会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • WASTE WATER INSTALLATION AND METHOD FOR REDUCING HIGH CONTENT OF HARMFUL FLUIDS IN WASTE WATER
    • 用于减少废水中有害流体含量高的废水安装和方法
    • WO2013090518A1
    • 2013-06-20
    • PCT/US2012/069407
    • 2012-12-13
    • XYLEM IP HOLDINGS LLC
    • HEDMARK, PerSTRANDBERG, Tore
    • C02F3/12C02F1/72E03F5/18B01D19/00C02F3/20
    • B01D19/0047B01D19/0021C02F1/006C02F1/20C02F1/66C02F2101/101E03F5/18
    • According to a first aspect the present invention relates to a waste water installation for reducing high content of harmful fluids in the waste water, comprising a vessel (2) having an inlet opening (7) for incoming waste water and an outlet opening (8) for outgoing waste water, the inlet opening (7) in the vertical direction being arranged at a level above said outlet opening (8), and a stationary distribution plate (11) that is arranged direct under said inlet opening (7) and in the vertical direction arranged at a level above said outlet opening (8), said distribution plate (11) presenting an upper surface (12) arranged to receive and distribute the from the inlet opening (79 incoming waste water and a peripheral edge (13) over which the waste water is arranged to flow. The waste water installation is characterized in that the distribution plate (11) comprises at least one distribution bracket (15) that is connected to and project upwards at an angle to the upper surface (12) of the distribution plate (11). According to a second aspect the present invention relates to a method for reducing high content of harmful fluids in waste water.
    • 根据第一方面,本发明涉及一种用于减少废水中高含量有害流体的废水装置,包括:具有用于输入废水的入口(7)和出口(8)的容器(2) 对于输出废水,入口开口(7)在垂直方向上布置在所述出口(8)上方的高度,以及固定分配板(11),其直接设置在所述入口(7)的下方,并且在 所述分配板(11)具有上表面(12),该上表面布置成从入口开口(79进入的废水和周边边缘(13))接收和分配 所述废水装置的特征在于,所述分配板(11)包括至少一个分配支架(15),所述分配支架(15)与所述分配板(11)的上表面(12)成一角度地连接并向上突出 日 e分配板(11)。 根据第二方面,本发明涉及一种降低废水中有害流体含量的方法。
    • 2. 发明申请
    • APPARATUS AND PROCEDURE FOR TRAPPING EMBOLIC DEBRIS
    • 用于追踪嵌合体的装置和程序
    • WO2013059603A1
    • 2013-04-25
    • PCT/US2012/061038
    • 2012-10-19
    • DON MICHAEL, T. Anthony
    • DON MICHAEL, T. Anthony
    • A61M1/34A61F2/24
    • A61F2/013A61F2/24A61F2/2436A61F2002/018A61F2230/0067A61F2230/008
    • A collapsible and deployable filter for blocking debris and passing blood in a blood vessel in a patient's body, the filter including; a framework of a flexible material, constructed to have a radially compressed state, in which the framework is radially compressed by radial deforming forces, and a radially expanded state to obdurate an artery; and a flexible filter material secured to said framework and having pores dimensioned to prevent the passage of debris therethrough while allowing the passage of blood. The filter has, in the radially expanded state of the framework, a generally conical or frustoconical form with a large diameter end, a small diameter end opposite to the large diameter end, and a side surface extending between the ends. The filter has an opening that is free of filter material at the small diameter end or in the side surface.
