会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明公开
    • 전력설비 작업 관리용 단말 장치
    • 电力设备管理终端单元
    • KR1020100109749A
    • 2010-10-11
    • KR1020090028163
    • 2009-04-01
    • 실리기업 주식회사한국전력공사
    • 이상헌전갑열박민호이기운박영성한붕전이원호
    • G06Q50/10G06Q50/06
    • G06Q50/10G06Q50/06
    • PURPOSE: A terminal device for managing a work about electric power equipment is provided to supply a detailed work history of corresponding electric power equipment. CONSTITUTION: A work management providing module(130) generates work list information based on state information and basic data. The work management providing module inputs, inquires, modifies, and deletes the work list information. The work management providing module provides the work history information including a picture, a development map, and cable history information. A code management providing module(140) provides check card information in which a check list content of electric power equipment, a work target, is coded. The code management providing module inputs, inquires, modifies, and deletes the check card information.
    • 目的:提供用于管理电力设备工作的终端设备,以提供相应电力设备的详细工作历史。 构成:工作管理提供模块(130)基于状态信息和基本数据生成工作列表信息。 工作管理提供模块输入,查询,修改和删除工作列表信息。 工作管理提供模块提供包括图片,开发地图和电缆历史信息的工作历史信息。 代码管理提供模块(140)提供检查卡信息,其中对电力设备的检查列表内容,工作目标进行编码。 代码管理提供模块输入,查询,修改和删除检查卡信息。
    • 3. 发明申请
    • 에프에스브이알과 지엘알티를 이용한 발전소 계측기 성능감시 방법 및 시스템
    • 使用FFVR和GLRT监测植物仪器性能的方法和系统
    • WO2012050262A1
    • 2012-04-19
    • PCT/KR2010/008308
    • 2010-11-24
    • 한국전력공사서인용하복남이성우신창훈박민호
    • 서인용하복남이성우신창훈박민호
    • G21D3/04G05B23/02G05B19/406
    • G05B23/0221G06K9/6269G06K9/6273G06K9/6284G21D3/00G21D3/001Y02E30/39
    • 본 발명의 FSVR과 GLRT를 이용한 발전소 계측기 성능감시 방법은, 전체의 데이터 셋(X)을 행렬의 형태로 표시하고, 훈련용(Xtr), 최적화용(Xopt), 시험용(Xts)으로 삼분하는 제1단계와; 상기 제1단계에서 행렬 형태로 표시된 전체의 데이터를 정규화하는 제2단계; 상기 제2단계에서 정규화된 데이터 셋(Z)을 훈련용(Ztr), 최적화용(Zopt), 시험용(Zts)으로 삼분하는 제3단계; 상기 제3단계에서 정규화되어 삼분된 훈련용(Ztr), 최적화용(Zopt), 시험용(Zts)의 각 데이터 셋(Z)의 주성분을 추출하는 제4단계; 데이터 셋과 주성분을 원하는 개수 만큼의 데이터 군집으로 나누는 제5단계; 각 FSVR 모델의 최적 상수 (ε 1 ,C 1 ,σ 1 ) 및 (ε 2 ,C 2 ,σ 2 )를 구하는 제6단계; 퍼지 멤버쉽 그레이드(μ 1 ,μ 2 )를 계산하는 제7단계; 출력 예측치(Zts1_hat과 Zts2_hat)를 구하는 제8단계; 전체의 데이터에 대한 예측치(Zts_hat)를 구하는 제9단계; 시험용 데이터에 대한 예측치를 시간순으로 분류하는 제10단계; 원래 스케일의 각 센서에 대한 예측치를 구하는 제11단계 및; 센서의 드리프트를 판별하는 제12단계를 갖추어 이루어진 것을 특징으로 한다.
    • 本发明涉及一种使用FSVR和GLRT监测工厂仪表的性能的方法,包括:将整个数据集(X)表示为矩阵并将数据​​集分为三个训练数据子集(Xtr)的第一步骤, ,优化(Xopt)和测试(Xts); 在第一步骤中归一化表示为矩阵的所有数据的第二步骤; 将归一化数据集(Z)分类为三个训练数据子集(Ztr),优化(Zopt)和测试(Zts)的第三步骤; 从用于训练的数据子集(Z)(Ztr),优化(Zopt)和测试(Zts)中提取主要组件的第四步骤; 将数据组和主要组件划分成数据组的所需数量的第五步骤; 计算每个FSVR模型的最优系数(e1,C1,s1)和(e2,C2,s2)的第六步骤; 计算模糊成员等级(μ1,μ2)的第七步; 计算输出预测值(Zts1_hat和Zts2_hat)的第八步骤; 计算所有数据(Zts_hat)的预测值的第九步骤; 对测试数据的预测值进行分类的第十步骤; 以原始尺度计算传感器的预测值的第十一步骤; 以及确定传感器漂移的第十二步骤。
    • 4. 发明授权
    • 분산전원이 연계된 전력계통의 전압/무효전력 제어 시스템 및 이를 위한 방법
    • 用于分配电源连接的电力系统中的电压和电力系统及其相关方法
    • KR101132107B1
    • 2012-04-05
    • KR1020100094267
    • 2010-09-29
    • 한국전력공사
    • 이성우하복남서인용장문종박민호이정철
    • H02J3/16H02J3/38G05F1/70
    • PURPOSE: A voltage/reactive power control system of an electric power system and a method for the same are provided to enhance accuracy of voltage control by accurately producing voltage size. CONSTITUTION: A voltage output part(710) produces the voltage of a node by using at least one among voltage, current, and power factor of an adjacent node. A control variable output part(720) produces a value of a control variable by using an objective function including one or more control variables in order to control the produced voltage. A controller(730) controls distributed power according to the value of the control variable with the other control device. The distributed power is composed of at least one among wind power generation, solar power generation, and a fuel battery.
