会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 11. 发明公开
    • Electric load controlling device
    • Steuergerätfürelektrische最后。
    • EP0571889A2
    • 1993-12-01
    • EP93108173.1
    • 1993-05-19
    • ALCATEL STANDARD ELECTRICA, S.A.
    • Alfonso Ronda, Jose AntonioCid Vila, Ismael
    • H02J3/14G01R21/00G01R21/133
    • H02J3/14G01R21/1333H02J13/0086H02J2003/146Y02B70/3225Y04S20/222Y04S20/224
    • It permits optimisation of power consumption for different electricity rates, as well as the updating of the latter automatically.
      It incorporates a rate module (1) which holds the time scheduling tables and the calendar defining the different electricity rates, which is connected to a decision module (5) which, in turn, is connected to a clock module (2) that holds the current time and date.
      It includes a communications module (3) which serves to receive the information sent by a remote centre over a communications line (8), and which is connected to the clock module (2), to the rate module (1) and to the decision module (5).
      The decision module (5) is also connected to a driver module (6) that is connected to a set of driver elements (A1, A2,...,An) each of which, in turn, is connected to a corresponding contactor (C1, C2,..., Cn) in order to connect or disconnect the corresponding section of the electrical installation (I1, I2,...,In) from the data obtained from the clock module (2), from the rates table and from pre-established decision criteria.
      The decision module (5) is connected to a display module (7) and to a keyboard module (4) in order to be able to program manually and display the various data introduced.
    • 它可以优化不同电费的功耗,以及自动更新。 它包含速率模块(1),其保存时间调度表和定义不同电费率的日历,其连接到决定模块(5),所述决定模块(5)又连接到时钟模块(2),所述时钟模块(2) 当前时间和日期。 其包括通信模块(3),其用于通过通信线路(8)接收由远程中心发送的信息,并且其连接到时钟模块(2)到速率模块(1)和决定 模块(5)。 决定模块(5)还连接到驱动器模块(6),驱动器模块(6)连接到一组驱动元件(A1,A2,...,An),驱动器元件又连接到相应的接触器 C1,C2,...,Cn),以从电子装置(I1,I2,...,In)的相应部分与从时钟模块(2)获得的数据相连接或断开 并根据既定的决策标准。 决定模块(5)连接到显示模块(7)和键盘模块(4),以便能够手动编程并显示所引入的各种数据。
    • 16. 发明公开
    • POWER GRID SYSTEM AND METHOD OF DETERMINING POWER CONSUMPTION AT ONE OR MORE BUILDING CONNECTIONS IN A POWER GRID SYSTEM
    • 确定电网系统中一个或多个建筑物连接的功率消耗的电网系统和方法
    • EP3186868A1
    • 2017-07-05
    • EP15835110.6
    • 2015-06-19
    • Sun Electric Pte Ltd.
    • PELOSO, Matthew
    • H02J3/00H02J3/38
    • G01R21/133G01R19/2513G01R21/1333G01R22/00H02J3/383Y02B10/14Y02E10/563Y02P80/11
    • Power grid system and method of determining power consumption at one or more building connections in a power grid system. The power grid system comprises a power grid comprising a mains grid portion; a plurality of building connections, each building connection comprising a first meter configured for metering power imported from the mains grid portion to the associated building and power exported from the associated building into the mains grid portion; for one or more of the building connections, at least one second meter disposed downstream from the first meter relative to the mains grid portion and configured for metering power exported to the associated building from an auxiliary generator; and a consolidation unit configured for determining power consumption at said one or more of the building connections based on readings from the associated first and second meters.
    • 电网系统和确定电网系统中一个或多个建筑物连接处的电力消耗的方法。 该电网系统包括电网,该电网包括市电电网部分; 多个建筑物连接件,每个建筑物连接件包括第一计量器,所述第一计量器被配置为测量从所述干线电网部分输入到所述关联建筑物的功率以及从所述关联建筑物输出到所述干线电网部分的功率; 对于一个或多个建筑物连接,至少一个第二计量器相对于干线电网部分设置在第一计量器的下游,并且被配置用于计量从辅助发电机输出到相关建筑物的电力; 以及合并单元,被配置用于基于来自关联的第一和第二计量表的读数来确定所述一个或多个建筑物连接处的电力消耗。