会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 32. 发明授权
    • Computer system, data migration monitoring method and data migration monitoring program
    • 计算机系统,数据迁移监控方法和数据迁移监控程序
    • US07636827B2
    • 2009-12-22
    • US11603089
    • 2006-11-22
    • Masayasu AsanoTetsuya MaruyamaMasayuki Yamamoto
    • Masayasu AsanoTetsuya MaruyamaMasayuki Yamamoto
    • G06F12/00G06F13/00G06F13/28
    • G06F3/0653G06F3/0605G06F3/0647G06F3/067G06F3/0671Y10S707/99953Y10S707/99955
    • A management computer monitors an allocated capacity of a source virtual volume and an allocated capacity of a virtual pool having a storage area allocated to a destination virtual volume in a storage, judges whether the allocated capacity of the source virtual volume can be covered in the virtual pool or not, and informs the user of a result that data migration fails when the allocated capacity of the source virtual volume cannot be covered. When the allocated capacity of the source virtual volume cannot be covered, the management computer uses another storage area to increase the capacity of the virtual pool. Accordingly, when data migration is performed between the virtual volumes, capacities of physical areas allocated to the source virtual volume and the destination virtual volume can be grasped so that the data migration can be performed accurately between the source virtual volume and the destination virtual volume.
    • 管理计算机监视分配的源虚拟卷的容量和具有分配给存储器中的目的地虚拟卷的存储区域的虚拟池的分配容量,判断虚拟卷中的分配容量是否可以被覆盖 池,并且当源虚拟卷的分配容量不能被覆盖时,通知用户数据迁移失败的结果。 当不能覆盖源虚拟卷的分配容量时,管理计算机使用另一个存储区来增加虚拟池的容量。 因此,当在虚拟卷之间执行数据迁移时,可以掌握分配给源虚拟卷的物理区域的容量和目的虚拟卷,从而能够在源虚拟卷和目的地虚拟卷之间准确地执行数据迁移。
    • 33. 发明授权
    • Data recovery method for computer system
    • 计算机系统的数据恢复方法
    • US07506117B2
    • 2009-03-17
    • US11340280
    • 2006-01-25
    • Masayuki YamamotoMasayasu AsanoTakashi OedaTomohiko Suzuki
    • Masayuki YamamotoMasayasu AsanoTakashi OedaTomohiko Suzuki
    • G06F12/16
    • G06F11/1456G06F11/1469G06F11/1471
    • To reduce a burden imposed on a system administrator in restore operation, there is provided a computer system including at least one storage system, at least one host computer, and a management computer, in which: the storage system includes: a first processor; a first memory; and a disk drive; the host computer includes: a second processor; and a second memory; the management computer includes: a third processor; and a third memory; the second processor executes plurality of applications; the first processor and the second processor create check points to be used to maintain consistency of data at predetermined timing for the respective applications; and a third processor obtains recovery conditions, which are conditions for a check point to be used for a recovery, and identifies a check point, which satisfies the obtained conditions, from the created check points for the respective applications.
    • 为了减少在还原操作中对系统管理员的负担,提供了一种包括至少一个存储系统,至少一个主计算机和管理计算机的计算机系统,其中:所述存储系统包括:第一处理器; 第一个记忆; 和磁盘驱动器; 所述主计算机包括:第二处理器; 和第二存储器; 管理计算机包括:第三处理器; 和第三存储器; 第二处理器执行多个应用; 第一处理器和第二处理器创建检查点以用于在各个应用的预定定时保持数据的一致性; 并且第三处理器获得作为用于恢复的检查点的条件的恢复条件,并且从针对各个应用的创建的检查点识别满足获得的条件的检查点。
    • 37. 发明授权
    • Data migrating method taking end time into consideration
    • 考虑结束时间的数据迁移方法
    • US08171245B2
    • 2012-05-01
    • US12871961
    • 2010-08-31
    • Tetsuya MaruyamaYuichi TaguchiMasayasu AsanoMasayuki Yamamoto
    • Tetsuya MaruyamaYuichi TaguchiMasayasu AsanoMasayuki Yamamoto
    • G06F12/16
    • G06F3/0665G06F3/0607G06F3/061G06F3/0647G06F3/067
    • There is provided a data migrating method including the steps of: calculating, in a case where data stored in a volume is migrated to another volume, a required period of time for migrating the data based on a size of data to be migrated and volume configuration information on the volume in which the migrated data is stored and the volume to which the data is to be migrated; determining a start time at which the data migration starts to generate a volume migration plan; setting a priority of the generated volume migration plan; prioritizing, in a case where a periods of time during which the generated volume migration plan is executed and a period of time during which an existing volume migration plan is executed are overlapped with each other, and changing the start time of at least one of those volume migration plans having a lower priority.
    • 提供了一种数据迁移方法,包括以下步骤:在存储在卷中的数据被迁移到另一卷的情况下,基于要迁移的数据的大小和卷配置来计算迁移数据所需的时间段 存储迁移数据的卷的信息以及要迁移数据的卷; 确定数据迁移开始的开始时间以生成卷迁移计划; 设置生成的卷迁移计划的优先级; 在执行生成的卷迁移计划的时间段和执行现有卷迁移计划的时间段彼此重叠的同时,改变其中的至少一个的开始时间, 卷迁移计划具有较低的优先级。