会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 43. 发明授权
    • Gravel packing methods
    • 砾石包装方式
    • US07661476B2
    • 2010-02-16
    • US11983445
    • 2007-11-09
    • Charles S. YehDavid C. HaeberleMichael D. BarryMichael T. HeckerTed A. Long
    • Charles S. YehDavid C. HaeberleMichael D. BarryMichael T. HeckerTed A. Long
    • E21B43/04
    • E21B17/02E21B43/04E21B43/08
    • A method associated with the production of hydrocarbons is described. The method includes drilling a wellbore using a drilling fluid, conditioning the drilling fluid, running a production string in the wellbore and gravel packing an interval of the wellbore with a carrier fluid. The production string includes a joint assembly comprising a main body portion having primary and secondary fluid flow paths, wherein the main body portion is attached to a load sleeve assembly at one end and a torque sleeve assembly at the opposite end, the load sleeve assembly having at least one transport conduit and at least one packing conduit disposed therethrough. The main body portion may include a sand control device, a packer, or other well tool for use in a downhole environment. The joint assembly also includes a coupling assembly having a manifold region in fluid flow communication with the second fluid flow path of the main body portion and facilitating the make-up of first and second joint assemblies with a single connection.
    • 描述了与烃的生产相关的方法。 该方法包括使用钻井液钻井孔,调节钻井液,在井眼中运行生产线,并用载液流砾石填充井筒间隔。 生产线包括接头组件,该接头组件包括主体部分,该主体部分具有主要和次要流体流动路径,其中主体部分在一端附接到负载套筒组件,在另一端附接到扭矩套筒组件,负载套筒组件具有 至少一个输送管道和至少一个通过其设置的填料导管。 主体部分可以包括用于在井下环境中使用的砂控制装置,封隔器或其它井工具。 接头组件还包括联接组件,其具有与主体部分的第二流体流动路径流体连通的歧管区域,并且有助于通过单个连接件组装第一和第二接头组件。
    • 44. 发明申请
    • Gravel packing methods
    • 砾石包装方式
    • US20080128129A1
    • 2008-06-05
    • US11983445
    • 2007-11-09
    • Charles S. YehDavid C. HaeberleMichael D. BarryMichael T. HeckerTed A. Long
    • Charles S. YehDavid C. HaeberleMichael D. BarryMichael T. HeckerTed A. Long
    • E21B43/16
    • E21B17/02E21B43/04E21B43/08
    • A method associated with the production of hydrocarbons is described. The method includes drilling a wellbore using a drilling fluid, conditioning the drilling fluid, running a production string in the wellbore and gravel packing an interval of the wellbore with a carrier fluid. The production string includes a joint assembly comprising a main body portion having primary and secondary fluid flow paths, wherein the main body portion is attached to a load sleeve assembly at one end and a torque sleeve assembly at the opposite end, the load sleeve assembly having at least one transport conduit and at least one packing conduit disposed therethrough. The main body portion may include a sand control device, a packer, or other well tool for use in a downhole environment. The joint assembly also includes a coupling assembly having a manifold region in fluid flow communication with the second fluid flow path of the main body portion and facilitating the make-up of first and second joint assemblies with a single connection.
    • 描述了与烃的生产相关的方法。 该方法包括使用钻井液钻井孔,调节钻井液,在井眼中运行生产线,并用载液流砾石填充井筒间隔。 生产线包括接头组件,该接头组件包括主体部分,该主体部分具有主要和次要流体流动路径,其中主体部分在一端附接到负载套筒组件,在另一端附接到扭矩套筒组件,负载套筒组件具有 至少一个输送管道和至少一个通过其设置的填料导管。 主体部分可以包括用于在井下环境中使用的砂控制装置,封隔器或其它井工具。 接头组件还包括联接组件,其具有与主体部分的第二流体流动路径流体连通的歧管区域,并且有助于通过单个连接件组装第一和第二接头组件。
    • 48. 发明授权
    • Wellbore method and apparatus for sand and inflow control during well operations
    • 井眼操作中砂井和流入控制的井筒方法和装置
    • US07984760B2
    • 2011-07-26
    • US12279176
    • 2007-02-23
    • David C. HaeberleCharles YehTimothy G. BenishMichael D. BarryMichael T. HeckerJon Blacklock
    • David C. HaeberleCharles YehTimothy G. BenishMichael D. BarryMichael T. HeckerJon Blacklock
    • E21B43/04E21B43/08
    • E21B43/04E21B33/12E21B43/08
    • A method, system and apparatus associated with the production of hydrocarbons are described. The system includes a wellbore that accesses a subsurface reservoir; a production tubing string disposed within the wellbore; and one or more sand control devices coupled to the production tubing string and disposed within the wellbore. At least one of the sand control devices includes a first tubular member having a permeable section and a non permeable section; a second tubular member disposed within the first tubular member. The second tubular member has a plurality of openings and an inflow control device that each provide a flow path to the interior of the second tubular member. Also, the at least one of the sand control devices includes a sealing mechanism disposed between the first tubular member and the second tubular member. The sealing mechanism is configured to provide a pressure loss during gravel packing operations that is less than the pressure loss during at least some of the production operations.
    • 描述了与烃的生产相关的方法,系统和装置。 该系统包括访问地下储层的井眼; 设置在井眼内的生产油管柱; 以及耦合到生产油管柱并设置在井眼内的一个或多个防砂装置。 至少一个防砂装置包括具有可渗透部分和不可渗透部分的第一管状部件; 设置在第一管状构件内的第二管状构件。 第二管状构件具有多个开口和流入控制装置,其各自提供到第二管状构件内部的流动路径。 此外,所述至少一个所述防砂装置包括设置在所述第一管状构件和所述第二管状构件之间的密封机构。 密封机构构造成在砾石包装操作期间提供小于在至少一些生产操作期间的压力损失的压力损失。