    • 3. 发明专利
    • Lining construction method for tunnel and form device
    • 隧道施工方法
    • JP2007291791A
    • 2007-11-08
    • JP2006122963
    • 2006-04-27
    • Daio Kensetsu KkGifu Kogyo Co LtdKumagai Gumi Co Ltd大旺建設株式会社岐阜工業株式会社株式会社熊谷組
    • MIZOTE KAZUNORIONO MINORUSAKA HIDEMASAWATASE MASAOMINISHIMURA MASAONISHIMURA TAKESHIHIRATA MASAHIROYOKOYAMA KATSUHIKONAKANO SHINYAINAGAWA YUKIHISAIWATA KOJISHIMABE MITSUTO
    • E21D11/10
    • PROBLEM TO BE SOLVED: To provide a lining construction method for preventing a trace formed after pulling out a pipe from being left and to provide a form device used in this method. SOLUTION: This form device is provided with a form 18 being a form for forming a concrete placing space 17 between a wall face 16 of the tunnel and it, having a top part, and provided with a supply port for concrete to be placed in the concrete placing space, at least one pipe 42 arranged in the vicinity of an end part of the form, attached to the top part of the form upward, and elevating and lowering along its axial line, and at least one vibrator 44 attached to the form, being close to the pipe, and elevating and lowering along its axial line. Next, while concrete is placed in the concrete placing space 17 or before placing concrete, the pipe 42 is lifted until it is abutted on the wall face of the tunnel or comes close to it and is lowered after concrete reaches a top part of the wall face of the tunnel to operate the vibrator 44 while the pipe lowers. COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种用于防止在拉出管道之后形成的迹线的衬里施工方法,并提供在该方法中使用的成形装置。 解决方案:该成形装置具有一个形式18,该形式用于在隧道的壁面16之间形成混凝土放置空间17,该混凝土放置空间17具有顶部,并且具有用于混凝土的供应口 放置在混凝土放置空间中的至少一个管42,其布置在形式的端部附近,沿着其轴线向上附接到形式的顶部,并且沿着其轴线升降;以及至少一个振动器44附接 靠近管道的形式,沿其轴线升降。 接下来,当混凝土被放置在混凝土浇筑空间17中或者在混凝土浇筑之前,管42被提升直到其与隧道的壁面相接触或者接近它并且在混凝土到达壁的顶部之后降低 隧道的表面在管道下降时操作振动器44。 版权所有(C)2008,JPO&INPIT