会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 63. 发明专利
    • SLOPE COLLAPSE PREVENTION METHOD BY MEMBRANOUS BODY
    • JPH07138962A
    • 1995-05-30
    • JP29159193
    • 1993-11-22
    • DOBOKU KENKYU CENTER
    • FUKUOKA MASAMISENDA SHOHEI
    • E02D3/00E02D17/20
    • PURPOSE:To prevent the collapse of a slope by boring holes in the approximately horizontal direction from the surface of the earth of the slope up to specific depth with a boring machine, and inserting impermeable or semipermeable membranous bodies in the holes. CONSTITUTION:Boring trenches are formed in the ground in the approximately horizontal direction from the surface of the earth up to specific depth in a natural bedrock and a cutting natural bedrock S. After that, boring bodies are pulled out, and impermeable or semipermeable membranous bodies 1 are buried over a plurality of up and down stages. Thus, rain water permeated from the surface of the earth is cut off by the membranous bodies 1 so that it permeates no further depth mentioned above. Percolating water cut off by the membranous bodies 1 is led to the surface of the earth and is discharged. According to the constitution, the permeation of rain water, etc., is prevented or decreased and, at the same time, the bedrock can be reinforced to prevent the collapse of the bedrock effectively.