会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 94. 发明公开
    • ASSEMBLY AND METHOD FOR LIFTING LOADS
    • ANORDNUNG UND VERFAHREN ZUM HEBEN VON LASTEN
    • EP3019433A1
    • 2016-05-18
    • EP13736533.4
    • 2013-07-08
    • VSL International AG
    • HAYNES, ScottRUSSELL, GuyALMEIDA, RomaoHAUK, Thorsten
    • B66C23/18F03D1/00B66C1/10
    • B66C1/108F03D13/10Y02E10/72
    • The present invention relates to an assembly (20) for lifting a load element (11, 12, 1A, 1B, 15) from a base region of a construction (1), in particular a tower of a wind turbine, to another region of the construction (1), and/or for lowering the load element (11, 12, 1A, 1B, 15) from said other region of the construction (1) to the base region of the construction (1), the assembly comprising: a platform element (20A) for supporting the load element (11, 12, A, 1B, 15); lifting means for lifting the platform element (20A) from the base region of the construction (1) to said other region of the construction (1) and/or for lowering the platform element (20A) from said other region of the 10 construction (1) to the base region of the construction (1); and a shifting element (27) arranged to be able to change its position with respect to the platform element (20A) in order to move the load element (11, 12, 1A, 1B, 15) in said other region of the construction (1) from a load lifting position on the platform element (20A) to a load installation position on the construction (1), wherein the lifting means are supported by an anchoring assembly (2) able to be secured in the top region of the construction (1) and in that, in the load installation position, the platform element (20A) is disposed at least partly below the top of the construction (1). At the same time, the present invention also relates to a corresponding lifting and/or lowering method.
    • 本发明涉及一种用于将负载元件(11,12,2A,1B,15)从建筑物(1)的基部区域特别是风力涡轮机的塔架提升到另一区域的组件(20) 所述结构(1)和/或用于将所述结构(1)的所述其它区域的所述负载元件(11,12,2A,1B,15)降低到所述结构(1)的基部区域,所述组件包括: 用于支撑所述负载元件(11,12,A,1B,15)的平台元件(20A); 用于将平台元件(20A)从结构(1)的基部区域提升到结构(1)的其他区域和/或用于将平台元件(20A)从所述10构造的其它区域(... 1)到建筑物的基础区域(1); 以及移动元件(27),其布置成能够相对于所述平台元件(20A)改变其位置,以便移动所述结构的所述另一区域中的所述负载元件(11,12,2A,1B,15) 1)从平台元件(20A)上的负载提升位置到结构(1)上的负载设置位置,其中提升装置由能够固定在结构的顶部区域中的锚定组件(2)支撑, (1),并且在负载安装位置中,平台元件(20A)至少部分地设置在结构(1)的顶部的下方。 同时,本发明还涉及相应的提升和/或降低方法。
    • 95. 发明公开
    • RETAINING WALL
    • STÜTZWAND
    • EP2850251A1
    • 2015-03-25
    • EP12723423.5
    • 2012-05-14
    • VSL International AG
    • KUSUMA, SuryaSCHWARZ, Andreas
    • E02D29/02
    • E02D29/0233B28B7/04B28B7/16E02D29/02E02D29/0266E04G15/068
    • Void former assembly for casting facing elements (1) for reinforced earth. Anchoring recesses (2) are cast into its rear face (5) so that earth- reinforcing strips can be looped through. The anchoring recesses (2) are each formed as a loop channel (10) having a convex inner surface and a concave outer surface, at least one of which has a radius of curvature which increases from the deepest part of the recess (2) towards the rear face (5). A removable void former assembly and method for casting such facing elements (1) are also described. Because of the varying radius of curvature of the surfaces of the channel, and the rotational and translational withdrawal path of the void formers, the channel (10) can be cast deeper, and with openings (3, 4) which are closer together, than has hitherto been possible using removable void formers.
    • 用于铸造用于加固地球的元件的空隙前组件。 锚固凹槽被浇注到其后表面,使得土体加固条可以环绕。 锚固凹槽各自形成为具有凸形内表面和凹形外表面的环形通道,其中至少一个具有从凹部的最深部分向后表面增加的曲率半径。 还描述了用于铸造这种面向元件的可移除的空隙成形器组件和方法。 由于通道表面的曲率半径以及空心成形器的旋转和平移退出路径,通道可以被铸造得更深,并且与更靠近在一起的开口比迄今为止可能使用可移除的空心成形器 。
    • 98. 发明公开
    • SEALING ARRANGEMENT
    • 密封安排
    • EP2550400A1
    • 2013-01-30
    • EP10710851.6
    • 2010-03-26
    • VSL International AG
    • COLLIN DELAVAUD, ThibaultANNAN, Rachid
    • E01D19/14E04C5/12
    • The present invention relates to a sealing arrangement (202) for a building element comprising tension members. The sealing arrangement (202) is arranged to seal off an internal part of the building element. The sealing arrangement (202) comprises: (a) a first pressing element (500) of rigid material; (b) a transition pad (501) of deformable material; (c) a sealing pad (503) of elastic material; and (d) a second pressing element (505; 507) comprising a rigid layer (507) for pressing the transition pad (501) and the sealing pad (503) against the first pressing element (500). The transition pad (501), the sealing pad (503) and the second pressing element (505; 507) are provided with holes for the tension elements to pass through. When operationally in place, the first pressing element (500), the transition pad (501), the sealing pad (503) and the second pressing element (505; 507) are pressed together.
    • 本发明涉及一种用于包括张紧构件的建筑构件的密封装置(202)。 密封装置(202)被布置成密封建筑元件的内部部分。 密封装置(202)包括:(a)刚性材料的第一压制元件(500); (b)可变形材料的转换垫(501); (c)弹性材料的密封垫(503); (d)包括用于将所述过渡垫(501)和所述密封垫(503)压靠在所述第一按压元件(500)上的刚性层(507)的第二按压元件(505; 507)。 过渡垫(501),密封垫(503)和第二按压元件(505; 507)设有供张力元件穿过的孔。 当操作就位时,第一按压元件(500),过渡垫(501),密封垫(503)和第二按压元件(505; 507)被压在一起。