONCRETE VARIABLE CROSS-SECTION PREFABRICATED SQUARE PILE
    • EP4026950A1
    • 2022-07-13
    • EP20860285.4
    • 2020-05-20
    • Zhou, Zhaodi
    • Zhou, Zhaodi
    • E02D5/48E02D5/30
    • A concrete variable cross-section prefabricated square pile, comprising pile bodies of large cross-section sections and small cross-section sections alternately arranged along a longitudinal direction. Lateral transition surfaces are formed between side surfaces of the large cross-section sections and adjacent small cross-section sections; at least part of the lateral transition surfaces have a front edge and/or a rear edge that are offset from a vertical direction in a lateral projection, and a vertical projection of an intersection line between the lateral transition surface and a first horizontal plane is located outside a vertical projection of an intersection line between the lateral transition surface and a second horizontal plane; the first horizontal plane is a horizontal plane located above in any two horizontal planes, and the second horizontal plane is a horizontal plane located below in any two horizontal planes; one or both side surfaces of the small cross-section section are perpendicular to the bottom surface of the small cross-section section or are laterally inclined by a set angle. According to the prefabricated pile, the phenomenon that the middle section is easy to damage can be avoided, the breakage rate of the variable cross-section prefabricated square pile is reduced, and the product quality of the variable cross-section prefabricated square pile is more stable and reliable.
    • 14. 发明公开
    • STAHLBETONSTÜTZE IN ERDAUSHEBUNGEN UND VERFAHREN ZUM BAUEN DIESER STÜTZE
    • 维多利亚公司在德国巴伐利亚州
    • EP1634999A4
    • 2006-06-28
    • EP04721401
    • 2004-03-17
    • YURKEVICH ENGINEERING BUREAU L
    • YURKEVICH PAVEL BORISOVICH
    • E02D5/44E02D5/48E04C3/34E04C5/06E02D5/38E02D5/60
    • E04C3/34E02D5/44E02D5/48E04C5/0604
    • The invention relates to building bearing reinforced concrete elements. The novelty of the method for mounting reinforced concrete column and of the design structure of the column mounted in a ground excavation lies in that said column is embodied within a non extractable timbering (2) in a one or multi-slotted ground excavation. The projection of the geometric centre of the cross section of said non-extractable timbering is superimposed with the projection of the geometric centre of the cross section on the lower part of a reinforcement cage (6). The sizes of the branches of the lower part of said reinforcement cage and the ground excavation sizes are defined according to certain dependencies. The aim of said invention is to improve the accuracy for vertical mounting a support foundation and bearing elements of a building and to make it possible to build simultaneously structure upwards and downwards below a ground level.
    • 钢筋混凝土柱包含加固保持架和嵌入式混凝土制成的整体,并包括上部轴承和下部基础部件。 柱的构造方法包括制造具有插入件的柱加固保持架的操作,将混凝土放置在单个或多个狭缝凹坑中的不可移除的壳体中的单个或多个狭缝凹坑中,并将塔制成单片。 柱加强笼垂直装入坑中,垂直居中,上部由水平位移固定,柱的下基部和不可拆卸外壳的内部与封闭式外壳位于上部 柱子的轴承部分是从下到上由混凝土制成的。 整体制作后,土体基座通过放置在加强笼内部的工艺管道进行加宽和粘结; 不可拆卸外壳和上轴承部分的凹坑壁之间的空间填充有颗粒材料。