会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明公开
    • Nuclear reactor reload licensing analysis system and method
    • 分析系统和Verfahrenfürdie Aufladungslizenzierung von Kernreaktoren
    • EP1699058A2
    • 2006-09-06
    • EP05257960.4
    • 2005-12-22
    • Global Nuclear Fuel-Americas, LLC
    • Horton, Charles E.Fawks Jr., James E.Tarrer, Carter CouserGalloway, Gary D.
    • G21C7/36G21C17/00G21D3/00
    • G21D3/001G21C7/36G21C17/00G21D2003/002Y02E30/39
    • A system for automatically performing reload licensing analysis of a nuclear reactor. The system including a processor, at least one memory storing at least one database, and a software program. The software program includes an input data collection module (104), an input data verification module (117), a plurality of nuclear reactor analysis modules (118), a process module (114), and a reload licensing report generation module (130). The input data collection module (104) is adapted for receiving input data (106), (108), and (110). The input data collection module (104) with a user data interface sub-module is adapted for receiving user input (106) and a system data collection sub-module adapted for collecting data from one or more data sources (108) and (110). The input data verification module (117) is adapted for comparing the received input data to predefined input verification data. The process module (114) is adapted for processing each of the nuclear reactor analysis modules (118) and generating module output data. The process module (114) includes a process ordering sub-module (116) adapted for initiating automatic processing of each reactor analysis module (118). The reload licensing report generation module (130) generates a supplemental reload licensing report (132) as a function of module output data from at least one of the nuclear reactor analysis modules (118).
    • 一种用于自动执行核反应堆重新加载许可证分析的系统。 该系统包括处理器,至少一个存储至少一个数据库的存储器和软件程序。 软件程序包括输入数据采集模块(104),输入数据验证模块(117),多个核反应堆分析模块(118),处理模块(114)和重新载入许可报告生成模块(130) 。 输入数据收集模块(104)适于接收输入数据(106),(108)和(110)。 具有用户数据接口子模块的输入数据采集模块(104)适于接收用户输入(106)和适于从一个或多个数据源(108)和(110)收集数据的系统数据收集子模块, 。 输入数据验证模块(117)适于将接收到的输入数据与预定义的输入验证数据进行比较。 处理模块(114)适于处理每个核反应堆分析模块(118)并产生模块输出数据。 过程模块(114)包括适于启动每个反应堆分析模块(118)的自动处理的过程排序子模块(116)。 重新加载许可报告生成模块(130)根据核反应堆分析模块(118)中的至少一个生成作为模块输出数据的函数的补充重新许可报告(132)。
    • 8. 发明公开
    • METHOD OF SYNTHESIZING AXIAL POWER DISTRIBUTIONS OF NUCLEAR REACTOR CORE USING NEURAL NETWORK CIRCUIT AND IN-CORE PROTECTION SYSTEM (ICOPS) USING THE SAME
    • 工艺对于使用神经网络连接,并且核心保护系统(ICOPS)核反应堆的核心性能轴向分布的制备SO
    • EP3035339A1
    • 2016-06-22
    • EP15182971.0
    • 2015-08-28
    • Kepco Nuclear Fuel Co., Ltd
    • Park, Young HoKim, Young BaekKim, Dong SooOh, Do Young
    • G21D3/00G06N3/02
    • G21C17/06G06G7/54G06N3/088G21D3/00G21D3/10G21D2003/002Y02E30/39
    • There are provided a method of synthesizing axial power distributions of a nuclear reactor core using a neural network circuit and an in-core protection system (ICOPS) using the same, in which using the neural network circuit including an input layer, an output layer, and at least one hidden layer, each layer being configured with at least one node, each node of one layer being connected to nodes of the other layers, node-to-node connections being made with connection weights varied based on a learning result, optimum connection weights between the respective nodes constituting the neural network circuit are determined through learning based on various core design data applied to the design of a nuclear reactor core of a nuclear power plant, and axial power distributions of the nuclear reactor core are synthesized based on ex-core flux detector signals measured by ex-core neutron flux detectors during operation of a nuclear reactor, so that the initial time required to perform a start-up test of the nuclear reactor can be reduced since basic data for synthesizing axial power distributions need not be separately measured in the start-up test of the nuclear reactor contrary to a conventional ICOPS, thereby improving the economic efficiency of the nuclear power plant, and so that overall nuclear reactor core design data can be used rather than actual measurement data in the start-up test (i.e., at the beginning of a period of nuclear fuel), thereby more accurately replicating axial power distributions of the nuclear reactor core throughout the overall period of the nuclear fuel.
    • 本发明提供使用利用相同的,其中,使用神经网络电路包括输入层到输出层中的神经网络电路和在芯保护系统(ICOPS)合成核反应堆堆芯的轴向功率分布的方法, 和至少一个隐藏层,每个层被配置与至少一个节点,被连接到其它层的节点的一个层的每一个节点,节点到节点的连接被用连接权重作出向变基于学习结果,最佳 构成神经网络电路的respectivement节点之间的连接权重被确定的被合成基于前通过基于施加到核电厂的核反应堆堆芯的设计各种核心的设计数据,和核反应堆堆芯的轴向输出分布的学习采 -core核反应堆的外科手术过程中通过外中子通量检测器测得的通量检测器信号,所以没有执行开始 - 所需的初始时间 了核反应堆的测试可自基本数据来减少对合成轴向功率分布不需要在核反应堆相反常规ICOPS的启动测试单独测量,从而提高了核电厂的经济效率,以及 所以没有整体核反应堆芯的设计数据,可以使用,而不是在启动测试实际测量数据(即,在一个周期的核燃料的开始),从而更精确地设定复制整个核反应堆堆芯的轴向输出分布 核燃料的整个周期。