会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 62. 发明专利
    • DE69606716T2
    • 2000-09-07
    • DE69606716
    • 1996-12-06
    • WEATHERFORD LAMB
    • GUDMESTAD TARALD
    • E21B33/16
    • PCT No. PCT/GB96/03006 Sec. 371 Date May 21, 1998 Sec. 102(e) Date May 21, 1998 PCT Filed Dec. 6, 1996 PCT Pub. No. WO97/21019 PCT Pub. Date Jun. 12, 1997A plug launching device for use in cementing operations in the construction of oil and gas wells, the device having, in certain embodiments, a tubular member with an upper section and a lower section which can accommodate at least a bottom plug and a top plug, the upper section having a floor and the lower section movable relative to the upper section so that when a first dart is pumped into the upper section by cement, the cement is diverted to raise the lower section to release the bottom plug, and when a second dart is pumped into the upper section by hydraulic fluid, it lands on the first dart and the hydraulic fluid is diverted to raise the lower section to further release the top plug.
    • 64. 发明专利
    • Plug launching device
    • AU705784B2
    • 1999-06-03
    • AU1181197
    • 1996-12-06
    • WEATHERFORD LAMB
    • GUDMESTAD TARALD
    • E21B33/16
    • PCT No. PCT/GB96/03006 Sec. 371 Date May 21, 1998 Sec. 102(e) Date May 21, 1998 PCT Filed Dec. 6, 1996 PCT Pub. No. WO97/21019 PCT Pub. Date Jun. 12, 1997A plug launching device for use in cementing operations in the construction of oil and gas wells, the device having, in certain embodiments, a tubular member with an upper section and a lower section which can accommodate at least a bottom plug and a top plug, the upper section having a floor and the lower section movable relative to the upper section so that when a first dart is pumped into the upper section by cement, the cement is diverted to raise the lower section to release the bottom plug, and when a second dart is pumped into the upper section by hydraulic fluid, it lands on the first dart and the hydraulic fluid is diverted to raise the lower section to further release the top plug.
    • 67. 发明专利
    • NO333574B1
    • 2013-07-15
    • NO20040085
    • 2004-01-09
    • WEATHERFORD LAMB
    • PEDERSEN GERALD DEANGUDMESTAD TARALDHIRTH DAVID E
    • E21B33/128
    • The present invention is a packer for sealing an annular region in a wellbore. The packer includes a packing element which is held through bidirectional forces. The packer first comprises an inner mandrel. Disposed around the inner mandrel are three tubulars: (1) a top sleeve; (2) a bottom sleeve; and (3) a booster sleeve. A packing element is disposed circumferentially around the outer surface of the booster sleeve. The top sleeve and bottom sleeve each include an upper compression member which rides across the booster sleeve in order to compress the packing element. The packing element is expanded outward from the packer to engage a surrounding string of casing through compressive forces provided by the top and bottom sleeves. Thereafter, differential pressure applied above or below the packer acting on the packer element and booster sleeve may provide additional compression of the packer element.
    • 70. 发明专利
    • NO20072194L
    • 2007-10-29
    • NO20072194
    • 2007-04-27
    • WEATHERFORD LAMB
    • GUDMESTAD TARALDGRAMSTAD BERNTBAUSTAD TERJE
    • E21B33/12
    • Disclosed herein is a temporary well isolation device, which is sealingly disposable in downhole tubing, and which has a housing with an axial passage. The temporary well isolation device also has frangible barrier element within the housing, where the frangible barrier element is sealingly engaged in the passage blocking fluid flow through the passage. The frangible barrier element bears a load from fluid pressure. The temporary well isolation device also has a disengageable constraint in contact with a frangible barrier element so as to redirect the load on the frangible barrier element from a first component of the load to a second component of the load, thereby preventing rupture of the frangible barrier element. Also disclosed herein is a method for disintegrating a frangible barrier element disposed in a passage of a temporary well isolation device.