    • 一种可折叠和可部署的过滤器,用于阻挡碎片并将血液传递到患者体内的血管中,所述过滤器包括: 柔性材料的框架被构造成具有径向压缩状态,其中框架通过径向变形力径向压缩,并且径向膨胀状态以使动脉变得模糊; 以及柔性过滤材料,其固定到所述框架并且具有尺寸设置为防止碎屑通过而允许血液通过的孔。 过滤器在框架的径向膨胀状态下具有大直径锥形或截头圆锥形,其具有大直径端,与大直径端相对的小直径端,以及在端部之间延伸的侧表面。 过滤器在小直径端或侧面具有不含过滤材料的开口。
    • 4. 发明申请
    • INHIBITION OF PULMONARY FIBROSIS WITH NUTLIN-3A AND PEPTIDES
    • 用NUTLIN-3A和PEPTID抑制肺动脉硬化
    • WO2014145389A1
    • 2014-09-18
    • PCT/US2014/030147
    • 2014-03-17
    • BOARD OF REGENTS, THE UNIVERSITY OF TEXAS SYSTEM
    • SHETTY, SreeramaIDELL, Steven
    • C07K7/06C07K7/08A61K38/08A61K38/10A61K31/496A61P43/00
    • C07K7/06A61K9/0019A61K9/007A61K31/497A61K38/00A61K38/08A61K38/177C07K7/08A61K2300/00
    • In fibrotic lung fibroblasts, basal levels of p53 protein (and miR-34a) are markedly suppressed, leading to reduced p53-mediated inhibition of uPA and uPAR, or concurrent induction of PAI-1. These changes contribute to excessive FL-fibroblast proliferation and production of extracellular matrix (ECM), and, therefore, pulmonary fibrosis. These processes are reversed by treating the cells, and treating subjects suffering from idiopathic pulmonary fibrosis (IPF) with the small organic molecule nutlin-3a (NTL) or with a peptide, CSP-4 (SEQ ID NO:1), or variants or derivatives or multimers of this peptide, which increase p53 levels by inhibiting MDM2-mediated degradation of p53 protein. Use of these compounds serves as a new approach to the treatment of IPF, as they restore p53 expression and p53-mediated changes in the uPA-fibrinolytic system in FL-fibroblasts and restrict production and deposition of ECM.
    • 在纤维化肺成纤维细胞中,p53蛋白(和miR-34a)的基础水平被显着抑制,导致p53介导的uPA和uPAR抑制或PAI-1的并发诱导减少。 这些变化有助于过度的FL-成纤维细胞增殖和细胞外基质(ECM)的产生,因此导致肺纤维化。 这些过程通过治疗细胞和用小有机分子nutlin-3a(NTL)或用肽CSP-4(SEQ ID NO:1)或变体或特异性的方式治疗患有特发性肺纤维化(IPF)的受试者来逆转, 该肽的衍生物或多聚体,其通过抑制MDM2介导的p53蛋白的降解来增加p53水平。 这些化合物的使用作为治疗IPF的新方法,因为它们恢复了FL-成纤维细胞中uPA-纤维蛋白溶解系统中的p53表达和p53介导的变化,并限制了ECM的产生和沉积。
    • 5. 发明申请
    • CONTAINER CAP
    • 集装箱盖
    • WO2011079301A1
    • 2011-06-30
    • PCT/US2010/062066
    • 2010-12-23
    • COSTA, GiuseppeGERAGHTY, Erin
    • COSTA, Giuseppe
    • B65D1/02B65D47/26B65D47/32B65D51/16
    • B65D1/0292B65D47/265B65D47/32B65D51/1644Y10S215/90
    • A compressible container (200) has a cap (100) configured to engage therewith. The cap (100) includes a first valve (150), preferably in the form of first and second disks (112,120), one above another, each disk having at least one hole (113,122) therethrough. The disks are rotatable with respect to one another The holes (113,122) of the first and second disks (112,120) align in a first position to create channel therethrough and misalign in the second position to close the channel. The cap (100) may also include a second valve (130) connected to the channel. The second valve (130) may comprise a ball (134) inside a conic section tube (132). The ball (134) is designed to float on the liquid (300) so that any liquid (300) attempting to exit the container cap (100) will be prevented from doing so as the second valve (130) will be closed when the liquid forces the ball (134) into engagement with the conic section tube (132).
