会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明公开
    • APPARATUS FOR FEEDING RAW MATERIAL BARS TO A MELTING FURNANCE
    • VORRICHTUNG ZURZUFÜHRUNGVON ROHMATERIALSTANGEN ZU EINEM SCHMELZOFEN
    • EP3098552A1
    • 2016-11-30
    • EP15194515.1
    • 2015-11-13
    • Yu, Chai-Long
    • Yu, Chai-Long
    • F27D3/00F27D3/04
    • F27D3/08F27D3/0025F27D3/0033F27D3/04F27D2003/0012F27D2003/0014F27D2003/0015
    • An apparatus feeds raw material bars (40) to a furnace body (411) of a melting furnace (4), and includes an enclosure body (5) provided with a vertical feed passage (501) to be disposed above an open top side of the furnace body (411). A feeding unit (8) includes a push mechanism (81) extending into an upper part of the feed passage (501), and a material retarder (84) extending into a lower part of the feed passage (501). A transferring unit (7) transfers a raw material bar (40) to the feed passage (501) in a manner that the raw material bar (40) extends vertically in the feed passage (501). The push mechanism (81) pushes the raw material bar (40) in the feed passage (501) downwardly, and the material retarder (84) retards downward movement of the raw material bar (40) out of the feed passage (501) and into the furnace body (411).
    • 一种装置将原料棒(40)送入熔化炉(4)的炉体(411),并且包括设置有垂直进料通道(501)的外壳主体(5),该垂直进料通道设置在 炉体(411)。 进料单元(8)包括延伸进入通道(501)的上部的推动机构(81)和延伸进入通道(501)的下部的材料延迟器(84)。 转印单元(7)以原料棒(40)在进料通道(501)中垂直延伸的方式将原料棒(40)转移到进料通道(501)。 推动机构(81)将进料通道(501)中的原料棒(40)向下推动,材料缓凝剂(84)阻止原料棒(40)向下移动进料通道(501),并且 进入炉体(411)。
    • 3. 发明公开
    • METHOD OF PRODUCING HEATED PRODUCTS IN MULTI-PRODUCT MIXED FLOW SYSTEM
    • VERFAHREN ZUM HERSTELLEN BEHEIZTER VERSCHIEDENER PRODUKTE IN EINEM GEMISCHTEN FLUSSSYSTEM。
    • EP0543016A1
    • 1993-05-26
    • EP92910768.8
    • 1992-05-27
    • SUMITOMO ELECTRIC INDUSTRIES, LTD.
    • TAKEUCHI, Kenji, Itami Works of Sumitomo
    • F27D3/12B22F3/10B65G47/48B65G47/68F27D3/00
    • F27D3/00B65G37/02F27D5/00F27D2003/0012F27D2003/006F27D2003/0068F27D2003/0069F27D2003/008F27D2003/124
    • It becomes possible to produce products requiring heat treatment by use of heating facilities fewer than the pre-process facilities plus the post-process facilities, in a state of mixed flow of multiple products, economically, highly efficiently and without misclassification. The preprocess facilities (molding presses 4₋₁ - 4₋₃) and the post-process facilities (sizing presses 6₋₁, 6₋₂ and other finishing facilities 7) are provided before and after a sintering furnace (5). Furthermore, there are provided conveying device including a conveyor 8₋₂ for conveying, a return conveyor 8₋₂, unloading devices 11₋₁ - 11₋₁ - 14₋₃. Further, there are provided a first moving device (12) between the inlet portion of the furnace and the conveyor 8₋₁, and a second moving device (13) between the outlet portion of the furnace and the conveyor 8₋₂, respectively, and products (works) contained in heat-resistant trays which are housed in a conveying case are supplied to the sintering furnace, with products (works) contained in each of the heat-resistant trays being unloaded from the case by means of the conveying device (12). Furthermore, the vacant case is returned to the conveyor 8₋₁ for separate conveying, and the heat-resistant trays after the heat treatment are returned to the original case by means of the moving device (13) and conveyed toward the post-process facilities by means of the conveyor 8₋₃.