    • 目的:提供电力系统的电压/无功功率控制系统及其方法,以通过精确地产生电压大小来提高电压控制的精度。 构成:电压输出部(710)通过使用相邻节点的电压,电流和功率因数中的至少一个来产生节点的电压。 控制变量输出部分(720)通过使用包括一个或多个控制变量的目标函数来产生控制变量的值,以便控制所产生的电压。 控制器(730)根据控制变量的值与另一个控制装置控制分配的功率。 分布式电力由风力发电,太阳能发电和燃料电池中的至少一个组成。
    • 5. 发明公开
    • 배전 자동화 시스템 및 그의 보안 알고리즘 적용방법
    • 分布式自动化系统及其使用安全算法的方法
    • KR1020100034306A
    • 2010-04-01
    • KR1020080093362
    • 2008-09-23
    • 한국전력공사
    • 이성우하복남신창훈박민호박소영
    • H02J3/00H04L9/08
    • H02J3/00H04L9/0861Y02E40/10Y02E60/724Y02E60/7853
    • PURPOSE: A distribution automation system and a security algorithm application method thereof are provided to safely protect a distribution system from a cyber attack by executing an authentication operation before decoding data packet. CONSTITUTION: A distribution automation system comprises a distribution automation server(10) and a terminal(20). A distribution automation server is connected to a power distribution communications network(N1,N2) through a communications modem. A receiving node transmits a control message to a receiving node after appending authentication data to a control message. The receiving node decides whether data packet received from the transmission node is valid. The receiving node deciphers the control message included in the data packet when the data packet received from the transmission node is valid.
    • 目的:提供一种配电自动化系统及其安全算法应用方法,通过在解码数据包之前执行认证操作来安全地保护配电系统免受网络攻击。 规定:配电自动化系统包括配电自动化服务器(10)和终端(20)。 配电自动化服务器通过通信调制解调器连接到配电通信网络(N1,N2)。 接收节点在将认证数据附加到控制消息之后向接收节点发送控制消息。 接收节点决定从传输节点接收的数据分组是否有效。 当从传输节点接收的数据分组有效时,接收节点解密包含在数据分组中的控制消息。
    • 7. 发明授权
    • 배전선로의 고장복구를 지원하는 배전 자동화 서버 및 그 방법
    • 自动分配服务器,用于支持分发线错误恢复和自动分配方法
    • KR101132015B1
    • 2012-04-02
    • KR1020100094822
    • 2010-09-29
    • 한국전력공사
    • 신창훈이정철박민호서인용하복남윤종희안양선이영성
    • H02J13/00H02H7/26G01R31/08
    • PURPOSE: A distribution automation sever and method which supports the failure recovery of a distribution line are provided to automatically switch and restore a failed section by using failure display information transmitted from an electric power substation breaker, a distribution line breaker, and an opening and closing switch. CONSTITUTION: An electric power substation shearing process part(130) processes a signal received from an electric power substation breaker(10) and a failure display part included in the electric power substation breaker. A distribution line shear process part(140) processes a signal received from a distribution line breaker(30) and a failure display part included in the signal received from a distribution line breaker. An automatic failure treatment part(110) grasps failure situations by using the signal received from the electric power substation breaker or the distribution line breaker as a reference signal. An automatic sectional load calculation part(120) calculates the load of a failure section in order to process malfunctions according to failure type which is grasped in the automatic failure treatment part.
    • 目的:提供支持配电线路故障恢复的配电自动化服务器和方法,通过使用从变电站断路器,配电线路断路器以及开关断开发送的故障显示信息自动切换和恢复故障部分 开关。 构成:电力变电站剪切处理部(130)处理从电力变电站断路器(10)接收的信号和电力变电站断路器中包含的故障显示部。 分配线剪切处理部分(140)处理从分配线路断路器(30)接收的信号和包括在从配电线路断路器接收的信号中的故障显示部分。 自动故障处理部(110)通过使用从电力分配断路器或配电线路断路器接收的信号作为参考信号来掌握故障情况。 自动分段负荷计算部分(120)根据在自动故障处理部分中掌握的故障类型来计算故障部分的负载以便处理故障。