    • 可压缩容器(200)具有被配置为与其接合的盖(100)。 盖(100)包括第一阀(150),优选地为第一和第二盘(112,120)的形式,一个在另一个上,每个盘具有穿过其中的至少一个孔(113,122)。 盘可以相对于彼此旋转。第一和第二盘(112,120)的孔(113,122)在第一位置对齐以产生穿过其中的通道,并且在第二位置不对准以关闭通道。 盖(100)还可以包括连接到通道的第二阀(130)。 第二阀(130)可以包括在锥形截面管(132)内的球(134)。 球(134)被设计成漂浮在液体(300)上,使得试图离开容器盖(100)的任何液体(300)将被防止这样做,因为第二阀(130)将在液体 迫使球(134)与圆锥截面管(132)接合。
    • 6. 发明申请
    • PUMP CONTROL INCLUDING CLEANING PROCEDURE OR STOPPING DEPENDING ON MOTOR LOAD
    • 泵控制,包括清洁程序或停止依赖于电机负载
    • WO2013096726A1
    • 2013-06-27
    • PCT/US2012/071154
    • 2012-12-21
    • XYLEM IP HOLDINGS LLC
    • FULLEMANN, AlexanderSODERLUND, FredrikKARLEN, Mats
    • F04D15/02F04D7/04F04D15/00F04D29/70
    • F04D15/0254F04D7/04F04D13/08F04D15/0066F04D15/0236F04D29/708
    • The invention relates to a method for controlling a pump arrangement comprising a pump (2) having a motor (7) and a control unit (6), said motor (7), when the pump (2) is in an active state and the motor (7) is driven in a first direction, being associated with a load factor that corresponds to an operating condition of the pump arrangement; the pump arrangement also comprising means for monitoring at least one operating parameter from which the load factor of the motor (7) can be derived. The method comprises the steps of determining a real value of said at least one operating parameter, determining if an externally applied force is acting on the motor (7) to such an extent that an operating condition detrimental to the pump arrangement is initiated, effecting a state shift from the active state to an inactive state of the pump (2) if an operating condition detrimental to the pump arrangement is initiated, the state shift comprising that the control unit (6), immediately after a detrimental operating condition is initiated, abruptly breaks the driving of the motor (7) in said first direction.
    • 本发明涉及一种用于控制泵装置的方法,其包括具有马达(7)和控制单元(6)的泵(2),所述马达(7)当所述泵(2)处于活动状态时 马达(7)沿第一方向被驱动,与与泵装置的运行状态对应的负载系数相关联; 所述泵装置还包括用于监测至少一个操作参数的装置,从所述至少一个操作参数可以导出所述电动机(7)的负载系数。 该方法包括以下步骤:确定所述至少一个操作参数的实际值,确定外部施加的力是否作用在马达(7)上,使得启动对泵装置有害的操作条件,从而实现 如果启动对泵装置有害的操作条件,状态从活动状态转移到泵(2)的非活动状态,则包含控制单元(6)在紧急有害操作条件启动之后突然间 在所述第一方向断开电动机(7)的驱动。
    • 7. 发明申请
    • PROPELLER PUMP AND PUMP STATION
    • 螺旋桨泵和泵站
    • WO2013090500A2
    • 2013-06-20
    • PCT/US2012/069373
    • 2012-12-13
    • XYLEM IP HOLDINGS LLC
    • BURMAN, Joergen
    • G11C29/00
    • F04D3/00F04D3/02F04D29/528F04D29/548
    • According to a first aspect, the present invention relates to a propeller pump comprising a pump housing and a pump core that is arranged in the pump housing and has a propeller, which together delimit a channel, and which are connected by means of a guide vane. The propeller pump is characterized in that a cross-sectional area (A2) of the channel (27) at the rear edge (30) of the guide vane (13) has a measure that is greater than, and that is less than a factor of 1,1 times, a cross-sectional area (A1) at the rear edge (29) of the blades (21) of the propeller, and that the specific rotational speed of the propeller pump is greater than 200 and less than 300. According to a second aspect, the present invention relates to a pump station comprising such a propeller pump.
    • 根据第一方面,本发明涉及一种螺旋桨泵,其包括泵壳和泵芯,所述泵壳和泵芯布置在泵壳体中并且具有螺旋桨,该螺旋桨一起限定通道,并且通过导叶连接 。 螺旋桨泵的特征在于,在导叶(13)的后边缘(30)处的通道(27)的横截面面积(A2)具有大于并且小于一个因子的量度 是螺旋桨的叶片(21)的后边缘(29)处的横截面面积(A1),并且螺旋桨泵的比旋转速度大于200且小于300。 根据第二方面,本发明涉及一种包括这种螺旋桨泵的泵站。