    • 在多种产品的混合流动状态下,通过使用比预处理设备加上后处理设备更少的加热设备,可以经济地,高效率地生产需要热处理的产品,并且没有错误分类。 在烧结炉(5)之前和之后提供预处理设备(成型机4-1-4-3)和后处理设备(上浆机6-1,6-2和其它整理设备7)。 此外,还提供了一种输送装置,包括用于输送的输送机8-2,返回输送机8-2,卸载装置11-1-11-1-14-3。此外,还提供了第一移动装置(12),其位于 炉子的入口部分和输送机8-1以及位于炉子的出口部分和输送机8-2之间的第二移动装置(13)以及包含在耐热托盘中的产品(工件) 容纳在输送箱内的各个耐热托盘中的产品(工件)通过输送装置(12)从壳体卸载到烧结炉中。 此外,将空箱返回到输送机8-1以进行单独输送,并且热处理后的耐热托盘通过移动装置(13)返回到原始壳体并被输送到后处理设备 通过输送机8-3。
    • 7. 发明公开
    • Vorrichtung zum Be- und Entladen von einen Brennofen für Keramikteile auf einer Umlaufbahn durchlaufenden Ofenwagen
    • 装置用于通过在轨道窑车陶瓷份窑装载和卸载。
    • EP0234266A2
    • 1987-09-02
    • EP87100755.5
    • 1987-01-21
    • Hans Lingl Anlagenbau und Verfahrenstechnik GmbH & Co. KG
    • Lingl, HansKastler, GerhardSimon, Helmut
    • F27B9/38F27B9/26F27B9/14F27D3/00F27D3/12
    • F27D3/0021F27D3/06F27D3/123F27D2003/0012F27D2003/006F27D2003/0063F27D2003/0065F27D2003/0068F27D2003/008
    • Bei der Vorrichtung zum Be- oder Entladen von einen Brennofen für Keramikteile auf einer Umlaufbahn (1) durchlaufenden Ofenwagen, auf denen die Keramikteile auf Unterlagen, insbesondere in Kassetten (4), anzuordnen oder angeordnet sind, mit einer Stapel- und Entstapelvorrich­tung (9) für die Unterlagen bzw. Kassetten (4), mit einer seitlich neben der Umlaufbahn angeordneten Befüll- oder Entleerungsvorrichtung (11,12) für die Unterlagen bzw. Kassetten (4), und mit einer Fördereinrichtung, die sich zur Befüll- oder Entleerungsvorrichtung (11, 12) hin erstreckt, ist die Fördereinrichtung durch einen Förderer (10) gebildet, der für die Förderung der Kassetten von der Umlaufbahn (1) zur Befüll- oder Entleerungsvorrichtung (11,12) und von der Befüll- oder Entleerungsvorrichtung (11,12) zur Umlaufbahn (1) eingerichtet ist. Dem Förderer ist ein seiner Höhe ange­paßter Träger (16) mit zwei Stellplätzen /17,18) für Unter­lagen bzw. Kassetten zugeordnet, die durch Verschiebung des Trägers (16) in Flucht mit dem Förderer (10) bringbar sind.
    • 1.设备用于窑车的装卸,在圆形路径上通过对陶瓷制品,在其上的陶瓷制品是被布置或在载体上被布置的烧成窑炉在盒运行,在particulare,具有 设备,用于交错和destaggering,分别延伸过圆形路径的宽度,对于支持物,。 盒,所有这是沿着圆形路径和下行驶的窑车分别是可移动的,用于与支撑件的加载和卸载的装置,。 盒,旁布置,圆形路径,并与一个输送装置,所有这一切都在窑车上面配置的,且延伸到所述装载和卸载装置,通过DASS特点模具输送装置由一输送机(10)所有的,其被设计为将所形成的 从到装载和卸载装置(11,12)的环形路径(1)的盒的输送和从装载和卸载装置(11,12)到所述圆形路径(1),并没有在输送机(10)是 邻近尾盘反弹至持有,angepasst其HIGHT和扩展APPR。 在宽度(b)该圆形路径(1),其具有用于与至少两个空间(17,18)海誓山盟后面的圆形路径的在所述圆形的纵向方向上的纵向方向的输送装置(26) 路径(1),用于支撑,分别。 盒,并且做了保持器(16)处于所述空间之间的圆形路径(1),其中,所述空间(17,18)中的一个处于与输送机对准长度方向移动。