会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 61. 发明授权
    • AD converter and display unit
    • AD转换器和显示单元
    • US07382306B2
    • 2008-06-03
    • US11557302
    • 2006-11-07
    • Ken Takahashi
    • Ken Takahashi
    • H03M1/34
    • H03M1/367
    • An AD converter includes: a reference voltage generator circuit having a plurality of resistors connected in series with predetermined reference voltage applied to both ends thereof, the reference voltage being divided at connecting points between the individual resistors to generate a plurality of reference voltages; a voltage comparator circuit configured to compare the plurality of reference voltages and analog input signals for conversion into predetermined comparison output signals; and a variable voltage circuit connected to the connecting points of the reference voltage generator circuit and provided with a control signal input terminal inputted with control signals, configured to set an output voltage to be outputted to the connecting points at a predetermined value based on the control signals.
    • AD转换器包括:参考电压发生器电路,其具有与施加到其两端的预定参考电压串联的多个电阻器,参考电压在各个电阻器之间的连接点处被分压以产生多个参考电压; 电压比较器电路,被配置为将所述多个参考电压和模拟输入信号进行比较以转换成预定的比较输出信号; 以及可变电压电路,其连接到所述参考电压发生器电路的连接点,并且设置有输入有控制信号的控制信号输入端子,所述控制信号输入端子基于所述控制信号设定输出到所述连接点的预定值 信号。
    • 63. 发明申请
    • Parallel-distributed-processing program and parallel-distributed-processing system
    • 并行分布式处理程序和并行分布式处理系统
    • US20070226743A1
    • 2007-09-27
    • US11488229
    • 2006-07-18
    • Ken Takahashi
    • Ken Takahashi
    • G06F9/46
    • G06F9/5066G06F2209/5014
    • In a parallel-distributed-processing program/system, data volume of a processing object of a given job is measured, resource demand required for processing is estimated on the basis of the measured data volume, the resources corresponding to the estimated demand are reserved in a resource pool, the assignment of a job to the respective reserved resources is optimized in response to the throughput of the resources so as to almost equalize the processing time in the resources, the job is divided into a plurality of child jobs according to the optimized assignment, the divided child jobs are inputted into the resources, respectively, the child jobs that are distributed and processed by the resources are combined, the reserved resources are released.
    • 在并行分布处理程序/系统中,测量给定作业的处理对象的数据量,根据所测量的数据量来估计处理所需的资源需求,将所估计的需求对应的资源保留在 资源池,响应于资源的吞吐量来优化对相应的保留资源的作业的分配,以使资源中的处理时间几乎相等,根据优化的作业被划分为多个子作业 分配的子作业分别输入到资源中,由资源分配和处理的子作业被组合,保留的资源被释放。