会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Furnace for reheating, holding and storing of metallurgical products
    • 冶金产品再加热,储存和储存炉
    • US5607144A
    • 1997-03-04
    • US524675
    • 1995-09-08
    • Didier BrunFran.cedilla.ois PahmerJean-Claude Audebert
    • Didier BrunFran.cedilla.ois PahmerJean-Claude Audebert
    • C21D1/00B21B1/46C21D9/00F27B9/20C21B3/00
    • C21D9/0081B21B1/466F27B9/202
    • Furnace for storing, reheating and holding ferrometallurgical products, in which the products travel along a displacement path on members placed so as to connect, in the tranverse direction, a charging zone and a discharging zone, the reheating and holding zones including, on the one hand, product-supporting members and transporting members placed at a certain distance from the supporting members and being able to perform a rising movement with respect to these and a horizontal displacement movement making the product advance step by step. The storage includes, in addition to the supporting members and transporting members of the type described hereinabove, at least one set of movable supporting members, independent of the hearth of the furnace, able to move with a horizontal alternating translational movement which is performed during the return phase of the transporting members and, upon a complete rectangular cycle of the transporting members, the charge (P) has progressed forwards by a distance equal to the sum of the steps of the displacements of the supporting members and the transporting members.
    • 用于储存,再加热和保持冶金产品的炉,其中产品沿着位置路径移动,所述构件被放置成在横向方向上连接充电区和排放区,所述再加热和保持区包括在一个 手,产品支撑构件和运输构件放置在与支撑构件一定距离处,并且能够执行相对于这些的上升运动和水平位移运动,使得产品逐步前进。 除了上述类型的支撑构件和输送构件之外,储存器还包括除了炉子之外的至少一组可移动支撑构件能够以水平交替的平移运动移动,该水平交替平移运动在 运输构件的返回阶段,并且在运输构件的完整的矩形循环之后,装料(P)向前前进了等于支撑构件和运送构件的位移的总和的距离。
    • 3. 发明授权
    • Galvanization installations of metallic bands
    • 金属带镀锌装置
    • US4446812A
    • 1984-05-08
    • US374262
    • 1982-05-03
    • Robert Wang
    • Robert Wang
    • C23C2/00C23C2/40B05C1/08B05C3/172
    • C23C2/40C23C2/006
    • An installation includes a first fixed return roller, positioned above the melted zinc bath level and along which passes the band to be galvanized, when exiting from a galvanization tromp. A second return roller is mounted on a mobile arm and guides the band, after galvanization to an excess metal removing device. A coating roller, mounted on a mobile arm is adapted to be brought to two positions, a first position where it dips into the zinc bath for coating a determined face of the band, and a second position where it is moved clear of the path followed by the band. A bottom roller is supported by a mobile arm so as to be movable to two positions, a working position at the bottom of the tank, so as to provide for the immersion of the band in contact with such roller for carrying out galvanization of both faces, and a rest position clear from the path followed by the band.
    • 安装包括第一固定返回辊,位于熔融锌浴水平面上方,并且当从镀锌梯架退出时,其通过待镀锌带。 第二返回辊安装在移动臂上并在镀锌后引导带到多余的金属去除装置。 安装在移动臂上的涂布辊适于被带到两个位置,其中它浸入锌浴中以涂覆所述带的确定的面部的第一位置,以及第二位置,在该位置上,所述第二位置沿着所述路径移动 由乐队。 底辊由移动臂支撑,以便能够移动到两个位置,即罐的底部的工作位置,以便使带子浸入与这种辊接触以进行两面的镀锌 ,并且从该乐队后面的路径中清除静止位置。