会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 44. 发明专利
    • TWIN ROLL CONTINUOUS CASTING METHOD AND APPARATUS THEREOF
    • JP2000202588A
    • 2000-07-25
    • JP534899
    • 1999-01-12
    • NIPPON STEEL CORP
    • ARAI TAKASHIIZU TADAHIROISAKI HIROSHI
    • B22D11/06
    • PROBLEM TO BE SOLVED: To provide a twin roll continuous casting method and an apparatus thereof, with which the pushing control of a side weir can be executed in response to the displacement of the end surfaces of cooling rolls during executing the casting. SOLUTION: A relational expression is beforehand obtained from many preceded casting heats and the temperature of cooling water for cooling the inner part of the cooling roll 1 at the flow-in side and the flow-out side is measured continuously during executing the actual casting. As the other way, the displacement of the rotating shaft of the cooling roll 1 is measured and this measured value is used and the displacement of the end surface of the cooling roll 1 is estimated from the above relational expression, and based on this estimated value, one side or both of the pushing force and the pushing speed of the side weir 3 are controlled. Further, as the other way, the displacement of the end surface of the cooling roll is measured continuously during executing the actual casting, and based on this measured value, one side or both of the pushing force and the pushing speed of the side weir are controlled.
    • 50. 发明专利
    • CONTINUOUS CASTING TUNDISH
    • JP2003245756A
    • 2003-09-02
    • JP2002047801
    • 2002-02-25
    • NIPPON STEEL CORP
    • TAKEUCHI TOMOHIDEIZU TADAHIROKOBAYASHI HIDEAKI
    • B22D11/10B22D41/00
    • PROBLEM TO BE SOLVED: To prevent the occurrence of a defect of a cast slab caused by pouring slag and non-metallic inclusions or the like mixed into molten steel supplied inside a tundish together with the molten steel inside a mold, and to prevent the occurrence of clogging of an immersion nozzle or the like caused by the relatively low temperature molten steel poured first inside the tundish at the start of casting. SOLUTION: In the tundish in which a molten steel entering chamber 3 and a molten steel exiting chamber 4 are separated by a partitioning weir 2 inside the tundish 1, a molten steel flowing-out hole 5 is formed in the lower part of the partitioning weir 2, and at the same time, a refractory cover 6 to seal the molten steel flowing-out hole 5 is mounted on the partitioning weir 2 by a fixture. After the molten steel is once stored in the molten steel entering chamber 3, it flows inside the molten steel exiting chamber 4 overflowing from the partitioning weir 2 and when the fixture is melt, the refractory cover 6 is floated up and the molten steel flowing-out hole 5 is opened. COPYRIGHT: (C)2003,JPO